External Provider Billing Statement: To Be Filled Up by Accounting Department

This external provider billing statement from S&C Waterworks Services is for work done from March 6, 2021 to August 23, 2021 on the construction project to rehabilitate and upgrade Severo M. Verallo Provincial Hospital in Bogo City, Cebu. It shows that S&C Waterworks Services has completed 10.10% of the work to date and is requesting payment of PHP 8,080 which is 10.10% of the PHP 80,000 contract amount. The necessary attachments required for this billing are also listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
111 views2 pages

External Provider Billing Statement: To Be Filled Up by Accounting Department

This external provider billing statement from S&C Waterworks Services is for work done from March 6, 2021 to August 23, 2021 on the construction project to rehabilitate and upgrade Severo M. Verallo Provincial Hospital in Bogo City, Cebu. It shows that S&C Waterworks Services has completed 10.10% of the work to date and is requesting payment of PHP 8,080 which is 10.10% of the PHP 80,000 contract amount. The necessary attachments required for this billing are also listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EXTERNAL PROVIDER BILLING STATEMENTF-ACT-001 | Rev.

3 | 01/25/2021 | Page 1 of 2

Contractor: S&C WATERWORKS SERVICES Date: 6-Mar-21


JC No.: 2065 EPBS:
Project Code: ACI -241 JCS#:
Project Name:
18HD-0109 - CONSTRUCTION/REHABILITATION/UPGRADING OF SEVERO M.
VERALLO PROVINCIAL HOSPITAL, BOGO CITY, CEBU C Amount: ₱ 80,000.00

ADVANCED PAYMENT PERCENT (%) AMOUNT CONSTRUCTION HEAD


(SIGNATURE)
Downpayment
Retention

SUBCON SITE ENGINEER / PIC QS


PROGRESS
% Amount % Amount % Amount

To Date: 10.10% 10.10% ₱ 8,080.00 10.10% ₱ 8,080.00


Previous: 0.00% 0.00% ₱ - 0.00% ₱ -
This Period: 10.10% 10.10% ₱ 8,080.00 10.10% ₱ 8,080.00
Scheduled: _______ 14.29% Signature:
Slippage: ________ -4.19% Name: S&C WATERWORKS SERVICES ACE JOEMARIE LEGASPINA
# of Days: _______________ Date: 6-Mar-21 6-Mar-21
TO BE FILLED UP BY ACCOUNTING DEPARTMENT
Collectable Payment ₱
Less: Deduction Rate
Expanded Witholding Tax
Recoupment
Retention
Liquidated Damages
Other: (Pls. Specify)
Total Deductions ₱
Net Collectable Payment ₱

Prepared by: Bookkeeper Reviewed by: Accounting Supervisor

Signature over Printed Name Date Signature over Printed Name Date

MINIMUM REQUIRED ATTACHMENTS FOR EXTERNAL PROVIDERS WHOSE TERMS OF PAYMENT WEEKLY & MONTHLY:
1 DOWNPAYMENT 3 100% COMPLETION
1.1 F-ACT-001 External Provider Billing Statement 3.1 F-ACT-001 External Provider Billing Statement
1.2 Notice of Award (NOA) 3.2 F-OPR-009 Subcrontractors Summary of Work Accomplishment
1.3 Notice to Proceed (NTP) 3.3 Keyplan indicating the accomplished work
1.4 F-PUR-006 Job Contract 3.4 Geotagged Progress Photos (Before and After) pers cope of work
1.5 Mobilization Photos 3.5 Approved Work request Form
Note: In case of no downpayment, the above-mentioned requirements must be attached to the first progress
billing. 3.6 Certificate of Completion
2 BILLING AND ONWARDS
2.1 F-ACT-001 External Provider Billing Statement 2.5 F-OPR-017 JC Time Extension Request Form, if applicable
2.2 F-OPR-009 Subcrontractors Summary of Work Accomplishment (SWA) 2.6 Copy of previous External Provider Billing Statement & SWA
2.3 Geotagged Progress photos (Before and After) per scope of work 2.7 Keyplan indicating the accomplished work
2.4 Material Test Result, if applicable 2.8 Approved Work Request Form
4 RETENTION
4.1 F-ACT-001 External Provider Billing Statement 4.3 Copy of previous External Provider Billing Statement
4.2 Certificate of Acceptance

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Contractor: S&C WATERWORKS SERVICES Date: 6-Mar-21
JC No.: 2065 EPBS:
Project Code: ACI -241
18HD-0109 - CONSTRUCTION/REHABILITATION/UPGRADING OF SEVERO M. JCS#:
Project Name: VERALLO PROVINCIAL HOSPITAL, BOGO CITY, CEBU C Amount: ₱ 3,400,000.00
SUBCON SITE ENGINEER / PIC QS
PROGRESS
% Amount % Amount % Amount
To Date: 10.10% 10.10% ₱ 8,080.00 10.10% ₱ 8,080.00
Previous: 0.00% 0.00% ₱ - 0.00% ₱ -
This Period: 10.10% 10.10% ₱ 8,080.00 10.10% ₱ 8,080.00
Scheduled: ______ 14.29% Signature:
Slippage: ________ -4.19% Name: S&C WATERWORKS SERVICES ACE JOEMARIE LEGASPINA
# of Days: _________ Date: 6-Mar-21 6-Mar-21
TO BE FILLED UP BY ACCOUNTING DEPARTMENT
Collectable Payment ₱
Less: Deduction Rate
Expanded Witholding Tax
Recoupment
Retention
Liquidated Damages
Other: (Pls. Specify)
Total Deductions ₱
Net Collectable Payment ₱
Prepared by: Bookkeeper Reviewed by: Accounting Supervisor

Signature over Printed Name Date Signature over Printed Name Date
EXTERNAL PROVIDER BILLING STATEMENTF-ACT-001 | Rev. 3 | 01/25/2021 | Page 2 of 2

Contractor: S&C WATERWORKS SERVICES Date: August 23, 2021


JC No.: 2065 EPBS:
Project Code: ACI -241 JCS#:
Project Name:
18HD-0109 - CONSTRUCTION/REHABILITATION/UPGRADING OF SEVERO M.
VERALLO PROVINCIAL HOSPITAL, BOGO CITY, CEBU C Amount: ₱ 80,000.00

ADVANCED PAYMENT PERCENT (%) AMOUNT CONSTRUCTION HEAD


(SIGNATURE)
Downpayment
Retention

SUBCON SITE ENGINEER / PIC QS


PROGRESS
% Amount % Amount % Amount

To Date: 90.00% 90.00% ₱ 72,000.00 90.00% ₱ 72,000.00


Previous: 18.10% 18.10% ₱ 14,480.00 18.10% ₱ 14,480.00
This Period: 71.90% 71.90% ₱ 57,520.00 71.90% ₱ 57,520.00
Scheduled: _______ 14.29% Signature:
Slippage: ________ 75.71% Name: S&C WATERWORKS SERVICES
# of Days: _______________ Date: August 23, 2021 August 23, 2021
TO BE FILLED UP BY ACCOUNTING DEPARTMENT
Collectable Payment ₱
Less: Deduction Rate
Expanded Witholding Tax
Recoupment
Retention
Liquidated Damages
Other: (Pls. Specify)
Total Deductions ₱
Net Collectable Payment ₱

Prepared by: Bookkeeper Reviewed by: Accounting Supervisor

Signature over Printed Name Date Signature over Printed Name Date

MINIMUM REQUIRED ATTACHMENTS FOR EXTERNAL PROVIDERS WHOSE TERMS OF PAYMENT WEEKLY & MONTHLY:
1 DOWNPAYMENT 3 100% COMPLETION
1.1 F-ACT-001 External Provider Billing Statement 3.1 F-ACT-001 External Provider Billing Statement
1.2 Notice of Award (NOA) 3.2 F-OPR-009 Subcrontractors Summary of Work Accomplishment
1.3 Notice to Proceed (NTP) 3.3 Keyplan indicating the accomplished work
1.4 F-PUR-006 Job Contract 3.4 Geotagged Progress Photos (Before and After) pers cope of work
1.5 Mobilization Photos 3.5 Approved Work request Form
Note: In case of no downpayment, the above-mentioned requirements must be attached to the first progress
billing. 3.6 Certificate of Completion
2 BILLING AND ONWARDS
2.1 F-ACT-001 External Provider Billing Statement 2.5 F-OPR-017 JC Time Extension Request Form, if applicable
2.2 F-OPR-009 Subcrontractors Summary of Work Accomplishment (SWA) 2.6 Copy of previous External Provider Billing Statement & SWA
2.3 Geotagged Progress photos (Before and After) per scope of work 2.7 Keyplan indicating the accomplished work
2.4 Material Test Result, if applicable 2.8 Approved Work Request Form
4 RETENTION
4.1 F-ACT-001 External Provider Billing Statement 4.3 Copy of previous External Provider Billing Statement
4.2 Certificate of Acceptance

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Contractor: S&C WATERWORKS SERVICES Date: August 23, 2021
JC No.: 2065 EPBS:
Project Code: ACI -241
18HD-0109 - CONSTRUCTION/REHABILITATION/UPGRADING OF SEVERO M. JCS#:
Project Name: VERALLO PROVINCIAL HOSPITAL, BOGO CITY, CEBU C Amount: ₱ 80,000.00
SUBCON SITE ENGINEER / PIC QS
PROGRESS
% Amount % Amount % Amount
To Date: 90.00% 90.00% ₱ 72,000.00 90.00% ₱ 72,000.00
Previous: 18.10% 18.10% ₱ 14,480.00 18.10% ₱ 14,480.00
This Period: 71.90% 71.90% ₱ 57,520.00 71.90% ₱ 57,520.00
Scheduled: ______ 14.29% Signature:
Slippage: ________ 75.71% Name: S&C WATERWORKS SERVICES
# of Days: _________ Date: August 23, 2021 August 23, 2021
TO BE FILLED UP BY ACCOUNTING DEPARTMENT
Collectable Payment ₱
Less: Deduction Rate
Expanded Witholding Tax
Recoupment
Retention
Liquidated Damages
Other: (Pls. Specify)
Total Deductions ₱
Net Collectable Payment ₱
Prepared by: Bookkeeper Reviewed by: Accounting Supervisor

Signature over Printed Name Date Signature over Printed Name Date

You might also like