Fiqor Yona Mujabi - 177002066 - A - TUGAS 2

This document is a 3-page load flow analysis report for an electrical power system project conducted by Fiqor Yona Mujabi (177002066) to fulfill an assignment requirement for the Power Systems Analysis Laboratory course. The report provides information on the project such as the number of buses and branches in the system, the solution method and settings used, adjustments made to component parameters, and the input bus data.

Uploaded by

Farhan Arista
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views27 pages

Fiqor Yona Mujabi - 177002066 - A - TUGAS 2

This document is a 3-page load flow analysis report for an electrical power system project conducted by Fiqor Yona Mujabi (177002066) to fulfill an assignment requirement for the Power Systems Analysis Laboratory course. The report provides information on the project such as the number of buses and branches in the system, the solution method and settings used, adjustments made to component parameters, and the input bus data.

Uploaded by

Farhan Arista
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

TUGAS 2

Disusun Untuk Memenuhi Salah Satu Tugas


Mata Kuliah Praktikum Analisis System Tenaga

Oleh,
Fiqor Yona Mujabi
177002066
Kelas A

JURUSAN TEKNIK ELEKTRO


FAKULTAS TEKNIK
UNIVERSITAS SILIWANGI
2021
ETAP
Project: Page: 2
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF
ETAP
Project: Page: 3
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF
ETAP
Project: Page: 4
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

Filename: 177002066 Config.:


Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None


ETAP
Project: Page: 5
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Number of Buses: Precision of Solution: Gauss-Seidel Method

Load Flow Acceleration Factor: 2000

System Frequency: 0.0000010

Number of Branches: Unit System: 1.45

Project Filename: 60.00 Hz

Output Filename: English

Swing V-Control Load Total 177002066


2 0 8 10
C:\ETAP
1260\177002066\
177002066.lfr
Impedance Tie PD Total
XFMR2 XFMR3 Reactor Line/Cable 1 2 11
Method of Solution:
5 0 0 3
Maximum No. of Iteration:

Engineer: Revision: Base


Study Case: LF
Filename: 177002066 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Yes
Transformer Impedance: Individual

Yes
Reactor Impedance: Individual

No
Overload Heater Resistance:
No
Transmission Line Length:
No
Cable Length:

Apply Individual
Temperature Correction Adjustments /Global Degree C

Yes
Transmission Line Resistance: Individual
ETAP
Project: Page: 6
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Yes
Cable Resistance: Individual
ETAP
Project: Page: 7
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Filename: 177002066 Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 34.500 1 100.0 0.0

Bus2 13.800 1 100.0 0.0 0.000 -1.000 Bus3 4.160 1 100.0 0.0 2.935 1.187

Bus4 4.160 1 100.0 0.0 3.000 0.000

Bus5 13.800 1 100.0 0.0

Bus6 13.800 1 100.0 0.0 3.400 2.107 0.850 0.527

Bus7 4.160 1 100.0 0.0 0.642 0.268

Bus8 0.480 1 100.0 0.0 0.266 0.115 40.000 0.000

Bus9 4.160 1 100.0 0.0

Bus10 0.480 1 100.0 0.0 0.267 0.142 0.134 0.021

Total Number of Buses: 10 7.511 3.819 43.984 -0.452 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 34.500 Swing 1 100.0 0.0


Bus5 13.800 Swing 1 100.0 0.0
ETAP
Project: Page: 8
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

0.000 0.000

Engineer: Revision: Base


Study Case: LF
Filename: 177002066 Config.: Normal

Line/Cable Input Data

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable1 5,0NCUS3 500 300.0 0.0 1 75 0.029100 0.029870


Cable2 15NCUN3 250 400.0 0.0 1 75 0.054799 0.036728

Cable3 5,0NCUS3 500 100.0 0.0 1 75 0.029100 0.031699


Line / Cable resistances are listed at the specified temperatures.
ETAP
Project: Page: 9
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Filename: 177002066 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 30.000 34.500 13.800 7.00 23.70 0 0 0 0 0 7.0000 Dyn 0.000

T2 3-Phase 15.000 13.800 4.160 6.50 18.60 0 0 0 0 0 6.5000 Dyn 0.000

T3 3-Phase 5.000 13.800 4.160 6.50 12.14 0 0 0 0 0 6.5000 Dyn 0.000

T4 3-Phase 3.000 4.160 0.480 5.75 10.67 0 0 0 0 0 5.7500 Dyn 0.000 T5 3-

Phase 5.000 4.160 0.480 6.75 12.14 0 0 0 0 0 6.7500 Dyn 0.000

Impedance Input Data

Impedance Positive Sequence Impedanc

ID R X Y Unit

Z1 0.0000000 0.0100000 0.0000000 % in 13.800 kV base and 100.0 MVA base


ETAP
Project: Page: 10
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Study Case: LF
Filename: 177002066 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base

ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 0.98 23.31 23.33

T2 2W XFMR Bus2 Bus3 2.33 43.27 43.33

T3 2W XFMR Bus5 Bus7 10.67 129.56 130.00

T4 2W XFMR Bus7 Bus8 17.88 190.83 191.67

T5 2W XFMR Bus9 Bus10 11.08 134.54 135.00

Cable1 Cable Bus3 Bus4 5.04 5.18 7.23

Cable2 Cable Bus2 Bus5 1.15 0.77 1.39

Cable3 Cable Bus4 Bus9 1.68 1.83 2.49

Z1 Impedance Bus5 Bus6 0.01 0.01

CB4 Tie Breakr Bus4 Bus7

CB5 Tie Breakr Bus10 Bus8


ETAP
Project: Page: 11
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Filename: 177002066 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 34.500 100.000 0.0 0.498 1.638 0 0 Bus2 0.498 1.638 28.7 29.1
Bus2 13.800 99.613 -0.1 0 0 0.000 -0.992 Bus5 -27.116 -9.477 1206.4 94.4

Bus1 -0.498 -1.631 71.6 29.2

Bus3 27.614 12.101 1266.2 91.6

Bus3 4.160 94.441 -7.2 0 0 2.934 1.186 Bus4 24.466 6.952 3737.8 96.2

Bus2 -27.401 -8.138 4200.5 95.9

Bus4 4.160 92.758 -7.8 0 0 2.581 0.000 Bus3 -24.100 -6.576 3737.8 96.5

Bus9 18.008 5.841 2832.5 95.1

Bus7 3.511 0.735 536.8 97.9

* Bus5 13.800 100.000 0.0 41.600 17.589 0 0 Bus2 27.211 9.542 1206.4 94.4

Bus6 4.250 2.634 209.2 85.0

Bus7 10.139 5.414 480.9 88.2

Bus6 13.800 100.000 0.0 0 0 4.250 2.634 Bus5 -4.250 -2.634 209.2 85.0

Bus7 4.160 92.758 -7.8 0 0 0.642 0.268 Bus5 -9.998 -3.702 1595.2 93.8

Bus8 12.869 4.172 2024.1 95.1

Bus4 -3.511 -0.735 536.8 97.9

Bus8 0.480 85.633 -25.2 0 0 29.598 0.115 Bus7 -12.488 -0.113 17542.3 100.0

Bus10 -17.110 -0.002 24032.5 100.0

Bus9 4.160 92.316 -7.9 0 0 0.001 0.001 Bus4 -17.938 -5.764 2832.5 95.2

Bus10 17.937 5.763 2832.4 95.2


ETAP
Project: Page: 12
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Bus10 0.480 85.633 -25.2 0 0 0.366 0.157 Bus9 -17.475 -0.160 24547.1 100.0

Bus8 17.110 0.002 24032.5 100.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Study Case: LF
Filename: 177002066 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 34.500 0 0 0 0 0 0 0 0 1.712 29.1 28.7

Bus2 13.800 0 0 0 -0.992 0 0 0 0 30.149 91.6 1266.2

Bus3 4.160 2.934 1.186 0 0 0 0 0 0 28.583 95.9 4200.5

Bus4 4.160 0 0 2.581 0 0 0 0 0 24.981 96.5 3737.8

Bus5 13.800 0 0 0 0 0 0 0 0 45.166 92.1 1889.6

Bus6 13.800 3.400 2.107 0.850 0.527 0 0 0 0 5.000 85.0 209.2

Bus7 4.160 0.642 0.268 0 0 0 0 0 0 14.222 95.0 2127.9

Bus8 0.480 0.266 0.115 29.332 0 0 0 0 0 29.598 100.0 41574.4

Bus9 4.160 0.001 0.001 0 0 0 0 0 0 18.841 95.2 2832.5

Bus10 0.480 0.267 0.142 0.098 0.015 0 0 0 0 17.476 100.0 24547.1

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 13
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

Study Case: LF
Filename: 177002066 Config.:
Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp ) Amp % (MVA) MVA % MVA %

* Cable1 Cable 383.83 3737.78 973.80

* Cable2 Cable 277.00 1206.40 435.52

* Cable3 Cable 389.49 2832.54 727.24

T1 Transformer 30.000 1.712 5.7 1.706 5.7

* T2 Transformer 15.000 30.149 201.0 28.583 190.6

* T3 Transformer 5.000 11.494 229.9 10.661 213.2

* T4 Transformer 3.000 13.528 450.9 12.489 416.3

* T5 Transformer 5.000 18.840 376.8 17.476 349.5

* Indicates a branch with operating load exceeding the branch capability.


Study Case: LF
Filename: 177002066 Config.:
Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
%
Drop

ID MW Mvar MW Mvar kW kvar From To


in Vmag
T1 0.498 1.638 -0.498 -1.631 0.3 6.8 100.0 99.6 0.39

Cable2 -27.116 -9.477 27.211 9.542 95.7 64.1 99.6 100.0 0.39

T2 27.614 12.101 -27.401 -8.138 213.1 3963.8 99.6 94.4 5.17

Cable1 24.466 6.952 -24.100 -6.576 365.9 375.6 94.4 92.8 1.68

Cable3 18.008 5.841 -17.938 -5.764 70.0 76.3 92.8 92.3 0.44

Z1 4.250 2.634 -4.250 -2.634 0.0 100.0 100.0 0.00

T3 10.139 5.414 -9.998 -3.702 141.0 1711.6 100.0 92.8 7.24

T4 12.869 4.172 -12.488 -0.113 380.4 4059.0 92.8 85.6 7.13

T5 17.937 5.763 -17.475 -0.160 461.6 5603.6 92.3 85.6 6.68

1728.0 15860.9
ETAP
Project: Page: 14
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

Study Case: LF
Filename: 177002066 Config.:
Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase


Type

Bus10 Bus Under Voltage 0,48 kV 0,41 85.6 3-Phase

Bus3 Bus Under Voltage 4,16 kV 3,93 94.4 3-Phase

Bus4 Bus Under Voltage 4,16 kV 3,86 92.8 3-Phase

Bus7 Bus Under Voltage 4,16 kV 3,86 92.8 3-Phase

Bus8 Bus Under Voltage 0,48 kV 0,41 85.6 3-Phase

Bus9 Bus Under Voltage 4,16 kV 3,84 92.3 3-Phase

Cable1 Cable Overload 383,83 Amp 3.737,78 973.8 3-Phase

Cable2 Cable Overload 277,00 Amp 1.206,40 435.5 3-Phase

Cable3 Cable Overload 389,49 Amp 2.832,54 727.2 3-Phase

Gen1 Generator Overload 10,00 MW 41,60 416.0 3-Phase

T2 Transformer Overload 15,00 MVA 28,58 190.6 3-Phase

T3 Transformer Overload 5,00 MVA 10,66 213.2 3-Phase

T4 Transformer Overload 3,00 MVA 12,49 416.3 3-Phase


ETAP
Project: Page: 15
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

T5 Transformer Overload 5,00 MVA 17,48 349.5 3-Phase

Study Case: LF
Filename: 177002066 Config.:
Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 42.099 19.228 46.282 90.96 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 42.099 19.228 46.282 90.96 Lagging

Total Motor Load: 7.511 3.819 8.426 89.14 Lagging

Total Static Load: 32.861 -0.450 32.864


99.99 Leading
Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 1.726 15.859

System Mismatch: 0.002 0.002


Number of Iterations: 74
ETAP
Project: Page: 16
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

Filename: 177002066 Config.:


Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None


ETAP
Project: Page: 17
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Number of Buses: Precision of Solution: Gauss-Seidel Method

Load Flow Acceleration Factor: 2000

System Frequency: 0.0000010

Number of Branches: Unit System: 1.45

Project Filename: 60.00 Hz

Output Filename: English

Swing V-Control Load Total 177002066


2 0 8 10
C:\ETAP
1260\177002066\
177002066.lfr
Impedance Tie PD Total
XFMR2 XFMR3 Reactor Line/Cable 1 2 11
Method of Solution:
5 0 0 3
Maximum No. of Iteration:

Engineer: Revision: Base


Study Case: LF
Filename: 177002066 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Yes
Transformer Impedance: Individual

Yes
Reactor Impedance: Individual

No
Overload Heater Resistance:
No
Transmission Line Length:
No
Cable Length:

Apply Individual
Temperature Correction Adjustments /Global Degree C

Yes
Transmission Line Resistance: Individual
ETAP
Project: Page: 18
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Yes
Cable Resistance: Individual
ETAP
Project: Page: 19
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Filename: 177002066 Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 34.500 1 100.0 0.0

Bus2 13.800 1 100.0 0.0 0.000 -1.000 Bus3 4.160 1 100.0 0.0 2.935 1.187

Bus4 4.160 1 100.0 0.0 3.000 0.000

Bus5 13.800 1 100.0 0.0

Bus6 13.800 1 100.0 0.0 3.400 2.107 0.850 0.527

Bus7 4.160 1 100.0 0.0 0.642 0.268

Bus8 0.480 1 100.0 0.0 0.266 0.115 40.000 0.000

Bus9 4.160 1 100.0 0.0

Bus10 0.480 1 100.0 0.0 0.267 0.142 0.134 0.021

Total Number of Buses: 10 7.511 3.819 43.984 -0.452 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 34.500 Swing 1 100.0 0.0


Bus5 13.800 Swing 1 100.0 0.0
ETAP
Project: Page: 20
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

0.000 0.000

Engineer: Revision: Base


Study Case: LF
Filename: 177002066 Config.: Normal

Line/Cable Input Data

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable1 5,0NCUS3 500 300.0 0.0 1 75 0.029100 0.029870


Cable2 15NCUN3 250 400.0 0.0 1 75 0.054799 0.036728

Cable3 5,0NCUS3 500 100.0 0.0 1 75 0.029100 0.031699


Line / Cable resistances are listed at the specified temperatures.
ETAP
Project: Page: 21
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Filename: 177002066 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 30.000 34.500 13.800 7.00 23.70 0 0 0 0 0 7.0000 Dyn 0.000

T2 3-Phase 15.000 13.800 4.160 6.50 18.60 0 0 0 0 0 6.5000 Dyn 0.000

T3 3-Phase 5.000 13.800 4.160 6.50 12.14 0 0 0 0 0 6.5000 Dyn 0.000

T4 3-Phase 3.000 4.160 0.480 5.75 10.67 0 0 0 0 0 5.7500 Dyn 0.000 T5 3-

Phase 5.000 4.160 0.480 6.75 12.14 0 0 0 0 0 6.7500 Dyn 0.000

Impedance Input Data

Impedance Positive Sequence Impedanc

ID R X Y Unit

Z1 0.0000000 0.0100000 0.0000000 % in 13.800 kV base and 100.0 MVA base


ETAP
Project: Page: 22
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Study Case: LF
Filename: 177002066 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base

ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 0.98 23.31 23.33

T2 2W XFMR Bus2 Bus3 2.33 43.27 43.33

T3 2W XFMR Bus5 Bus7 10.67 129.56 130.00

T4 2W XFMR Bus7 Bus8 17.88 190.83 191.67

T5 2W XFMR Bus9 Bus10 11.08 134.54 135.00

Cable1 Cable Bus3 Bus4 5.04 5.18 7.23

Cable2 Cable Bus2 Bus5 1.15 0.77 1.39

Cable3 Cable Bus4 Bus9 1.68 1.83 2.49

Z1 Impedance Bus5 Bus6 0.01 0.01

CB4 Tie Breakr Bus4 Bus7

CB5 Tie Breakr Bus10 Bus8


ETAP
Project: Page: 23
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Filename: 177002066 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 34.500 100.000 0.0 0.498 1.638 0 0 Bus2 0.498 1.638 28.7 29.1
Bus2 13.800 99.613 -0.1 0 0 0.000 -0.992 Bus5 -27.116 -9.477 1206.4 94.4

Bus1 -0.498 -1.631 71.6 29.2

Bus3 27.614 12.101 1266.2 91.6

Bus3 4.160 94.441 -7.2 0 0 2.934 1.186 Bus4 24.466 6.952 3737.8 96.2

Bus2 -27.401 -8.138 4200.5 95.9

Bus4 4.160 92.758 -7.8 0 0 2.581 0.000 Bus3 -24.100 -6.576 3737.8 96.5

Bus9 18.008 5.841 2832.5 95.1

Bus7 3.511 0.735 536.8 97.9

* Bus5 13.800 100.000 0.0 41.600 17.589 0 0 Bus2 27.211 9.542 1206.4 94.4

Bus6 4.250 2.634 209.2 85.0

Bus7 10.139 5.414 480.9 88.2

Bus6 13.800 100.000 0.0 0 0 4.250 2.634 Bus5 -4.250 -2.634 209.2 85.0

Bus7 4.160 92.758 -7.8 0 0 0.642 0.268 Bus5 -9.998 -3.702 1595.2 93.8

Bus8 12.869 4.172 2024.1 95.1

Bus4 -3.511 -0.735 536.8 97.9

Bus8 0.480 85.633 -25.2 0 0 29.598 0.115 Bus7 -12.488 -0.113 17542.3 100.0

Bus10 -17.110 -0.002 24032.5 100.0

Bus9 4.160 92.316 -7.9 0 0 0.001 0.001 Bus4 -17.938 -5.764 2832.5 95.2

Bus10 17.937 5.763 2832.4 95.2


ETAP
Project: Page: 24
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision: Base


Study Case: LF

Bus10 0.480 85.633 -25.2 0 0 0.366 0.157 Bus9 -17.475 -0.160 24547.1 100.0

Bus8 17.110 0.002 24032.5 100.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Study Case: LF
Filename: 177002066 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 34.500 0 0 0 0 0 0 0 0 1.712 29.1 28.7

Bus2 13.800 0 0 0 -0.992 0 0 0 0 30.149 91.6 1266.2

Bus3 4.160 2.934 1.186 0 0 0 0 0 0 28.583 95.9 4200.5

Bus4 4.160 0 0 2.581 0 0 0 0 0 24.981 96.5 3737.8

Bus5 13.800 0 0 0 0 0 0 0 0 45.166 92.1 1889.6

Bus6 13.800 3.400 2.107 0.850 0.527 0 0 0 0 5.000 85.0 209.2

Bus7 4.160 0.642 0.268 0 0 0 0 0 0 14.222 95.0 2127.9

Bus8 0.480 0.266 0.115 29.332 0 0 0 0 0 29.598 100.0 41574.4

Bus9 4.160 0.001 0.001 0 0 0 0 0 0 18.841 95.2 2832.5

Bus10 0.480 0.267 0.142 0.098 0.015 0 0 0 0 17.476 100.0 24547.1

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 25
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

Study Case: LF
Filename: 177002066 Config.:
Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp ) Amp % (MVA) MVA % MVA %

* Cable1 Cable 383.83 3737.78 973.80

* Cable2 Cable 277.00 1206.40 435.52

* Cable3 Cable 389.49 2832.54 727.24

T1 Transformer 30.000 1.712 5.7 1.706 5.7

* T2 Transformer 15.000 30.149 201.0 28.583 190.6

* T3 Transformer 5.000 11.494 229.9 10.661 213.2

* T4 Transformer 3.000 13.528 450.9 12.489 416.3

* T5 Transformer 5.000 18.840 376.8 17.476 349.5

* Indicates a branch with operating load exceeding the branch capability.


Study Case: LF
Filename: 177002066 Config.:
Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
%
Drop

ID MW Mvar MW Mvar kW kvar From To


in Vmag
T1 0.498 1.638 -0.498 -1.631 0.3 6.8 100.0 99.6 0.39

Cable2 -27.116 -9.477 27.211 9.542 95.7 64.1 99.6 100.0 0.39

T2 27.614 12.101 -27.401 -8.138 213.1 3963.8 99.6 94.4 5.17

Cable1 24.466 6.952 -24.100 -6.576 365.9 375.6 94.4 92.8 1.68

Cable3 18.008 5.841 -17.938 -5.764 70.0 76.3 92.8 92.3 0.44

Z1 4.250 2.634 -4.250 -2.634 0.0 100.0 100.0 0.00

T3 10.139 5.414 -9.998 -3.702 141.0 1711.6 100.0 92.8 7.24

T4 12.869 4.172 -12.488 -0.113 380.4 4059.0 92.8 85.6 7.13

T5 17.937 5.763 -17.475 -0.160 461.6 5603.6 92.3 85.6 6.68

1728.0 15860.9
ETAP
Project: Page: 26
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

Study Case: LF
Filename: 177002066 Config.:
Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase


Type

Bus10 Bus Under Voltage 0,48 kV 0,41 85.6 3-Phase

Bus3 Bus Under Voltage 4,16 kV 3,93 94.4 3-Phase

Bus4 Bus Under Voltage 4,16 kV 3,86 92.8 3-Phase

Bus7 Bus Under Voltage 4,16 kV 3,86 92.8 3-Phase

Bus8 Bus Under Voltage 0,48 kV 0,41 85.6 3-Phase

Bus9 Bus Under Voltage 4,16 kV 3,84 92.3 3-Phase

Cable1 Cable Overload 383,83 Amp 3.737,78 973.8 3-Phase

Cable2 Cable Overload 277,00 Amp 1.206,40 435.5 3-Phase

Cable3 Cable Overload 389,49 Amp 2.832,54 727.2 3-Phase

Gen1 Generator Overload 10,00 MW 41,60 416.0 3-Phase

T2 Transformer Overload 15,00 MVA 28,58 190.6 3-Phase

T3 Transformer Overload 5,00 MVA 10,66 213.2 3-Phase

T4 Transformer Overload 3,00 MVA 12,49 416.3 3-Phase


ETAP
Project: Page: 27
27.6.0H
Location: Date: 04-14-2021 Contract: SN:

Engineer: Revision:
Base
Study Case: LF

T5 Transformer Overload 5,00 MVA 17,48 349.5 3-Phase

Study Case: LF
Filename: 177002066 Config.:
Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 42.099 19.228 46.282 90.96 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 42.099 19.228 46.282 90.96 Lagging

Total Motor Load: 7.511 3.819 8.426 89.14 Lagging

Total Static Load: 32.861 -0.450 32.864


99.99 Leading
Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 1.726 15.859

System Mismatch: 0.002 0.002


Number of Iterations: 74