100% found this document useful (1 vote)
2K views1 page

Quality Control - Works Inspection: Granite Door Frame

The document is a quality control inspection report for the installation of granite door frames at the Sandvik Pvt Ltd G Block project. It details 9 inspection items to check for quality compliance, including verifying approved shop drawings, samples, thickness, dimensions, joints, polish and cleanliness. The report forms were signed by representatives from the contractor, JLL, and architect after inspection.

Uploaded by

Paras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views1 page

Quality Control - Works Inspection: Granite Door Frame

The document is a quality control inspection report for the installation of granite door frames at the Sandvik Pvt Ltd G Block project. It details 9 inspection items to check for quality compliance, including verifying approved shop drawings, samples, thickness, dimensions, joints, polish and cleanliness. The report forms were signed by representatives from the contractor, JLL, and architect after inspection.

Uploaded by

Paras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

REQUEST DATE:

QUALITY CONTROL - WORKS INSPECTION ITEMS: Granite Door Frame


REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block
PACKAGE C&I packages
CONTRACTOR Architects Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE DATE
INSPECTION
SAND-BOQ-INT-01 - H BY
BOQ REF. NO. TIME
-58
ITEM DETAILS: Granite Door Frame
WING NO. G-Block
LOCATION FOR
INSPECTION Wash Rooms & Pantry
FLOOR NO. 3rd floor AREA Coromet, Projects

CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY


Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
1 Check for the Approved Shop drawing

2 Check for approved Sample

3 Check for approved Colour of Granite

4 Check for thickness of the Granite

5 Check for Right Angle / Plumb / Level / Line of door fixing

6 Check for door opening size

7 Check for joints & Joints filling.

8 Check for the Granite edge Polish.

9 Check for the cleaning

Observations if any :

Contractor/Vendor JLL Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Page 1 of 1