Blk-12, Lot-3, P4 Vista Verde, South Exec - Village, Mambog3, City of Bacoor, Cavite

This document outlines the bill of materials and scope of works for a 2-storey residential project located in Bacoor City, Cavite, Philippines. It includes 8 items for structural works (concrete and reinforcement) such as column footings, columns, tie beams, wall footings, beams, slabs and concrete stairs, CHB walls, and construction management. The total cost for structural works is estimated at PHP 677,156.92. Temporary facilities are budgeted at PHP 18,000. Mobilization costs PHP 19,800.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Blk-12, Lot-3, P4 Vista Verde, South Exec - Village, Mambog3, City of Bacoor, Cavite

This document outlines the bill of materials and scope of works for a 2-storey residential project located in Bacoor City, Cavite, Philippines. It includes 8 items for structural works (concrete and reinforcement) such as column footings, columns, tie beams, wall footings, beams, slabs and concrete stairs, CHB walls, and construction management. The total cost for structural works is estimated at PHP 677,156.92. Temporary facilities are budgeted at PHP 18,000. Mobilization costs PHP 19,800.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TITLE: Bill of Materials & Scope of Works

PROJECT: 2 Storey Residential


Owner: Marie Cris Dichoso David
Location: Blk-12,Lot-3,P4 Vista Verde, South Exec.Village,Mambog3,City of Bacoor,Cavite

Item no. Description Qty unit M.Cost/unit L.cost/unit T.cost


1.0 Mobilization 19,800.00
1.1 Demolition sqm - 350.00 -
1.2 Site Clearing - sqm - 120.00 -
1.3 Excavation 9.00 cum - 200.00 1,800.00
1.4 Site Elevation/Land Fill - cum - 150.00 -
1.5 Temporary Facilities 9.00 sqm 1,000.00 1,000.00 18,000.00
1.6 Construction Management - sqm - 800.00 -
2.0 Strucural (CONCRETE AND REINFORCEMENT) 677,156.92
2.1 Column Footing 3.00 cum 7,680.00 7,000.00 26,540.00
Sand 1.50 cum 1,200.00
Gravel 3.00 cum 1,580.00
Cement 27.00 bags 220.00
10mm rebar - pcs 155.00
12mm rebar - pcs 220.00
16mm rebar 27.00 pcs 380.00
tie wire 15.00 kg 20.00
2.2 Column 4.10 cum 10,777.50 7,000.00 72,887.75
Sand 2.05 cum 1,200.00
Gravel 4.10 cum 1,580.00
Cement 49.20 bags 220.00
10mm rebar 51.25 pcs 155.00
12mm rebar 16.40 pcs 220.00
16mm rebar 32.80 pcs 380.00
tie wire 20.50 kg 20.00
2.3 Tiebeam 3.00 cum 9,925.00 2,250.00 38,775.00
Sand 1.50 cum 1,200.00
Gravel 3.00 cum 1,580.00
Cement 36.00 bags 220.00
10mm rebar 21.00 pcs 155.00
12mm rebar 12.00 pcs 220.00
16mm rebar 24.00 pcs 380.00
tie wire 15.00 kg 20.00
2.4 Wall footing 0.50 cum 7,300.00 1,900.00 6,650.00
Sand 0.25 cum 1,200.00
Gravel 0.50 cum 1,580.00
Cement 6.00 bags 220.00
10mm rebar 2.00 pcs 155.00
12mm rebar 4.00 pcs 220.00
16mm rebar - pcs 380.00
tie wire 2.50 kg 20.00
2.5 Beam 4.20 cum 11,890.00 6,000.00 59,938.00
Sand 2.10 cum 1,200.00
Gravel 4.20 cum 1,580.00
Cement 50.40 bags 220.00
10mm rebar 58.80 pcs 155.00
12mm rebar 33.60 pcs 220.00
16mm rebar 33.60 pcs 380.00
tie wire 21.00 kg 20.00
2.6 SLAB & Concrete Stairs 10.00 cum 11,290.00 6,000.00 153,900.00
Sand 5.00 cum 1,200.00
Gravel 10.00 cum 1,580.00
Cement 90.00 bags 220.00
10mm rebar 340.00 pcs 155.00
12mm rebar 80.00 pcs 220.00
16mm rebar - pcs 380.00
tie wire 50.00 kg 20.00
2.7 CHB WALL 6" 140.00 sqm 789.65 250.00 145,551.00
6" CHB 1,820.00 pcs 15.00
Sand 30.80 cum 1,200.00
Cement 140.00 bags 220.00
10mm rebar 99.40 pcs 155.00
tie wire 4.20 kg 20.00
2.8 CHB WALL 4" 110.00 sqm 705.65 250.00 105,121.50