Charging For Civil Engineering Services - Group 6
Charging For Civil Engineering Services - Group 6
- Salary costs
- Overhead
- Direct non-salary expenses
- Fixed fee, an amount to compensate the Civil Engineer for
contingencies, interest on invested capital, readiness to serve, and
profit.
Fixed Price
The fixed price can be calculated as the sum total of estimated engineering
costs for salaries, overhead and non-salary expenses, an allowance for
contingencies, interest on invested capital, readiness to serve, and a
reasonable amount for profit. Fixed price compensation for basic services
on certain design-type projects can also be computed as an appropriate
percentage of estimated construction cost.
1. Feasibility Studies – 3%
2. Detailed Engineering Design – 6%
3. Detailed Architectural And Engineering Design – 8%
4. Construction Supervision – 10%
If the Civil Engineer is not the prime professional but renders basic civil
engineering services only, his fee shall be a minimum of 25% of the prime
professional fee.