[CompanyName]
Construction
Quality Assurance/Quality Control Plan
[ProjectName]
[ProjectNumber]
Approved
Customer......................................................................................................................................................7
Project Name................................................................................................................................................7
Project Number............................................................................................................................................7
Project Location............................................................................................................................................7
Overall Project Description...........................................................................................................................7
[CompanyName] Scope of Work..................................................................................................................7
H. Quality Training............................................................................................................................... 30
I. Construction Project Quality Specifications.......................................................................................33
Page 5
[ProjectName] - [ProjectNumber]
Copyright
Control the Continuation of Work.............................................................................................................47
Recording of Nonconformances.................................................................................................................47
Quality Manager Disposition of Nonconformance Reports.......................................................................48
Corrective Actions......................................................................................................................................48
Nonconformance Preventive Actions........................................................................................................49
Punch-Out QC Inspection...........................................................................................................................51
Pre-Final Customer Inspection...................................................................................................................51
Final Acceptance Customer Inspection......................................................................................................52
For each type of quality-controlled material, the Quality Manager determines lot control traceability
requirements, if any, and specifies the means of lot identification. Identification methods may include
physical labels, tags, markings and/or attached certification documents.
When lot-controlled materials are received, the Superintendent verifies that materials have the specified
lot identifications.
The Superintendent maintains lot identification at all production phases from receipt, through production,
installation, or assembly, to final completion. Acceptable methods for preserving lot identification include
physically preserving observable lot identifications, recording the lot identification on a work task quality
inspection form or other work record, or collecting the physical lot identifier as a record along with
supplemented with location.
If lot-controlled materials are without lot identification, the Superintendent deems the materials as
nonconforming and segregates them and/or clearly marks them to prevent inadvertent use. The
Superintendent treats the material according to the company policy for nonconformances. Only the
Quality Manager can re-identify or re-certify the materials.
Material quality inspections and tests ensure that purchased materials meet purchase contract quantity
and quality requirements. The Superintendent inspects or ensures that a qualified inspector inspects
materials prior to use for conformance to project quality requirements.
The Superintendent ensures that each work task that uses the source-inspected materials proceed only
after the material has been accepted by the material quality inspection or test.
Page 37
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Controlled Materials Form
Contract ID Contract Name Preparer Date
[ProjectNumber] [ProjectName]
Contract Section/ Activity Intended Use Lot Traceability Method for identification of
ID Material (if description is necessary) Requirements Approved Inspection Status
Page 38
[ProjectName] - [ProjectNumber]
Copyright
[CompanyName]
Metals Material Receiving Inspection Report
Project ID Project Name P.O.# Supplier Receipt Date
[ProjectNumber] [ProjectName]
Type of Material Material Description Heat Number/ Condition / Damage Color Code Marking
(i.e., steel plate) (nominal dimensions) Serial Number/Markings
EXCEPTIONS:
Questions? Call First Time Quality 410-451-8006
Results of inspections and tests will be recorded on the Inspection and Test Form.
Form exhibits are included as an exhibit in this subsection.
A list of controlled and calibrated test equipment is listed on the Test Equipment Calibration Plan and Log
included as an exhibit in this subsection.
The Quality Manager evaluates the project requirements and determines if there are measuring devices
that require controls to assure quality results.
Page 41
[ProjectName] - [ProjectNumber]
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Quality Inspection and Test Plan
SPECIFICATION
SECTION ACCREDITED/ LOCATION DATE
AND APPROVED OF TEST FORWARDED
PARAGRAPH SCHEDULE LAB ON/OFF DATE TO
NUMBER ACTIVITY ID TEST REQUIRED YES /NO SAMPLED BY TESTED BY SITE/SITE COMPLETED CUSTOMER REMARKS
Page 42
[ProjectName] - [ProjectNumber]
Copyright
[CompanyName]
Test Equipment Calibration Plan and Log
Project ID Project Name Preparer Date
[ProjectNumber] [ProjectName]
[CompanyName]
Construction
Quality Manual
The documents provided by [CompanyName] disclose proprietary company information that is copyright
registered. Please hold these quality documents in confidence and do not share them with other
organizations, even if you do not charge a fee.
Page 1
Quality Manual
Copyright
QUALITY MANUAL
TABLE OF CONTENTS
1.1. Overview................................................................................................................................................6
1.2. [CompanyName] Quality Policy.............................................................................................................6
1.3. Quality Duties, Responsibilities, and Authority.....................................................................................6
1.4. Quality System Performance Measures................................................................................................9
1.5. Customer Satisfaction Performance Measures.....................................................................................9
1.6. Exceptions..............................................................................................................................................9
2.1. Overview..............................................................................................................................................10
2.2. [CompanyName] Project License and Qualification Requirements....................................................10
2.3. Project Personnel and Qualifications..................................................................................................10
2.4. Project Quality Assurance/Quality Control Plan.................................................................................11
2.5. Identification of Quality Controlled Work Tasks.................................................................................12
2.6. Project Quality Inspection and Test Plan............................................................................................12
2.7. Project Quality Communications Plan.................................................................................................12
2.8. Project Quality Training Plan...............................................................................................................12
2.9. Customer Training On Operation and Maintenance...........................................................................12
2.10. Project Records and Documentation Plan........................................................................................13
2.11. Project Audit Plan..............................................................................................................................13
3. Contract Specifications..................................................................................................................... 14
3.1. Overview..............................................................................................................................................14
3.2. Contract Technical Specifications........................................................................................................14
3.3. Contract Drawings...............................................................................................................................14
3.4. Contract Submittals.............................................................................................................................14
3.5. Customer Submittal Approval.............................................................................................................16
3.6. Contract Warranty...............................................................................................................................16
3.7. Contract Review and Approval............................................................................................................17
4. Design Review and Control............................................................................................................... 18
4.1. Overview..............................................................................................................................................18
4.2. Design Input Review............................................................................................................................18
4.3. Project Design Quality Assurance/Quality Control Plan.....................................................................18
4.4. Design Progress Reviews.....................................................................................................................19
4.5. Design Output Verification and Approval...........................................................................................19
5.1. Overview..............................................................................................................................................20
5.2. Regulatory Codes.................................................................................................................................20
5.3. Industry Quality Standards..................................................................................................................20
5.4. Material and Equipment Specifications..............................................................................................20
5.5. Work Process Specifications................................................................................................................21
5.6. Controlled Material Identification and Traceability............................................................................21
5.7. Measuring Device Control and Calibration.........................................................................................21
5.8. [CompanyName] Quality Standards....................................................................................................22
5.9. Application of Multiple Sources of Specifications...............................................................................22
6. Project Purchasing........................................................................................................................... 23
6.1. Overview..............................................................................................................................................23
6.2. Qualification of Outside Organizations and Company Departments..................................................23
6.3. Quality Responsibilities of Key Subcontractor and Supplier Personnel..............................................24
6.4. Requirements for Subcontractor QC Plan...........................................................................................25
6.5. Subcontractor and Supplier Quality Policy..........................................................................................25
6.6. Project Subcontractor and Supplier List..............................................................................................26
6.7. Purchase Order Requirements............................................................................................................26
6.8. Project Purchase Order Approvals......................................................................................................26
7. Process Controls............................................................................................................................... 27
7.1. Overview..............................................................................................................................................27
7.2. Project Startup and Quality Control Coordination Meeting...............................................................27
7.3. Preparatory Project Quality Assurance/Quality Control Plan Planning..............................................27
7.4. Weekly Quality Planning and Coordination Meetings........................................................................28
7.5. Process Control Standards..................................................................................................................28
7.6. Daily Quality Control Report...............................................................................................................30
7.7. Monthly Quality Control Report..........................................................................................................30
8.1. Overview..............................................................................................................................................31
8.2. Required Work Task Quality Inspections and Tests............................................................................31
8.3. Material Inspections and Tests............................................................................................................31
8.4. Work in Process Inspections................................................................................................................32
8.5. Work Task Completion Inspections.....................................................................................................32
8.6. Inspection of Special Processes...........................................................................................................33
8.7. Independent Measurement and Tests................................................................................................33
8.8. Commissioning Functional Acceptance Tests.....................................................................................33
8.9. Hold Points for Customer Inspection..................................................................................................33
8.10. Quality Inspection and Test Specifications........................................................................................33
8.11. Inspection and Test Acceptance Criteria...........................................................................................33
8.12. Inspection and Test Status................................................................................................................34
8.13. Independent Quality Assurance Inspections.....................................................................................34
8.14. Inspection and Test Records.............................................................................................................34
8.15. Project Completion and Closeout Inspection....................................................................................35
9.1. Overview..............................................................................................................................................37
9.2. Nonconformances...............................................................................................................................37
9.3. Corrective Actions...............................................................................................................................38
10.1. Overview............................................................................................................................................39
10.2. Identify Preventive Actions for Improvement...................................................................................39
10.3. Train Preventive Actions for Improvement.......................................................................................39
11.1. Overview............................................................................................................................................41
11.2. Project Quality System Audit.............................................................................................................41
11.3. Company-wide Quality System Audit................................................................................................41
12.1. Overview............................................................................................................................................42
12.2. Quality System Documents...............................................................................................................42
12.3. Document Controls...........................................................................................................................42
12.4. Record Controls.................................................................................................................................43
13. Appendix....................................................................................................................................... 44
7. PROCESS CONTROLS
HOW WORK IS CARRIED OUT
7.1. OVERVIEW
The construction process plan defines how project work is to be done and approved for the overall
project. The construction process plan is communicated to all key personnel, subcontractors and suppliers
in a startup meeting. As the project proceeds, work task plans provide additional details of how each
individual work task is carried out. Work tasks planning meetings are used to communicate expectations
of the work task plan to key personnel responsible for carrying out the work task.
Page 27
Quality Manual
Copyright
7.3.2. PREPARATORY SITE INSPECTION
The Superintendent also performs a quality inspection of the work area and:
During the meeting, the Superintendent communicates the work task quality requirements and reinforces
heightened awareness for critical requirements. Topics for a work task quality plan meeting include:
The meeting is held on a nominal weekly schedule. During the meeting, the Superintendent facilitates
coordination among the participants, communication among the participants, and reinforces heightened
awareness for critical requirements.
The Superintendent maintains a record of the meeting event on the Daily Quality Control Report.
The Quality Manager identifies supplemental start-work requirements that apply to a specific project
when they are necessary to assure quality results.
The Quality Manager identifies supplemental work in process requirements that apply to a specific project
when they are necessary to assure quality results.
The Quality Manager identifies supplemental protection requirements that apply to a specific project
when they are necessary to assure quality results.
Delivery of materials will be planned according to the work progress to minimize storage on site, where
there are higher possibilities of damages and deterioration of materials.
Stored materials will be segregated to prevent cross contamination and limit losses should a delivery be
rejected.
The Superintendent surveys stored materials during daily jobsite reviews and identifies any material that
have incurred damage or otherwise become defective and therefore unfit for use.
Only approved materials are used in the construction process. Only approved materials are specified in
purchase and/or subcontracts.
Materials that are defective, deteriorated, damaged, or not approved are not used. The Superintendent
clearly marks such materials for non-use or otherwise holds them aside.
When customer-supplied materials are lost, damaged, or otherwise found unsuitable for use, the
Superintendent reports such findings to the customer.
When subcontractor–supplied materials are damaged or otherwise found unsuitable for use, the
Superintendent reports such findings to the subcontractor.
The Superintendent ensures that construction uses only materials specified in the contract technical
specifications, contract drawings, and approved submittals. Substitutions are made only by agreement of
the customer and documented by a change order (see section 2.1.3.6).
7.5.5.1. CONTROLLED PRODUCT USE AND INSTALLATION
[CompanyName] construction activities conform to manufacturers’ product use and installation in-
structions that apply to the construction process.
When installing a product, the Superintendent has access to all applicable product installation
instructions.
A nonconformance is any item that does not meet project specifications or [CompanyName] Quality
System requirements.
9.2. NONCONFORMANCES
CONTINUE WORK: When continuing work does not adversely affect quality or hide the defect, work may
continue in the affected area while the disposition of the item is resolved. The Superintendent may place
limitations on the continuation of work.
STOP WORK ORDER: When continuing work can adversely affect quality or hide the defect, work must
stop in the affected area until the disposition of the item resolved. The Superintendent identifies the
limits of the affected area. The Superintendent quickly and clearly identifies the boundaries of the stop
work area.
REPLACE: The nonconformance can be brought into conformance with the original specification
requirements by replacing the nonconforming item with a conforming item.
REPAIR: The nonconformance can be brought into conformance with the original requirements through
completion of required repair operations.
REWORK: The nonconformance can be made acceptable for its intended use, even though it is not
restored to a condition that meets all specification requirements. The Quality Manager may specify
Page 37
Quality Manual
Copyright
standards that apply to the completion of rework. Rework nonconformances must be approved by the
customer.
USE AS-IS: When the nonconforming item is satisfactory for its intended use. Any use as-is items that do
not meet all specification requirements must be approved by the customer.
Furthermore, the Superintendent ensures that previously completed work is reinspected for similar
nonconformances and corrective actions are taken to avert future occurrences (see section 9.3 Corrective
Actions).
When a solution requires changes to [CompanyName] quality standards, the Quality Manager makes
modifications as necessary by making changes to:
Material specifications
Personnel qualifications
Subcontractor and Supplier qualifications
Company standards
Inspection processes
Heightened awareness during quality inspections verifies and documents compliance with the corrective
action improvement items. A qualified Superintendent inspects corrective actions during regular quality
inspections and records observations on the quality inspection form.
The Superintendent notifies affected subcontractors and suppliers of selected preventive action training
requirements.
The Superintendent evaluates the effectiveness of the improvements. The Quality Manager reviews
improvement results recorded on quality inspection records and monthly field reviews. When the Quality
Manager determines that the improvement actions are effective, the item is no longer treated as a
preventive action.
Questions? Call First Time Quality 410-451-8006
[CompanyName]
QA/QC Forms
Page 1
Quality System Forms
Copyright
QUALITY SYSTEM FORMS
TABLE OF CONTENTS
[CompanyName]
Project Submittal Form
Submittal ID# Project ID Project Name Date
[ProjectNumber] [ProjectName]
To: From: Precision Plant Services
Location:
Other:
List of attachments: Remarks:
Submittal Prepared by: Submittal Approved by Precision Plant Services Quality Manager:
Precision Plant Services
Name:
Name:
Title:
Title:
Signature / Date:
Signature / Date:
Customer Disposition: Customer Representative:
Approved
Name:
Conditionally approved, resubmission not required (see
comments) Title:
Disapproved, resubmission required
Signature / Date:
Other:
Comments:
Page 10
Quality System Forms
Copyright
[CompanyName]
Change Order Form
[ProjectNumber] [ProjectName]
Name/Date
Name/Date
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Subcontractor and Supplier Qualification Form
Company Name: Scope of Work (specification sections):
Personnel license, certification, and training required: List each person’s credentials on the Subcontractor and
Supplier Certifications and Licenses form.
Qualifications
Senior person designated as Quality Manager Demonstrated results
Knowledge of Company quality standards Effective self-inspection process
Demonstrated capability to complete work Access to codes, standards and product instructions
to Equipment availability
Company quality standards Production capacity
Demonstrated skills and knowledge Staffing availability
Demonstrated experience
QUALIFICATION NOTES: