TR-OT-MK-39 (B): APPROVED AS NOTED
MOCK UP FOR CL_05 IN MALE TOILET +36.60 LVL HAS BEEN INSPECTED AND FOUND
SATISFACTORY
CONTRACTOR TO ENSURE THE FOLLOWING:
o PROVIDE ADDITIONAL SUPPORTS TO HANG THE CEILING, AS INSTRUCTED AT SITE
o LEVELS TO BE CHECKED & ALIGNED AS PER THE APPROVED SHOP DRAWINGS
o MEP WORKS TO BE CHECKED PRIOR TO CLOSE THE CEILING
APPROVAL SUBJECT TO THE PROPER ARCHITECTURAL FINISHING
SUBMIT CHECKLIST AFTER THE COMPLETION OF EACH PHASE/ LAYERS
FULLY COMPLY WITH THE CONTRACTUAL DOCUMENTS, APPROVED SHOP DRAWINGS &
SPECIFICATIONS