This document provides instructions for installing a telephone terminal cabinet and frames, including listing the necessary materials, tools, and steps of the process. It describes checking the vertical and horizontal alignment of the cabinet, locating power and ground terminations, and ensuring mounting screws are installed on the sides. Learners are given tasks to demonstrate their understanding, such as arranging the steps in order and discussing the purposes of installing a telephone terminal cabinet.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
525 views4 pages

q4 Ia Eim 11 Week 2

This document provides instructions for installing a telephone terminal cabinet and frames, including listing the necessary materials, tools, and steps of the process. It describes checking the vertical and horizontal alignment of the cabinet, locating power and ground terminations, and ensuring mounting screws are installed on the sides. Learners are given tasks to demonstrate their understanding, such as arranging the steps in order and discussing the purposes of installing a telephone terminal cabinet.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Electrical Installation and

Learning Area Grade Level G11


W2 Quarter
Maintenance
4th Date 5/14/2021
I. LESSON TITLE Layout and install telephone terminal cabinet and frames
II. MOST ESSENTIAL LEARNING Install telephone terminal cabinet according to the job requirements following PEC
COMPETENCIES (MELCs) and NEC
III. CONTENT/CORE CONTENT Telephone terminal cabinet and frames
IV. LEARNING PHASES AND LEARNING ACTIVITIES
I. . Introduction (Time Frame: 30 minutes
This lesson covers the knowledge of lay outing and installing telephone terminal cabinets and frame. It contains the information
of the provisions and specifications of installing telephone terminal cabinet.
Learning Task 1: Tick a Box
Direction: A. Which of the following materials are needed in installing telephone terminal cabinets and frames?
Put a check mark in the box.

Supplies and Materials:


telephone terminal cabinet
uPvc pipes
frames
Hammer
fitting
Flexible hose
adhesive solvent
Power cord
utility box
ac/outlet
junction box
fastening device
wrench
bolts and nuts
screw with tux

Direction: B. Which of the following tools are needed in installing telephone terminal cabinets and frames?
Put a check mark in the box.

Tools :
lineman’s pliers
Block Plane (Wooden)
long nose pliers
Bolster
diagonal cutting
Boning Rod
gimlet
Bump Cutter / Screed
level bar
Chisel
try square
Hoe
pull push tape rule
Scoop
claw hammer
Philip screw driver
flat screw driver
chalk line reel
Jack Hammer
plumb bob
Jack Plane
cross cut saw
Line and Pins
cold chisel
Masonry Trowel

D. Development (Time Frame: 1 hour)

Discussion of the lesson:

(Azares,Efren F. and Recana,Cirilo B. 2008.pp 3-10)

In the process of installation, the materials and tools are needed. these are the following:
Supplies and Materials: Tools:

● telephone terminal ● lineman’s pliers


cabinet ● long nose pliers
● frames ● diagonal cutting
● fitting ● gimlet
● adhesive solvent ● level bar
● utility box ● try square
● junction box ● pull push tape rule
● fastening device ● claw hammer
● bolts and nuts ● Philip screw driver
● screw with tux ● flat screw driver
● chalk line reel
● plumb bob
● cross cut saw
● cold chisel

Conditions
The following resources are needed:
1. Observe proper use of PPE.
2. The workplace must be free from obstruction.
3. The installed telephone terminal cabinet should conform to the drawing plan
details and standard.
Procedure
1. Prepare the area for the installation of telephone terminal cabinet and frames.
2. All the necessary tools, materials and equipment should be ready.
3. Follow the proper use of PPE for body, head, hand and foot protection.
4. Ensure that mounting screws are installed in the upper and lower flanges on the
right and left side of the cabinet.
5. Check the vertical and horizontal alignment of the cabinet using testing tool.
6. Locate the power and ground terminations at the top front side of the cabinet
backplane.
7. Observe housekeeping activities
Learning Task 2:
Direction: Process Questions
Answer the following questions briefly. Write your answer on a separate sheet of paper.
1.Give the importance of checking the vertical and horizontal alignment of the cabinet using testing tool.
2. Why is it necessary to observe the proper use of PPE in performing a job.
3. In choosing the materials, what are the different factors and characteristics need to consider.

E. Engagement (Time Frame: 30 minutes

Learning Task 3:
MDL: Direction:
Draw the process flow of installing telephone terminal cabinet. Using the process flow chart.
Rubrics for drawing the flow chart
Accuracy of the 10 Points
content
Visual Impact 10 Points
Neatness 10 Points
Accurate sequence 10 Points
Total 40 Points

ODL: Direction: Present a video on how to install telephone terminal cabinet. Follow the procedure stated on the lesson.

Rubrics for Video Assessment


Content 10 Points
Originality 10 Points
Videography clarity 10 Points
Videography Interest 10 Points
Total 40 Points

A. Assimilation (Time Frame: 30 minutes


⮚ Provision of Installing Telephone Terminal Cabinet. The Cabinet, according to Philippine Electrical Code must have
doors and are thus distinguished from large boxes with covers consisting of plates attached with screws and bolts.
⮚ It is important to install a telephone terminal cabinet because it is the demarcation point between the telco's
equipment and your home's inside wiring, which is your responsibility to maintain. The terminal cabinet also provides a
convenient place to install DSL filters, fiber to copper line converters, etc.

Learning Task 4:
Direction: Discuss the purposes/importance of installing telephone terminal cabinet and frame. Use the brainstorming web
graphic organizer.

V. ASSESSMENT (Time Frame: 30 minutes.


(Learning Activity Sheets for Enrichment, Remediation, or Assessment to be given on Weeks 3 and 6)
(Learning Activity Sheets for Enrichment, Remediation, or Assessment to be given on Weeks 3 and 6)
Learning Task 5:
Direction: In chronological order, arrange the following steps and the proper ways on how to install telephone terminal cabinet.
Write nos. 1-7 on the space provided before each statement.
_____ Locate the power and ground terminations at the top front side of the cabinet
_____ Check the vertical and horizontal alignment of the cabinet using testing tool.
_____ All the necessary tools, materials and equipment should be ready.
_____ Observe housekeeping activities
_____ Follow the proper use of PPE for body, head, hand and foot protection.
_____ Prepare the area for the installation of telephone terminal cabinet and frames.
_____ Ensure that mounting screws are installed in the upper and lower flanges on the
right and left side of the cabinet.

VI. REFLECTION (Time Frame: _________)


● Communicate your personal assessment as indicated in the Learner’s Assessment Card.
Personal Assessment on Learner’s Level of Performance
Using the symbols below, choose one which best describes your experience in working on each given task. Draw it in the column
for Level of Performance (LP). Be guided by the descriptions below:
 - I was able to do/perform the task without any difficulty. The task helped me in understanding the target content/ lesson.
- I was able to do/perform the task. It was quite challenging, but it still helped me in understanding the target content/lesson.
? – I was not able to do/perform the task. It was extremely difficult. I need additional enrichment activities to be able to do/perform this
task.
Learning Task LP Learning Task LP Learning Task LP Learning Task LP
Number 1 Number 3 Number 5
Number 2 Number 4

VII. REFERENCES 1. Philippine Electrical Code; Year 2000 Edition; Volume I by the Institute of Integrated Electrical
Engineers of the Philippines. First Printing June 2002.
2.Azares, Efren F. and Recana, Cirilo B. Practical Electricity III; Adriana Publishing: 1999.
3.Agpaoa, Feleciano. Interior and Exterior Wiring Troubleshooting; National Bookstore: 1991.
VIII.CITATION (Azares, Efren F. and Recana, Cirilo B. 2008.pp 3-10 )

Prepared by: Florentino P. Alangan Jr. Checked by: Edwina C. Nabo


SDO-Santa Rosa City Diosdado Villeta
Christian M. Niebres
Raissa P. Marquez