Concrete Volume and Estimate-HSD

The document provides a cost estimate for 1 cubic meter of concrete including material quantities and costs. It lists the required ratios of cement, sand, and gravel for a 3,000 psi concrete mix. For 1 cubic meter of concrete it estimates: - 10 bags of cement costing PHP 2,618.34 - 0.42 cubic meters of sand costing PHP 588 - 0.84 cubic meters of gravel costing PHP 1,092 For a total material cost of PHP 4,298.34. Notes provide additional information on unit conversions used in the estimates.

Uploaded by

Teo Wwider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views

Concrete Volume and Estimate-HSD

The document provides a cost estimate for 1 cubic meter of concrete including material quantities and costs. It lists the required ratios of cement, sand, and gravel for a 3,000 psi concrete mix. For 1 cubic meter of concrete it estimates: - 10 bags of cement costing PHP 2,618.34 - 0.42 cubic meters of sand costing PHP 588 - 0.84 cubic meters of gravel costing PHP 1,092 For a total material cost of PHP 4,298.34. Notes provide additional information on unit conversions used in the estimates.

Uploaded by

Teo Wwider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

1 CU.M.

CONCRETE QUANTITY AND COST ESTIMATE


DATA :
Length, L: 1.00 m.
Width, W: 1.00 m.
Height, H: 1.00 m.
Area, A : 1.00 sq.m.
Volume, Vol: 1.00 cu.m. ; wet voL.
Dry Volume 1.54 cu.m. ; Vol x 1.54
RATIO CEMENT SAND GRAVEL CONCRETE STRENGTH
1 1.5 3 3,000 PSI
Wt. f cement: 40 kg / bag
Vol. of cement 0.028 cu.m. / bag ; 1 cf
Cement density: 1440 kgs/cu.m.
TOTAL MATERIAL QUANTITIES FOR 1m x 1m x 1m CONCRETE
MATERIAL QTY UNIT UNIT COST COST
1. Cement 9.88 bags 265.00 2,618.34
2. Sand 0.42 cu.m. 1400.00 588.00
3. Gravel 0.84 cu.m. 1300.00 1,092.00
TOTAL MATERIALS COST PHP 4,298.34
NOTES:
A) 1 bag of 40 kg cement is 1 cf (cubic ft.)
B) Use 1 cf box for measuring the volume if on concrete materials.
C) For 1:2:4 ratio, 22 liters of water is needed per 40 kg bag of cement to achieve 3,000 psi
concrete strength.
by: HarleyA Simple Designs
Youtube Channel: https://www.youtube.com/channel/UCZOgAMxZ_kb3s5s_9psMZAA/
Facebook Page: https://www.facebook.com/HarleyA.Simple.Designs/?modal=admin_todo_tour

1 of
SUMMARY

2 of
MATERIAL QTY UNIT UNIT COST COST
1. Cement 143 bags 265.00 PHP 37,794.30
2. Sand 6.00 cu.m. 1400.00 PHP 8,400.00
3. Gravel 12.00 cu.m. 1300.00 PHP 15,600.00

TOTAL COST PHP 61,794.30

3 of
vol of cement: ratio of cement / total ratio x dry volume

total ratio: 6
Vol of cement: 0.28 cu.m.
9.88 cf ; 1 cf = 1 bag (40kg)
say : 10 bags

1 CUBIC METER CONCRETE


cement (40kg.) 0.28 cu.m. 10 bags 1 cu.m.
sand: 0.42 cu.m.
gravel: 0.84 cu.m.

W=1m

L=1m

COLUMN
b: 0.30 m.
d: 0.30 m.
h: 0.30 m.
h=0.3
vol 0.03 cu.m. ;bxdxh
qty. : 6 pcs.
Total vol.: 0.162 cu.m. ; vol x qty.
SUMMARY
cement (40kg.) 2 bags ; Total vol x 8
sand: 0.07 cu.m. ; Total vol x .44
gravel: 0.14 cu.m. ; Total vol x .88 d = 0.3
b = 0.3

BEAM
L: 5.00 m.
b: 0.30 m.
d: 0.40 m.
vol 0.60 cu.m. ;bxdxh
qty. : 6 pcs.

4 of
Total conc. vol.: 3.6 cu.m. ; vol x qty.
SUMMARY L=5
cement (40kg.) 36 bags ; Total vol x 8
sand: 1.51 cu.m. ; Total vol x .44
gravel: 3.02 cu.m. ; Total vol x .88

FOOTING
L: 1.00 m.
w: 1.00 m.
t: 0.35 m.
vol 0.35 cu.m. ;bxdxh
qty. : 6 pcs.
Total conc. vol.: 2.1 cu.m. ; vol x qty. L=1
SUMMARY
cement (40kg.) 21 bags ; Total vol x 8
sand: 0.88 cu.m. ; Total vol x .44
gravel: 1.76 cu.m. ; Total vol x .88

SLAB
L: 8.00 m.
w: 6.00 m.
t: 0.13 m.
vol 6.00 cu.m. ; bxdxh
qty. : 1 pcs.
Total conc. vol.: 6 cu.m. ; vol x qty. L=8
SUMMARY
cement (40kg.) 60 bags ; Total vol x 8
sand: 2.52 cu.m. ; Total vol x .44
gravel: 5.04 cu.m. ; Total vol x .88

WALL FOOTING

5 of
L: 20.00 m.
w: 0.60 m.
t: 0.20 m.
Total conc. vol.: 2.40 cu.m. ; bxdxh

SUMMARY

cement (40kg.) 24 bags ; Total vol x 8 L=20


sand: 1.01 cu.m. ; Total vol x .44
gravel: 2.02 cu.m. ; Total vol x .88

6 of
H=1m

d=0.4

7 of
b=0.3

t=0.35

w=1

t=0.125

w=6

8 of
t=0.2

w=0.6

L=20

9 of
vol101

HAVE YOU SUBSCRIBED TO MY

Youtube Channel: yes https://www


BED TO MY HarleyA Simple Design YouTube

https://www.youtube.com/channel/UCZOgAMxZ_
https://www.youtube.com
YouTube Channel? YES Thank you.

outube.com/channel/UCZOgAMxZ_kb3s5s_9psMZA
Thank you. If you are using my program with

b3s5s_9psMZAA/
GRAVEL
y program without subcribing, SHAME ON Y
GRAVEL
HAME ON YOU.!!

You might also like