TRAINING ACTIVITY MATRIX
Training Trainee Facilities/ Venue Date Remarks
Activity Tools and (Workstation/ &
Equipment Area) Time
Prayer All 7:30AM
Recap of trainees to
Activities 8:00AM
Unfreezing
Activities
Feedback of
Training
Rejoinder
/ Motivation
Assemble Grado 1. Computer Practical Sept 1 – Assembled
computer Lamsin unit and Work Area – Sept 9, computer
hardware Layaog peripherals Computer 2021 hardware
Prepare Leonor 2. Tools Prepared
Laboratory
installer Maldo 3. Windows installer
Ofamen installer 8:00AM
Install UC 1 Install Installed
operating Pajo 4. Device to operating
and
system and driver 5:00PM system and
installer Configure
drivers for drivers for
5. Computer
peripherals/ peripheral/
devices Application Systems devices
Install software Installed
application installer application
software 6. software
Conduct Diagnostic Conducted
testing and tools testing and
documentation documentation
Install Agustin 1. Computer Practical Sept 10 Installed
network cables Ajero units Work Area – – network
Set network Balane 2. LAN Computer Sept cables
configuration Bangi tester Set network
Laboratory 17,
Set Buligan 3. Crimping configuration
Cainglet tools 2021
router/Wi-Fi/ UC 2 Set-up Set
wireless access 4. UTP cable Computer 8:00AM router/Wi-
point/repeater 5. Switch Fi/ wireless
Networks to
configuration 6. WAP access
7. RJ45 5:00PM point/
Inspect and
test the 8. Patch repeater
configured panel configuration
computer Inspected
networks and tested
the
configured
computer
networks
Set-up user Casicas 1. Computer Practical Sept 18 Set-up user
access Corda units Work Area – – access
Configure Evidientes2. Server Computer Sept Configured
network Espinosa installer network
Laboratory 25,
services Gadia 3. LAN services
Gomez 2021
Perform tester UC 3 Set-up Performed
testing, 4. Crimping Computer 8:00AM testing,
documentation, tools documentation
Server to
and pre- 5. UTP cable and pre-
deployment 6. Switch 5:00PM deployment
procedures 7. WAP procedures
8. RJ45
9. Patch
panel
Plan and Ratay 1. Computer Practical Sept 26 Planned
prepare for Rodriguez units, Work Area – – Oct 3, and prepared
maintenance Sab peripherals Computer 2021 for
and repair Torres and maintenance
Laboratory
Maintain Tuquib equipment 8:00AM and repair
computer Valle 2. Tools UC 4 to Maintained
systems and 3. Accom- Maintain and 5:00PM computer
networks plishment systems and
Repair
Diagnose report form networks
Computer
faults of Diagnosed
computer Systems and faults of
systems and Networks computer
networks systems and
Rectify/correct networks
defects in Rectified/
computer corrected
systems and defects in
networks computer
Inspect and systems and
test the networks
computer Inspected
systems and and tested
networks the computer
systems and
networks