MillMaster —Technical
MillMaster
Optimised control of your grinding processes
Modular design
The control system MillMaster consists of two different components:
modular control structures
zzSmartControl
A powerful and flexible high-end control system of-
fering basic building blocks. This is the basis for the SmartControl base
system
MillMaster technology.
This combination allows a fast and flexible development with a sophisticated and target-oriented solution.
p.1
MillMaster—Technical specification
TM Ball Mill
The Technology Module Ball Mill has two different con-
trol loops: Controller
The controller changes the fresh feed depending on the-
Set points (fill level 1 & 2) se deviations based on the fresh feed working point.
For the fill level control there is a set point per cham- The new set point is calculated by a powerful multi-term
ber and the controller gets the deviations from these set controller. It is limited by a minimum and a maximum
points. fresh feed value and a total feed also.
50 50
0 0
0h 1h 2h 3h 4h 5h 6h 7h 8h 0h 1h 2h 3h 4h 5h 6h 7h 8h
Properties
p.2
MillMaster—Technical specification
Properties Properties
inputs (actual values) mill vibration inputs (actual values) fresh feed
mill differential pressure rejects
main drive power roller speed
main drive temperature pre-bin level
torque signal
roller pressure
p.3
MillMaster—Technical specification
Properties Properties
inputs (actual values) fineness (blain or residue) inputs (actual values) air temperature
separator speed material temperature
air flow (hot gas)
burner temperature (hot gas)
p.4
MillMaster—Technical specification
Properties Properties
• unlimited number of views • up to 10 curves per graph
• up to 3200 analogue values • unlimited number of graphs
• up to 3200 digital values • displays average
• value visualisation as bar graph or trend • displays standard deviation
• different views for operator & engineer • displays minimum and maximum
• continuously zooming
• historical data up to two years
p.5
MillMaster—Technical specification
zzsoftware
(all services installed)
d
zztechnology module
(due to your needs)
zzsoftware license s
MillMaster
(authorized via USB dongle)
Easy installation
The installation is easily done with just a few steps to switch to MillMaster:
1) Preparation
zzconnect server to the local network
zzconnect server to VPN
zzestablish OPC connection
2) Startup period
zzVPN
zzOPC items
zzswitching logic
3) Optimisation
zzparametrisation for different types
After MillMaster is installed you still can switch back to We recommend our customers to set up a VPN tunnel
your old control strategy for tests or to evaluate new for MillMaster. This enables us to make the major part of
products. In order to ensure this functionality a ‘Switch- the commissioning from our position, which saves trav-
ing Logic‘ is added, which switches between the MillMas- eling costs and time. Also it allows us to help you fast
ter controller and the old one on PLC side. and uncomplicated in case of upcoming questions and
extensions.
p.6