1) SGF, SGB and SGR Settings Are Applied For All of The SPAU140C Relays

This document provides information about an ABB SPAU 140C synchro-check relay used for applications in an ELNG facility. The relay has synchro-check and voltage-check protection functions to check synchronism and energizing conditions when connecting live lines/busbars. Settings for the synchro functions like SGF, SGB, and SGR are provided. The relay is located in various switchgears throughout the facility and should be inspected every 5 years, with activities like visual inspection and primary voltage testing to check for issues.

Uploaded by

Hatem Hussein
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
140 views

1) SGF, SGB and SGR Settings Are Applied For All of The SPAU140C Relays

This document provides information about an ABB SPAU 140C synchro-check relay used for applications in an ELNG facility. The relay has synchro-check and voltage-check protection functions to check synchronism and energizing conditions when connecting live lines/busbars. Settings for the synchro functions like SGF, SGB, and SGR are provided. The relay is located in various switchgears throughout the facility and should be inspected every 5 years, with activities like visual inspection and primary voltage testing to check for issues.

Uploaded by

Hatem Hussein
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 2

Protection relay: SPAU 140 C

Manufacturer: ABB
Relay description: Synchro-check relay
Protection functions:
25 (Synchro-check function)
(Voltage-check function)
ELNG applications:
Protection functions used: Synchro-check function and voltage-check function.

Synchro-check function for checking synchronism when live lines/busbars are to be


connected together.
Voltage-check function for checking energizing conditions. For energizing directions
selectable for each circuit breaker.
SPAU 140C fed from PT's on the two section of busbars.

Settings:
1) SGF, SGB and SGR settings are applied for all of the SPAU140C relays.
SGF selector switches settings:
Switch SGR/1 SGR/2 SGR/3 SGR/4 SGR/5 SGR/6 SGR/7 SGR/8
settings 1 1 1 1 1 1 1 1

SGB selector switches settings:


Switch SG/1 SG/2 SG/3 SG/4 SG/5 SG/6 SG/7 SG/8
settings 0 0 0 0 0 0 0 0

SGR selector switches settings:


Switch SG/1 SG/2 SG/3 SG/4 SG/5 SG/6 SG/7 SG/8
settings 0 0 0 0 0 0 0 0

2) General setting for all the SPAU140C relays

Setting Range Setting for ELNG


Umax/Un 0.5……1.0 * Un 0.9
Umin/Un 0.1……0.8 * Un 0.1
ΔU/Un 0.02…...0.4* Un 0.1
Δω 5…..50 5
Δf 0.02…..0.5 Hz 0.1
Tvc 0.1…..20 S 1
Tcheck 0.05….300 S 2
Tpulse 0.2….20 S 1
Tcb13 0.05…..0.25 S 0.25
Tcb23 0.05….0.25 S 0.25
Locations:
Substation Switchgear number
T1 Main area S.S 1EK-1041 1
1EK-0141 1
T1 compressor S.S 1EK-0142 1
1ES-0121 1
1EK-0143 1
T1 Propane S.S 1EK-0144 1
1EK-0145 1
1EK-0741 1
Loading area S.S
1ES-0721 1
2EK-0241 1
T2 compressor S.S 2EK-0242 1
2ES-0221 1
1EK-0143 1
T1 Propane S.S 1EK-0144 1
1EK-0145 1
Total 15

Inspection Frequency:
According to the manufacturer’s recommendations the relay should be submitted to
secondary testing at five years’ intervals

Inspection activities:
1) Visual inspection:

- Signs of mechanical damage to relay case and terminals.


- Collection of dust inside the relay case; remove with compressed air.
- Signs of corrosion on terminals, case or inside the relay.

2) Primary voltage test:

The manufacturer recommends regular testing of the relay. This test should be carried
out as a primary test, which includes the entire supervision chain covered by the
synchro-check relay, from the instrument transformers to the circuit breakers.

Required logistics:
- Manpower:
Electrical engineer
Electrician
- Tools:
- Air blower (cordless, variable speed blower – MAKITA)
- Relays tester
Inspection Report