1) 8% Professional Fee of The Probable Construction Cost (Design Only)

The document outlines three fee structures for architectural services: 8% for design only including signed and sealed contract documents and drawings as well as 6-8 site visits; 6.5% for full design and construction services including weekly supervision; and 5% for simplified design and construction services with less detailed black and white drawings and structural computations but not full design.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views

1) 8% Professional Fee of The Probable Construction Cost (Design Only)

The document outlines three fee structures for architectural services: 8% for design only including signed and sealed contract documents and drawings as well as 6-8 site visits; 6.5% for full design and construction services including weekly supervision; and 5% for simplified design and construction services with less detailed black and white drawings and structural computations but not full design.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

1) 8% PROFESSIONAL FEE OF THE PROBABLE CONSTRUCTION COST (DESIGN ONLY)

- CONTRACT DOCUMENTS AND DRAWINGS


- CONTRACT DOCUMENTS
-BILL OF MATERIALS (SIGNED AND SEALED)
-SPECIFICATIONS (SIGNED AND SEALED)
- DRAWINGS/PLANS
-ARCHITECTURAL PLANS
-COLORED PERSPECTIVES OF MAJOR AREAS SUCH AS EXTERIOR, INTERIORS OF
LIVING, DINING, KITCHEN,BEDROOMS, DINING AND OTHER IMPORTANT AREAS.
-STRUCTURAL
-ELECTRICAL
-SANITARY
- SITE SUPERVISION
- 6-8 TIMES SITE VISIT TO CHECK IF THE DESIGN IS BEING IMPLEMENTED
(CRITICAL STAGES)

2) 6.5% PROFESSIONAL FEE OF THE PROBABLE CONSTRUCTION COST (DESIGN AND


CONSTRUCTION)

- CONTRACT DOCUMENTS AND DRAWINGS


- CONTRACT DOCUMENTS
-BILL OF MATERIALS (SIGNED AND SEALED)
-SPECIFICATIONS (SIGNED AND SEALED)
- DRAWINGS/PLANS
-ARCHITECTURAL PLANS
-COLORED PERSPECTIVES OF MAJOR AREAS SUCH AS EXTERIOR, INTERIORS OF
LIVING, DINING, KITCHEN,BEDROOMS, DINING AND OTHER IMPORTANT AREAS.
-STRUCTURAL
-ELECTRICAL
-SANITARY
- SITE SUPERVISION
- SUPERVISE THE WHOLE CONSTRUCTION PERIOD (1-2 TIMES A WEEK)
3) 5% PROFESSIONAL FEE OF THE PROBABLE CONSTRUCTION COST (DESIGN AND
CONSTRUCTION)

- CONTRACT DOCUMENTS AND DRAWINGS


- CONTRACT DOCUMENTS
-BILL OF MATERIALS (SIGNED AND SEALED)
-SPECIFICATIONS (SIGNED AND SEALED)
- DRAWINGS/PLANS
-ARCHITECTURAL PLANS (FOR BUILDING PREMIT ONLY)
- LESS DETAILED DRAWINGS
- BLACK AND WHITE
-STRUCTURAL
-STRUCTURAL COMPUTAION
-ELECTRICAL
-ELECTRICAL LOAD ANALYSIS
-SANITARY