100% found this document useful (1 vote)
77 views

Warehouse Processes For ATTP Integration

The document outlines warehouse processes for integrating with SAP ATTP. It describes the inbound and outbound processes for serialized products manufactured in-house and received from contract manufacturers, including the integration steps from production, purchase, and sales orders through goods receipt, put away, picking, packing and goods issue.

Uploaded by

ravinash1986
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
77 views

Warehouse Processes For ATTP Integration

The document outlines warehouse processes for integrating with SAP ATTP. It describes the inbound and outbound processes for serialized products manufactured in-house and received from contract manufacturers, including the integration steps from production, purchase, and sales orders through goods receipt, put away, picking, packing and goods issue.

Uploaded by

ravinash1986
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Warehouse Processes For ATTP Integration

1. Serialized Products Manufactured In-House:


Point of origin for serialized products within the organization will be the own SAP ATTP
instance, with an inbound delivery created for a production order. ATTP validations/integration
begin from production order creation and end with goods issue.

Inbound process from production order to put away.

Integration steps with ATTP


 Production order confirmation
 Inbound delivery
 Goods receipt
 Put away

Outbound process from sales order to goods issue (or direct outbound delivery to goods issue).

Integration steps with ATTP


 Outbound delivery creation
 Picking and packing
 Goods Issue

2. Serialized Products Received From CMO (Subcontracting):


Point of origin for serialized products within the organization will be the inbound delivery
created against purchase order. ATTP validations/integration begin from inbound delivery
creation and end with goods issue.
Warehouse Processes For ATTP Integration

Inbound process from inbound delivery to put away.

Integration steps with ATTP


 Inbound delivery creation
 Goods receipt
 Deconsolidation (Non homogenous HUs)
 Put away

Outbound process from sales order to goods issue (or direct outbound delivery to goods issue).

Integration steps with ATTP


 Outbound delivery creation
 Picking and packing
 Goods Issue

You might also like