Curriculum Vitae: Objective
Curriculum Vitae: Objective
Personal Information
WORK EXPERIENCE
Two year experience in the field of education as principal in the University Engineering
College Lahore, Pakistan
13 year experience in the field of education as an Asstt.professor in the Department of
Electrical Engineering University of south Asia Lahore, Pakistan.
Last 3 years i am working in PIMSAT Karachi as Campus Director.
Four year experience in the field of education as a visiting Lecturer in the Department of
Electrical Engineering in Imperial University Lahore, Pakistan.
More than three years of experience in the field of Grid Station and Transmission
lines as an Resident Engineer involved in the Supervision of construction, Erection,
Inspection and Testing and Commissioning of 66 KV, 132 KV, & 220 KV Transmission
lines in grid system construction Department of Water and Power Development
Authority Pakistan.
One year experience in the field of Telecommunication as Telecomm Engineer involved in
the Supervision of construction, Erection, Inspection and Testing and Commissioning of
BTS in PTCL Pakistan.
Three months experience in the field of Telecommunication as Telecomm Engineer involved
in the Inspection and Testing and Commissioning of BTS in Advance Technology Services
Pakistan.
Job Responsibilities
Responsible for all the inspection , Supervision of all the construction stages of 132/11.5
KV (GIS) indoor, modification substation include the following
Inspection of incoming material as per LESCO, Purchase order and Supplier provided
guide line.
Local Purchases material inspection as per Purchase request.
Close all site instruction / Punch point’s daily basis raised by NLC and Consultant.
Inspection for ear thing of cable tray 500 mm2 cu. Conductor and 11.5 Kv switch Gear
240 mm2 Cu. Conductor.
Installations of earthing flat bar 40 x 6 mm2.
Installation of testing of 03 Nos NER Neutral Earthing Resistor at basement +250 level.
Inspection for earthing of all S/S equipment with 240 mm2 Cu. Conductor.
Installation of metal clad bus duct for connection between 11.5 KV switch gears.
Erection, testing commissioning 03 sets of 11.5 KV metal clad switch gear. Vaccum type
circuit breaker, ground switches and metering panel.
Erection ,testing commissioning of 40 MVA 02 no power T/F 132/11.5 KV 3winding 3
phase 60 HZ with OLTC local and remote control cabinet and protection and metering
devices.
Installation of 02 no Aux T/F 500 KVA,60HZ,Dyn11 (Max 722Amp )
Laying and termination, testing of 110 KV XLPE power cable from H V sides of all
power T/F to 110 KV GIS equipments.
AC Auxiliary power supply
Worked in WAPDA GSO (Grid system Operation) as a in charge and Issuer of PTW at 132
KV sub stations.
Issuer of PTW 11KV out going feeder for shut down and periodic maintenance.
Issuer of PTW 132KV out going circuits and Incomer circuits for shut down and periodic
maintenance after approval the all operations RCC Islamabad.
Issuer of PTW 132KV T/F circuit breakers and CTS,PTS D/S,
Inspected and maintain the weekly and monthly report of 110V lead acid battery (specific
gravity, voltage per cell and electrolyte level of battery banks) .
Clear the punch points which raised by shift staff at daily.
Electrification of multistory buildings. (MPA Hostel ,phase 1,phase 2,phase 3)
Installation of fire alarm system.
Installation of telephone system
Installation of public address system.
Installation of substation equipment’s.
Worked as Telecomm Engineer in PTCL Lahore, Pakistan from 2005 to 2006.
Job Responsibilities
Commissioning of newly installed and existing BTS.
Alignment and cross connection for newly installed and existing sites.
Installation of new sites on turnkey bases including civil work.
Trouble shooting of BTS.
LANGUAGES KNOWN
English, Urdu.
DECLARATION
The personal and other particulars given above are true to the best of my knowledge and
belief.
REFERANCES