Three Storey Residential Building Engr. Henry Florendo: 1: 100 Typ. RC Beam Elevation
Three Storey Residential Building Engr. Henry Florendo: 1: 100 Typ. RC Beam Elevation
COL STRIP
S/4
2⌀10 TIE BAR (CONTINUOUS)
MIDDLE STRIP
EXTRA BARS (EB)
L/5 L/5
S/2
COL STRIP
BOTTOM BARS @ MIDDLE STRIP
BOTTOM BARS @ COL STRIP BEAM OR WALL
S/4
SHALL BE SPACED 4/3 TIMES
THE MIDDLE STRIP
TB 2 3 2 3 2
1 : 50
2B1 200 400 16 1 10 1@50, 4@100, REST @250 O.C. TO C.L.
BB 2 2 2 2 2
TB 3 2 3
2B2 200 400 16 1 10 1@50, 4@100, REST @250 O.C. TO C.L. SCHEDULE OF SLAB REINFORCEMENT
BB 2 3 2
TB 3 3 3 THICK SHORT SPAN (BAR SPACING IN MM.) LONG SPAN (BAR SPACING IN MM.)
2B3 200 400 16 1 10 SLAB BAR
1@50, 4@100, REST @250 O.C. TO C.L. NESS TOP BARS DISCONT. BOTTOM BARS TOP BARS CONT. TOP BARS DISCONT. BOTTOM BARS TOP BARS CONT. REMARKS
BB 3 3 3 MARK ⌀
("t") (TBD) (BB) (TBC) (TBD) (BB) (TBC)
TB 3 3 2 3 3
RB1 200 400 16 1 10 1@50, 4@100, 7@175 REST @250 O.C. TO C.L. S1 100 10 200 200 200 200 ONE-WAY
BB 2 2 3 2 2
TB 2 2 2
RB2 200 400 16 1 10 1@50, 4@100, 7@175 REST @250 O.C. TO C.L. S2 100 10 250 225 150 250 250 200 TWO-WAY
BB 2 2 2
TB 3 3 2 3 3 CS1 100 10 200 200 200 ⌀10 @ 300 TEMP. BARS CANTILEVER
RB3 200 400 16 1 10 1@50, 4@100, 7@175 REST @250 O.C. TO C.L.
BB 2 2 4 2
3RD FLOOR
3RD FLOOR BEAM
300
OF VERT. BARS W/ 10 TIES @ 100 MM O.C. OF VERT. BARS W/ 10 TIES @ 100 MM O.C.
SPLICED NOT MORE THAN 50%
300
3000
"W"
300
200
2ND FLOOR
"L"
3000
1 : 50 1 : 50
SCHEDULE OF FOOTING SCHEDULE OF COLUMN
100mm THK. SLAB ON
FILL w/ 10mm Ø TEMP. SIZE
REQ'D REINFORCEMENTS VERT BARS TIES
FOOTING DIMENSIONS FOOTING BARS SPACED @ 300mm
FOOTING L W
EMBEDIMENT REMARKS GROUND FLOOR O.C.LINE.
FIN. FLR. B.W.LEVEL
MARK BOTTOM BARS
(m) 1 @ 0.05, 4 @ 0.10 rest
L (m) W (m) Thk (mm) C1 0.30 0.30 8-16 mm ⌀
BB along "L" BB along "W" N.G.L @ 0.15 m. O.C.
1100
FTB FTB
F2 0.95 0.95 300 1.00 5⌀12 5⌀12 3-10mm⌀ TRANS. BAR @ 0.30M O.C. PC 0.20 0.20 4-16 mm ⌀ 10 mm ⌀ @ 0.15 m. O.C.
400