0% found this document useful (0 votes)
345 views1 page

Iteration Review Facilitator Checklist

The document provides a checklist for facilitating an iteration review. It includes steps to prepare such as updating iteration goals and testing the product increment. During the review, stories that were worked on should be demonstrated and feedback received. Following up, the team backlog should be updated based on feedback and work not completed identified to move to future iterations. Tips are provided such as limiting demo preparation time and ensuring the right participants are present.

Uploaded by

lyaviol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
345 views1 page

Iteration Review Facilitator Checklist

The document provides a checklist for facilitating an iteration review. It includes steps to prepare such as updating iteration goals and testing the product increment. During the review, stories that were worked on should be demonstrated and feedback received. Following up, the team backlog should be updated based on feedback and work not completed identified to move to future iterations. Tips are provided such as limiting demo preparation time and ensuring the right participants are present.

Uploaded by

lyaviol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Iteration Review Facilitator Checklist

Preparation Checklist
Update the status of the Iteration goals
† Make sure the time and location of the Iteration
†
review is known
Product Increment is tested and ready to demo
†
Invite other stakeholders who will want to see the
†
Agree on the presenter and order of the stories to
† team’s progress, which may include members
be demonstrated
of other teams
Prepare any findings and results required to
† Teleconference and/or videoconference line
†
demonstrate spikes and refactors
is reserved and communicated in invitation for
remote attendees

Actions to take from Iteration Review


Update the Team Backlog based on the feedback
† Take these findings into the Iteration retrospective
†
of the Stories demoed and consider how the next Iterations can be better
planned and executed
Reflect on the unfinished stories
†
Identify work for integration in the cross-team
†
This often reveals impediments or risks, false
† System Demo
assumptions, changing priorities, estimating
inaccuracies or over-commitment Move the work not completed to the backlog for
†
prioritization and consideration in future Iterations

Tips and Techniques


• Limit demo preparation to one to two hours • The Product Owner should not be seeing the
• Ensure different team members have the stories demoed for the first time during the
opportunity to demo Iteration Review
• Minimize the use of slides and demonstrate • Make sure the right participants are present
working product increments run from • Avoid the team becoming passive actors and the
appropriate environments Product Owner doing all the talking
• Incomplete work should not be demonstrated • The team discusses issues/risks uncovered during
without proper caveats the Iteration and captures feedback
• Progress towards the team’s PI • Ensure the team celebrates its accomplishments
Objectives is discussed and stakeholders acknowledge them