80% Guaranteed!!: Range Standard Deviation

This document contains questions and answers related to quality management processes and tools. It covers topics like the PDCA cycle, Six Sigma, Lean, process capability, quality assurance, and statistical process control. Many of the questions are marked with asterisks, indicating the responder was unsure of some answers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
6K views

80% Guaranteed!!: Range Standard Deviation

This document contains questions and answers related to quality management processes and tools. It covers topics like the PDCA cycle, Six Sigma, Lean, process capability, quality assurance, and statistical process control. Many of the questions are marked with asterisks, indicating the responder was unsure of some answers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

80% guaranteed!!

Note: Marked questions with (*) about which I wasn’t entirely sure of.

PDCA cycle is also known as Deming cycle.


TRUE
PDCA is based on the following principles:
Quality Assurance and Quality Control
(*)Which of the Goal statement is adhering to SMART rule?
Reduce Cycle Time from 8hrs to 4hrs by Dec 2016
If the number of defects change from 30000 to 3000:
Process Capability improves
Yield is:
Percentage of defect free product
The methodology for making improvements to an already existing process is a ______ and for
developing a new product/process is a _____.
1 – DMAIC, 2 – DMADV
Which one of these is not a role in Six Signa team?
None of the above
(*)Unnecessary movement of people, parts or machines within a process falls under which type
of waste?
Transport
(*)Which of the following statements is correct for this goal statement / “Imptove SLA
compliance from 90% to 95% bz June 2016”
Baseline Performance is 90% and Target Performance is 95%
(*)Which of the following statistical terms represents the variation in a process?
RANGE
STANDARD DEVIATION
A stable process has to be a capable process
FALSE
Select the CORRECT statement
Processing to a standard that exceeds the requirement of the customer fall under “Over
Production” waste type
In DMAIC the main objective of Analyze phase is to:
Identify root causes
(*)A stable process has:
All data points within control limits
Focus of Lean is:
Waste Elimination
(*)The PDCA cycle is a powerful approach for problem solving as it provides the foundation for
teams to:
Systematically identify and understand a problem or issue and its root cause rather than the
symptoms
Generate ideas and develop an effective plan to solve a problem
Ensure that the current problem stays fixed and then move on to the other problems
(*)Sigma approach aims to:
Reduce variation
Improve capability
Increase Yield
What are the fundamental elements of Lean
Value
Value Stream
Flow
Pull
Perfection
(*)Which of the following statements is NOT TRUE?
Standard Operating Procedure (SOP) is a matrix that documents the risks in a newly designed
solution
Eighth type of waste is:
Unutilized Skills
In which phase of PDCA, you can confirm whether the solution has met the desired goal.
Check
(*)Which of the following is not an element of the Charter?
Solution
(*)For Six Sigma Quality, one can fit:
3 Sigmas between UCL and LCL
(*)Scatter Plot helps in:
Depicting the relationship between input (x) and output (y)
Structured Problem Solving can help