A
REPORT
ON CONDITION SURVEY
JAL KIRAN CO-OP. HSG. SOCIETY, SECTOR-18
AT NERUL (W)
For the partial fulfilment of term work for Building Services and Repairs
course in Third Year Engineering of Mumbai University.
BY
CHIRAG PATIL A27
AKANKSH GHANEKAR A37
HARISH NUTRAGANTI A38
SIDDESH NAIK A39
OM PAWAR A42
1
DEPARTMENT OF CIVIL ENGINEERING
TERNA ENGINEERING COLLEGE, NAVI MUMBAI
TERNA PUBLIC CHARITABE TRUST’s
TERNA ENGINEERING COLLEGE
Nerul, Navi Mumbai – 400706
CERTIFICATE
Certified that _________________SIDDESH NAIK ________________
Exam Seat No. _________________ Course: CIVIL ENGINEERING
ID No. ___TU7F1920026_______ of _________THIRD_______ Year
has completed the required number of Practical / Tutorials / Assignments
in the subject BUILDING SERVICES AND REPAIR Semester: 5th
in the department of: CIVIL ENGINEERING during the academic
year: 2021-22.
________________ ____________
Subject In charge Head of the dept.
____________________
PRINCIPAL
2
CONTENTS page no
1.INTRODUCTION 4
2. CONDITION SURVEY 5
2.1 Peeling of paint 5
2.2 Exposure of reinforcement bars 7
2.3 Dampness 8
2.4 Water leakage 10
2.5 Uprooting of tiles 10
2.6 Cracks 11
2.7 Growth of Algae 13
3. Recommendations 14
3
1.INTRODUCTION
A Condition survey has been done for Building Services and Repairs
project on 23rd September 2021. Building Jal Kiran CHS, sector-18,
Nerul, Navi Mumbai.
1.1 SITE LOCATION: Jal Kiran co-op. Society, sector-18, Nerul
(W), Navi Mumbai – 400706.
1.2 BREIF HISTORY: Jal Kiran co-op. Society, building
construction was started in the year 1987 and was ready by 1994.
Building has total 96 flats that is four flats on each floor. The society
has 6 buildings.
1.3 STRUCTURE:
1. Name of the structure Jal Kiran co-op. society, sector-
18, Nerul (W), Navi Mumbai.
2. Structure Ground+3 floor
3. Year of construction 1987
4. Total no. of buildings 6
5. No. of flats per building 16
6. Mode of construction of the
structure
Foundation R.C.C
Floor R.C.C
Columns R.C.C
Walls Brick work + RC block
Roof R.C.C
Beams R.C.C
4
2. CONDITION SURVEY
2.1 PEELING OF PAINT
Fig.no. 2.1.1 Peeling of paint at watchman’s cabin
Fig.no.2.1.2 Peeling of paint at C-15/ 102
5
Fig.no.2.1.3 Peeling of paint at C-16/ 203
6
2.2 EXPOSURE OF REINFORCEMENT BARS.
Fig.no.2.2.1 Exposure of reinforcement bars at C-07/101
Fig.no.2.2.2 Exposure of reinforcement bars at C-16/201
7
Fig.no.2.2.3 Exposure of reinforcement bars at C-06 below the water
tank.
2.3 DAMPNESS
Fig.no.2.3.1 Dampness has been observed on the wall of C-14/103.
8
Fig.no.2.3.2 Dampness on ceiling in toilet at C-05/203.
Fig.no.2.3.3 Dampness on the ceiling of passage in C-05.
9
2.4 WATER LEAKAGE
Fig.no.2.4.1 Water leakage has been observed at drainage pipe in
C-06
2.5 UPROOTING OF TILES
Fig.no.2.5.1 Improper levelling of tiles by the growth of roots
10
2.6 CRACKS
Fig.no.2.6.1 Crack has been developed in column of C-16.
Fig.no.2.6.2 Crack has been observed at boundary wall of society.
11
Fig.no.2.6.3 Crack has been
developed at joint of beam and
wall.
Fig.no.2.6.4 Crack has been occurred
in C-05/301.
12
2.7 GROWTH OF ALGAE
→ Fig.no.2.7.1 Growth of alage
has been observed on boundry wall
of society.
Fig.no.2.7.2 Algae growth on walls
of Pump room.
13
3. RECOMMENDATIONS
The building was constructed in 1987. The building has completed 30
years so detailed structural assessment should be carried out to ensure
the safety of the residents. There are many repairs works that we have
mentioned in this report, each defects needs to be repaired and painted
in well manner This survey was carried out only by visual
observations for educational purpose.
14