AST Logistics Services (NS0223990-D) : Ref: Director of Utm Otec Engineering Department
AST Logistics Services (NS0223990-D) : Ref: Director of Utm Otec Engineering Department
D)
Lot CM 04, Mezzanine Floor, POS Aviation Cafeteria Building,
POS Aviation Cargo Complex,
FCZ KLIA 64000 Sepang, Malaysia
email : [email protected] / [email protected]
Telephone : 03-87789196 (Office)
Dear Sir/Madam,
We are pleased to furnish our rates as per subject. Kindly find below quotation
for your perusal.
Page 1 of 2
d) Container cleaning :RM 35.00/20’ per container
e) Container Maintenance :RM 25.00/20’ per container
1. ***Shipping Charges will be billed at cost. Unless charges are paid upfront by
Consignee directly to Shipping liner, otherwise additional 10% of the said value
will be charged as our handling charge in our billing to you.
2. ***All storage charges to be paid upfront prior to container being trucked out
from port. (for any storage / demurrage /detention incurs).
3. All container deposit to be furnished by Consignee as per shipping line
gazettes. Refundable upon no damages when MT cntrs is returned to Depot.
4. Demurrage / detention: RM 100.00/20’ per container per day (1-3 days)
RM 150.00/20’ per container per day (4-7 days
RM 200.00/20’ per container per day (7 days onwards)
Quotation Validity: end March 2021
Subject to change without prior notice in accordance to the AHM implementation
a) Price – RM 800.00 per day / 3 tons forklft with driver / 8hours work / 1hour
break / over time RM 100.00 / per hour.
b) Price – RM 1,750.00 per day / 10 tons forklift with driver / ----Same as the
above --- / over time RM200.00 / per hour.
c) Price – RM 4000.00 / delivery 3 & 10 ton forklift , 10 ton crane together from
our yard to Port Dickson to & fro to site.
d) Price – RM1500.00 per day / 10 tons city crane / 8hours work / 1hour break /
over time RM200.00 / per hour
e) Price – RM 350.00 per manpower skill worker / 8hours work / 1hour break / over
time RM 70.00 / per hour.
Note: Kindly ensure that working site are to be in good road conditions able for
forklift movement. Your co-operation is much appreciated.
Yours faithfully,
………………………………
We hereby acknowledge & fully understand
terms & condition & accept the charges,