Installation Qualification - Acme
Installation Qualification - Acme
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 1 of 28
INSTALLATION QUALIFICATION
PROTOCOL
COMPRESSED AIR SYSTEM
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 2 of 28
Index
1 PROTOCOL APPROVAL 3
2 OVERVIEW 4
3. RESPONSIBILITY 5
5. SYSTEM DESCRIPTION 8
6. ACCEPTANCE CRITERIA 11
8. REQUALIFICATION 31
9 FINAL REPORT 32
11. APPENDIX 34
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 3 of 28
Signing of this Approval page of Installation Qualification Protocol indicates agreement with
the Installation Qualification approach described in this document. Should Modifications to
the Installation Qualification become necessary, an addendum will be prepared and approved.
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 4 of 28
2.0 Overview
2.1 Objective
The objective of this Protocol is to provide a written guideline for carrying out the
Installation Qualification (IQ) of Compressed Air Generation System.
2.2 Scope
This protocol is applicable to Installation Qualification of Compressed Air generation
System (PNB-920654) supplied by M/s CHICAGO PNEUMATIC COMPRESSORS
against the Purchase Order and installed in the Utility block at the ground floor.
2.3 Statement of Purpose
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 5 of 28
3.0 Responsibility:
The validation group comprising of representatives from each of the following departments
shall be responsible for the overall compliance of this protocol:
Department Responsibility
Execution of IQ Protocol, recording the
Engineering
data, and review of IQ document and
report
Details Entered By
Verified By
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 6 of 28
Table I
Required Information As-Found Condition
The subjected equipment is
RECIPROCATING AIR COMPRESSOR
identified as
Name and address of the CHICAGO PNEUMATIC
COMPRESSORS,
Manufacturer
PUNE
PX-60-7-A-E
Model No.
PNB-920654
Equipment Identification Number
System Location
Department ENGINEERING
Floor GROUND
Area UTILITY-1/2/3
Details Entered By
Verified By
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 7 of 28
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 8 of 28
A brief description of all the above said sub units are as below: -
Compressor:
a) Two Stage, Rotary Screw Element Complete With: -
b) Dry Paper Type Suction Air Filter With Silencer ; Conveniently Located For Easy Replacement Of Filter
Element
c) Un-loader With Integrated Regulating Valve For Load/Unload Control System ; Simple Design With Only
One Moving Part, Needs No Regular Adjustments
d) Three-Way Solenoid Valve Required for Load/Unload Regulation Of The Compressor
e) Air / Oil Temperature Sensor To Sense Air Oil Temperature At Element Outlet And To Shut Down The
Compressor In Case Of High Element Outlet Air Temperature
f) Air Check Valve At The Element Discharge .
Air-Oil Receiver Tank:
Pointer Indication For Oil Level And Oil Filling Arrangement
Minimum Pressure Valve To Close Off The Compressor From The Air Net When The Unit Is Stopped Or
Running Unloaded And To Maintain Required Air Pressure In The System For Proper Oil Lubrication.
Safety Valve
Air-Oil Receiver Pressure Gauge
Oil Draining Arrangement
Three Stage Air Oil Separation System
o First By Cyclonic Action (Centrifugal),
o Second By Gravitational (Heavier Particles Separate Down),
o Third By Passing Through Coalescent Filter
Motor :
2 Pole, Squirrel Cage Induction Motor With TEFC IP 55 Enclosure, Class F Insulation, Suitable For 46 0 C Ambient
Temperature And 400 +/- 10% Volts, 3phase, 50 +/- 3% Hz Supply
Motor Non drive end bearings greased for life.
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 9 of 28
3.0 Compressed Air storage & distribution Network: The compressed air produced by the air compressor is
stored in an air receiver (Storage tank). From the air receiver tank the compressed air is made available to the
Refrigerated type of air drier/ or to and application.
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 10 of 28
Details Entered By
Checked By
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 11 of 28
Checked by
Sr. Statement Observations
(Sign / Date)
No.
The "As Built" drawings are complete and represent the
1.
design concept.
The major components are securely anchored and
2.
protected from shock.
3. There is no observable physical damage.
Verified By
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 12 of 28
complying as per desired specifications. Record the observations in the Data Sheet.
o Check the MOC of the component as per the instruction mentioned. Record the
To check the leveling and alignment as per the procedure and record the observation
To verify the proper assembly of the components as per the equipment Drawings.
o Identify the utility supplies required for equipment operation. Verify that utilities are as per
the specification mentioned in the Check list. Record the observation in the Data Sheet.
o Identify the SOPs and assign SOP Numbers, record the SOP Title and Number.
o Record the deficiency (if any) and report the details of action taken.
When more than one unit of the same type exists, replicate the corresponding
Wherever specifications are not mentioned, record the observations as per the
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 13 of 28
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 14 of 28
Sr.
Test Particulars Specifications Observation Checked By
No. (Sign/Date)
1.6 Check the Make: -Rotex
specifications of Connection: ½” BSP (F)
Automatic Drain Voltage: -220VAC.
valve. Max. Pressure:
1.7 Check the No physical damage should be
Load/Unload solenoid observed.
valve for any physical
damage.
1.8 Check the Make: --Rotex
specifications of Valve Type:
Load/Unload solenoid Max. Pressure: 10 kg/cm2
1.9 valve.
Check the No physical damage should be
Load/Unload pressure observed.
transducers for any
physical damage.
1.10 Check the Low Oil No physical damage should be
Pressure for any observed.
physical damage.
1.11 Check the Make: - Chicago Pneumatic
specifications of Low Max press –0-3Kg/cm2
Oil pressure Pump.
1.12 Check the Electrical No physical damage should be
Control Panel for any observed.
physical damage.
1.13 Check all the electrical No physical damage should be
switchgears, terminals, observed.
and power and control
wiring for any
physical damage and
loose connections.
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 15 of 28
Sr.
Test Particulars Specifications Observation Checked By
No. (Sign/Date)
1.14 Check the No physical damage should be
Programmable Logic observed.
Controller for any
1.15 Check thedamage.
physical Make: -CP Tronix III
specifications of Sr.No:-
Programmable Logic
Controller.
1.16 Check the Human .No physical damage should be
Machine Interface for observed
any physical damage.
1.17 Check the No physical damage should be
communication cable observed
between PLC and
HMI for any physical
damage.
2.1 Check the Air Dryer There should not be any physical
for any physical damage.
damage.
2.2 Check the Make – Chicago Pneumatic
specification of the Compressors
Air Dryer. Voltage: 230 Volt , 50 Hz.
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 16 of 28
Sr.
Test Particulars Specifications Observation Checked By
No. (Sign/Date)
for any physical
damage.
3.2 Check the name plate NA -
details of the air
receiver tank
Verified By
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 17 of 28
Material of Method /
Sr. construction Reference used Checked by
Component
No. Specified Actual for verification
(Sign / Date)
1 Compressor
Air Dryer -
2
3 Air Receiver -
Comments:
___________________________________________________________________
__________________________________________________
________________________________________________________
Verified By
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 18 of 28
Method / Checked by
Observation
Sr. Reference used
Component (Sign / Date)
No. for verification
1 Levelling of the Base Frame of
compressor pulley
dryer
Comments: _____________________________________________________
_________________________________________________
__________________________________________________
Verified By
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 19 of 28
Place the spirit level indicator at different points on the machine frame.
Acceptance Criteria:
The air bubble of the spirit level indicator shall be observed in the center.
Place transparent tube filled with water of suitable length at various corners. Compare
Acceptance Criteria:
The water level at both the locations should match with the edges of those locations, if
required should be repeated for other edges of the equipment on same plane.
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 20 of 28
S. Checked by
Test Particulars Observation
No. (Sign / Date)
1. Check that equipment is
installed in the Room
specified in Equipment
Layout
2. Check that assemblies of
component are as per
the General
Arrangement Drawing.
Verified By
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 21 of 28
Verified By
Checked By
7.8 Drawings
Attach a copy of all relevant drawings and list below. Categorize the drawings as follows:
A. Piping and Instrumentation Diagram (P&ID).
B. General arrangement / Schematic line diagram.
C. Utility
D. Electrical (Starter Circuit & Service Diagram)
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 22 of 28
Verified By
Operational
01 Operation of Air Compressor
Manual of
machine
Please furnish
Operational
machine to
customer
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 23 of 28
Comments: _____________________________________________________
_________________________________________________
__________________________________________________
Verified By
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 24 of 28
5
Other (it any)
Comments: _____________________________________________________
_________________________________________________
__________________________________________________
Verified By
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 25 of 28
8.0 Re-qualification
Installation Qualification to be re qualified on:
Replacement of major component of the equipment with a new component.
Any major modification in the existing equipment.
Shifting / Reinstallation / Re commissioning of the equipment from one location to
another.
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 26 of 28
Comments: ___________________________________________________________
______________________________________________________
______________________________________________________
9.2 Conclusion:
The Compressed Air System bearing No IS qualifying the Installation Qualification test
as per the guideline described in this Protocol. The Compressed Air System can Be
tested for its operational qualification as per Protocol
Chicago Pneumatic Compressors
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 27 of 28
11.0 Appendix
11.1 Abbreviations
INSTALLATION QUALIFICATION
Equipment / System Compressed Air System
Document No. CP/IQ/ACME/002 Effective Date
Supersedes None Page Number 28 of 28
11.2 Annexure