Arthur Vazovsky 15 Park Drai Eechelen 1499 Luxembourg
Arthur Vazovsky 15 Park Drai Eechelen 1499 Luxembourg
Total capacity requested 140 kW Please note that according the liberalisation of the
customer must enter into a gas supply contract with
Nominal pressure requested 10 mbar people commissioning the gas installation. This supply
steps with the grid operator to allow the supply of gas. A
Charges for meter installation complete list of suppliers can be found on the end
customer does not choose a supplier a default
Installation of a cat. 1 gas meter 175.50 € ≤200kW accordance with Article 4 of the law of 1 August 20 the
natural gas market, as amended.
Installation of a cat. 2 gas meter 285.50€ <200kW -≤600kW
The present appliaction is deemed to be an order for the installation of a meter in accordance with the tariff coresponding to the total power of the installation as in the tabels
Payments
Important Information
1 Please indicate the total capacity (power) of all devices connected to the gas installation.
2 In general for an installation connected to the low-pressure grid, the nominal pressure is equal the 20 mbar (standard)
3 The number is indicated on the gas meter. You can also enter the POD number you finde on your supplier's bill.