This document provides information for calculating the bearing capacity and settlement of a 30m long pile with a 0.273m diameter. It includes soil properties, load calculations, and results showing the pile has an axial tension capacity of 369kN, bearing capacity of 640kN, and a total settlement of 247.1mm under a working load of 1594kN. The pile is socketed into rock below -29.3m with properties listed for 5 soil layers above that. Calculations show a factor of safety of 3 for point bearing and 2 for skin friction is achieved.

Uploaded by

Ethan Au
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
595 views5 pages

King Post Calculation

This document provides information for calculating the bearing capacity and settlement of a 30m long pile with a 0.273m diameter. It includes soil properties, load calculations, and results showing the pile has an axial tension capacity of 369kN, bearing capacity of 640kN, and a total settlement of 247.1mm under a working load of 1594kN. The pile is socketed into rock below -29.3m with properties listed for 5 soil layers above that. Calculations show a factor of safety of 3 for point bearing and 2 for skin friction is achieved.

Uploaded by

Ethan Au
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project: Escola Fatima BH3

D= 0.273 : Pile Diameter (m)


t= 0.008 : Pile Wall Thickness (m)
Ab = 0.0293 : Section Area of Pile Base (m^2)
Ap = 0.0067 : Cross Section Area of Pile (m^2)
FOS1 = 3 : Factor of Safety for Point Bearing
FOS2 = 2 : Factor of Safety for Skin Friction
Elevg = 2.20 : Elevation of Ground Level (MSL)
Elevw = 1.00 : Elevation of Water Table (MSL)
Elevh = 1.00 : Elevation of Pile Head (MSL)
L= 30 : Pile Length (m)

Layer No. Soil Type Bottom Elev. g f' Nq


1 Fill -3.6 17 28 25
2 Sand -5.1 18 30 0
3 M.Deposit -6.6 17 35 12
4 Alluv. -36.6 18 30 25
5 C.D.G. -53.1 19 40 100
T= 369 : Tension Capacity (KN)
P= 640 : Bearing Capacity (KN)

Pile Bearing Capacity Computation


Elev. Soil Type g f' Ko d tan d A q p q' fs Ps Nq pb Pp

(m) (KN/m3) (degree) (degree) (m2) (KPa) (KPa) (KPa) (KPa) (KN) (KPa) (KN)

2.20 Fill 17 28 1.00 19 0.34 0.00 0 0 0 0 0 25 0 0


0.70 Fill 17 28 1.00 19 0.34 1.29 3 3 0 0 0 25 0 0
-0.80 Fill 17 28 1.00 19 0.34 1.29 28 18 10 4 5 25 260 0
-2.30 Fill 17 28 1.00 19 0.34 1.29 54 32 21 7 9 25 530 0
-3.80 Fill 18 30 1.00 20 0.36 1.29 80 47 33 12 15 25 819 0
-5.30 Fill 17 35 1.00 23 0.43 1.29 106 62 44 19 25 25 1108 0
-6.80 Fill 18 30 1.00 20 0.36 1.29 132 76 56 20 26 25 1397 0
-8.30 Fill 18 30 1.00 20 0.36 1.29 159 91 68 25 32 25 1704 0
-9.80 Fill 18 30 1.00 20 0.36 1.29 186 106 80 29 38 25 2012 0
-11.30 Fill 18 30 1.00 20 0.36 1.29 213 121 93 34 43 25 2319 0
-12.80 Fill 18 30 1.00 20 0.36 1.29 240 135 105 38 49 25 2627 0
-14.30 Fill 18 30 1.00 20 0.36 1.29 267 150 117 43 55 25 2934 0
-15.80 Fill 18 30 1.00 20 0.36 1.29 294 165 130 47 61 25 3242 0
-17.30 Fill 18 30 1.00 20 0.36 1.29 321 179 142 52 66 25 3549 0
-18.80 Fill 18 30 1.00 20 0.36 1.29 348 194 154 56 72 25 3857 0
-20.30 Fill 18 30 1.00 20 0.36 1.29 375 209 167 61 78 25 4164 0
-21.80 Fill 18 30 1.00 20 0.36 1.29 402 223 179 65 84 25 4472 0
-23.30 Fill 18 30 1.00 20 0.36 1.29 429 238 191 70 90 25 4779 0
-24.80 Fill 18 30 1.00 20 0.36 1.29 456 253 203 74 95 25 5087 0
-26.30 Fill 18 30 1.00 20 0.36 1.29 483 268 216 79 101 25 5394 0
-27.80 Fill 18 30 1.00 20 0.36 1.29 510 282 228 83 107 25 5702 0
-29.30 Fill 18 30 1.00 20 0.36 1.29 537 297 240 87 113 25 6009 176
1163 176
Pile Bearing Capacity Computation
Elev. Soil Type g f' Ko d tan d A q p q' fs Ps Nq

(m) (KN/m3) (degree) (degree) (m2) (KPa) (KPa) (KPa) (KPa) (KN)

2.20 Fill 17 28 1.00 19 0.34 0.00 0 0 0 0 0 25


0.70 Fill 17 28 1.00 19 0.34 1.29 3 3 0 0 0 25
-0.80 Fill 17 28 1.00 19 0.34 1.29 28 18 10 4 5 25
-2.30 Fill 17 28 1.00 19 0.34 1.29 54 32 21 7 9 25
-3.80 Sand 18 30 1.00 20 0.36 1.29 80 47 33 12 15 0
-5.30 M.Deposit 17 35 1.00 23 0.43 1.29 106 62 44 19 25 12
-6.80 Alluv. 18 30 1.00 20 0.36 1.29 132 76 56 20 26 25
-8.30 Alluv. 18 30 1.00 20 0.36 1.29 159 91 68 25 32 25
-9.80 Alluv. 18 30 1.00 20 0.36 1.29 186 106 80 29 38 25
-11.30 Alluv. 18 30 1.00 20 0.36 1.29 213 121 93 34 43 25
-12.80 Alluv. 18 30 1.00 20 0.36 1.29 240 135 105 38 49 25
-14.30 Alluv. 18 30 1.00 20 0.36 1.29 267 150 117 43 55 25
-15.80 Alluv. 18 30 1.00 20 0.36 1.29 294 165 130 47 61 25
-17.30 Alluv. 18 30 1.00 20 0.36 1.29 321 179 142 52 66 25
-20.30 Alluv. 18 30 1.00 20 0.36 1.29 375 209 167 61 78 25
-21.80 Alluv. 18 30 1.00 20 0.36 1.29 402 223 179 65 84 25
-23.30 Alluv. 18 30 1.00 20 0.36 1.29 429 238 191 70 90 25
-26.30 Alluv. 18 30 1.00 20 0.36 1.29 483 268 216 79 101 25
-27.80 Alluv. 18 30 1.00 20 0.36 1.29 510 282 228 83 107 25
-29.30 Alluv. 18 30 1.00 20 0.36 1.29 537 297 240 87 113 25

1163
Project: (Pile on Rock)
pb Pp
Settlement Computation
(KPa) (KN) D= 0.273 : Pile Diameter (m)
Ap = 0.0067 : Cross Section Area of Pile (m^2)
0 0 Ep = 3.92E+04 : Elastic Modulus of Pile (MPa)
0 0 Es = 150 : Elastic Modulus of Soil (MPa)
260 0 where SPT>50
530 0 ns = 0.3 : Poisson Ratio of Soil
0 0 Pdesign = 2700 : Design Load on Pile (kN)
532 0
1397 0 Pile on Rock
1704 0 L= 30 : Embedment Depth (m)
2012 0 At Working Load
2319 0 Pp = 1963 (kN) = 1594 (kN)
2627 0 Pf = 737 (kN) = 1106 (kN)
2934 0 Pa = 2700 (kN)
3242 0 S1 = 246.7 (mm)
3549 0 S2 = - (mm)
4164 0 Sum, S = 247.1 (mm)
4472 0
4779 0
5394 0
5702 0 Settlement Computation
6009 176 D= 0.273 : Pile Diameter (m)
Ap = 0.0067 : Cross Section Area of Pile (m^2)
Ep = 3.92E+04 : Elastic Modulus of Pile (MPa)
Es = 150 : Elastic Modulus of Soil (MPa)
where SPT>50

176
Project: Pile Bearing Capacity Computation Project: (Pile on Rock)
Elev. Soil Type g f' Ko d tan d A q p q' ft Ps Nq pb Pp
D= 0.305 : Pile Width (m) Settlement Computation
B= 0.305 : Pile Breath (m) (m) (KN/m3) (degree) (degree) (m2) (KPa) (KPa) (KPa) (KPa) (KN) (KPa) (KN) B= 0.305 : Pile Breadth (m)
W= 240 : Unit Weight of Pile (kg/m) Ap = 0.0306 : Cross Section Area of Pile (m^2)
Ab = 0.0306 : Section Area of Pile Base (m^2) 2.20 Fill 18 28 0.53 19 0.34 0.00 0 0 0 0 0 25 0 0 Ep = 2.00E+05 : Elastic Modulus of Pile (MPa)
Ap = 0.0306 : Cross Section Area of Pile (m^2) 0.70 Fill 18 28 0.53 19 0.34 2.75 3 0 3 0 1 25 68 0 Es = 150 : Elastic Modulus of Soil (MPa)
p= 1.8300 : Effective Perimeter of Pile (m) -0.80 Fill 18 28 0.53 19 0.34 2.75 30 13 17 3 8 25 424 0 where SPT>50
FOS1 = 3 : Factor of Safety for Point Bearing -2.30 Marine Mud 14.5 0 1.00 0 0.00 2.75 54 27 27 0 0 0 0 0 ns = 0.3 : Poisson Ratio of Soil
FOS2 = 2 : Factor of Safety for Skin Friction -3.80 Marine Mud 14.5 0 1.00 0 0.00 2.75 76 42 34 0 0 0 0 0 Pdesign = 2000 : Design Load on Pile (kN)
Elevg = 2.20 : Elevation of Ground Level (MSL) -5.30 Marine Mud 14.5 0 1.00 0 0.00 2.75 98 57 41 0 0 0 0 0
Elevw = 0.50 : Elevation of Water Table (MSL) -6.80 Marine Mud 14.5 0 1.00 0 0.00 2.75 119 72 48 0 0 0 0 0 Pile on Rock
Elevh = 1.00 : Elevation of Pile Head (MSL) -8.30 Marine Mud 14.5 0 1.00 0 0.00 2.75 141 86 55 0 0 0 0 0 L= 20 : Embedment Depth (m)
L= 20 : Pile Length (m) -9.80 Marine Mud 14.5 0 1.00 0 0.00 2.75 163 101 62 0 0 0 0 0 At Working Load
-11.30 Marine Mud 14.5 0 1.00 0 0.00 2.75 185 116 69 0 0 0 0 0 Pp = 104 (kN) = 1744 (kN)
Layer No. Soil Type Bottom Elev. g f' Nq -12.80 Marine Mud 14.5 0 1.00 0 0.00 2.75 206 130 76 0 0 0 0 0 Pf = 256 (kN) = 256 (kN)
1 Fill -0.83 18 28 25 -14.30 Alluv. Clay 18 20 0.66 13 0.24 2.75 231 145 86 13 37 12 1028 0 Pa = 2000 (kN)
2 Marine Mud -12.83 14.5 0 0 -15.80 Alluv. Clay 18 20 0.66 13 0.24 2.75 258 160 98 15 42 12 1176 0 S1 = 6.1 (mm)
3 Alluv. Clay -18.83 18 20 12 -17.30 Alluv. Clay 18 20 0.66 13 0.24 2.75 285 174 110 17 47 12 1323 0 S2 = - (mm)
4 C.D.G. -26.63 19 30 25 -18.80 Alluv. Clay 18 20 0.66 13 0.24 2.75 312 189 123 19 52 12 1471 0 S3 = 0.1 (mm)
5 C.D.G. -55 20 42 100 -20.30 C.D.G. 19 30 0.50 20 0.36 2.75 339 204 136 25 68 25 3390 104 Sum, S = 6.2 (mm)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
T= 127 : Tension Capacity (KN) #VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
P= 162 : Bearing Capacity (KN) #VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Project: (Pile on Soil)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Settlement Computation
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 B= 0.305 : Pile Breadth (m)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Ap = 0.0306 : Cross Section Area of Pile (m^2)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Ep = 2.00E+05 : Elastic Modulus of Pile (MPa)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Es = 150 : Elastic Modulus of Soil (MPa)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 where SPT>50
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 ns = 0.3 : Poisson Ratio of Soil
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Pdesign = 2000 : Design Load on Pile (kN)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Pile on Soil
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 L= 20 : Embedment Depth (m)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 At Working Load
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Pp = 104 (kN) = 1744 (kN)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Pf = 256 (kN) = 256 (kN)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Pa = 2000 (kN)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 S1 = 6.1 (mm)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 S2 = 92.8 (mm)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 S3 = 0.1 (mm)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0 Sum, S = 99.1 (mm)
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0
#VALUE! #VALUE! #VALUE! #VALUE! 0 0 0 #VALUE! 0 0 0

256 104

You might also like