Test Case Document
Test Case Document
A/M/D
Version No. Date Revised Change Description (Add/Modify/Deleted) Prepared By
Approved By
Project Name: <Name of the Project>
REFERENCE DOCUMENTS
Path Version
est Case
Prerequisites:
<Conditions that should be
Assumptions: true to execute
<Scenarios thatthe
aretest case>
assumed
to be true for the test case>
Test ID# Reqt ID# Test Case Description Testable Identifier Importance Pre/Initial Conditions
Test Case
Cycle 1
Input Data Test Steps Expected Result
Test Result Actual Results
Cycle 1 Cycle 2
#Bug ID Test Result Comments Test Result Actual Results #Bug ID Test Result Comments
Passed
Failed
Executed
Not Executed
Not Applicable
Total 0 0
Cycle 3
% TC