Quality Control - Works Inspection: Door Hardware

This document is a quality control inspection checklist for the installation of door hardware at the Sandvik Pvt Ltd G Block project. It lists the various door hardware items to be inspected, including hinges, handles, locks, door closers, and patch fittings. For each item, it specifies the details to check such as make, model number, dimensions, positioning, and working condition. Inspectors from the contractor and consultant will use this checklist to conduct inspections in multiple rounds and ensure compliance with specifications.

Uploaded by

Paras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
872 views2 pages

Quality Control - Works Inspection: Door Hardware

This document is a quality control inspection checklist for the installation of door hardware at the Sandvik Pvt Ltd G Block project. It lists the various door hardware items to be inspected, including hinges, handles, locks, door closers, and patch fittings. For each item, it specifies the details to check such as make, model number, dimensions, positioning, and working condition. Inspectors from the contractor and consultant will use this checklist to conduct inspections in multiple rounds and ensure compliance with specifications.

Uploaded by

Paras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

REQUEST DATE:

QUALITY CONTROL - WORKS INSPECTION ITEMS: Door Hardware


REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block
PACKAGE C&I packages
CONTRACTOR Architec ts Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE DATE
INSPECTION BY
BOQ REF. NO. NA TIME

ITEM DETAILS: Door Hardware WING NO. G Block


LOCATION FOR
INSPECTION All area
FLOOR NO. 3rd floor AREA Coromet, Projects

CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY


Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
A Hinges

1 Check for make

2 Check for model number

3 Check for dimension

4 Check for positioning as per drawing

5 Check for screws for fixing

6 Check for working condition

Handles

1 Check for make

2 Check for model number

3 Check for dimension

4 Check for positioning as per drawing

5 Check for screws for fixing

6 Check for working condition

B Lock

1 Check for make

2 Check for model number

3 Check for dimension

4 Check for positioning as per drawing

5 Check for screws for fixing

6 Check for working condition

7 Check for number of keys

C Door Closer

1 Check for make

2 Check for model number

3 Check for dimension

4 Check for positioning as per drawing

5 Check for screws for fixing

6 Check for Closing speed

7 Check for Latching action

8 Check for Backcheck

9 Check for Delayed action

Page 1 of 2
REQUEST DATE:
QUALITY CONTROL - WORKS INSPECTION ITEMS: Door Hardware
REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block

D Patch Fitting

1 Check for make

2 Check for model number

3 Check for dimension

4 Check for positioning as per drawing

5 Check for screws for fixing

6 Check for working condition

Observations if any :

Contractor/Vendor JLL Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Page 2 of 2