0% found this document useful (0 votes)
86 views3 pages

ITP - Al Daayen Reservoir Patching & Plugging Works

This document provides an inspection and test plan for waterproofing injection works on a reservoir. It outlines the required documents, incoming material delivery process, and repair work activities to be inspected. Inspections will be conducted at various hold, witness, and review points to ensure the work meets specifications and does not have water leaks.

Uploaded by

Bleep News
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views3 pages

ITP - Al Daayen Reservoir Patching & Plugging Works

This document provides an inspection and test plan for waterproofing injection works on a reservoir. It outlines the required documents, incoming material delivery process, and repair work activities to be inspected. Inspections will be conducted at various hold, witness, and review points to ensure the work meets specifications and does not have water leaks.

Uploaded by

Bleep News
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

INSPECTION & TEST PLAN(ITP) – WATERPROOFING INJECTION WORKS

ITP Subject: Project: Project ID: Document Ref. No.: LP-UIV-ST-MSS-0002 Revision Number: 00
Inspection and Test Plan for Reservoir Design & Build Of External Works For Landscape, Irrigation Network, Car Parking & P-16-26-DB-02
Waterproofing – Patching and Plugging Services At Lusail (Al-Daayan Area)
Works

Inspection & Test Code


Item No: Inspection Test Activity Inspection/Test Method Reference Acceptance Criteria Frequency Of Responsible Person Verification Record (R,S,W,H)
Document Inspection/Testing
SC UIV AA 3RD Party

A REQUIRED DOCUMENTS & SUBMITTALS

Project Specifications,
Material Approval Request Technical Manager
A.1 Review of MAR QCS 2014 & PWA IAN 004 Approval from Consultant Prior to start of work activity Approve Material Submittal H H R
(MAR) & QA/QC Manager
Rev. 01
Project Specifications,
Approval of Method Review of submitted Method Construction Approved Method
A.2 QCS 2014 & PWA IAN 004 Approval from Consultant Prior to start of work activity H H R
Statement Statement Manager Statement
Rev. 01

Review of submitted HSE Project’s Health, Safety, & Compliance to HSE


A.3 HSE Control Systems Prior to start of work activity HSE Manager Approved HSE Documents H H R
Documents Environment Plan requirements

Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control, TPL-Third Part Laboratory
INSPECTION & TEST PLAN(ITP)
ITP Subject: Project: Design & Build Of External Works For Landscape, Irrigation Network, Car Parking & Project ID: Revision Number:
Inspection and Test Plan for Reservoir Services At Lusail (Al-Daayan Area) Document Ref. No.: LP-UIV-ST-MSS-0002 01
Waterproofing Injection Works P-16-26-DB-02

Inspection & Test Code


Reference Frequency Of Responsible (R,S,W,H)
Item No: Inspection Test Activity Inspection/Test Method Acceptance Criteria Verification Record
Document Inspection/Testing Person
SC UIV AA 3RD Party

B INCOMING MATERIAL DELIVERY

Approved Material Delivered materials conform to Store in Charge / Material Inspection Request
B.1 Material Inspection Visual Every Delivery H W W
Submittal approve MAR of Renderoc Plug. QC Engineer & Delivery Note

Materials must be stored as per


Approved Method manufacturer recommendation, in
B.2 Statement and Store in Charge / Request for Inspection H W W
Material Storage Visual it’s original packaging on a dry Every Delivery
Manufacturer’s QC Engineer
place and protected from direct
recommendation
sunlight

C REPAIR WORKS

- Surface preparation completed in


Approved Method Site Engineer / QC Request for Inspection &
C.1 Surface Preparation Visual compliance to the requirements of Each Area of Repair H H W
Statement Engineer Inspection Checklist
the approved method statement

- Patching and Plugging works


Approved Method successfully performed in
Application of Renderoc Statement and injection accordance to the requirements of Site Engineer / QC Request for Inspection &
C.2 Visual Each Area of Repair H H W
Plug materials manufacturer Engineer Inspection Checklist
recommendation. the approved method statement.
- No more sign of water leaks and
damped areas

Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control, TPL-Third Part Laboratory
INSPECTION & TEST PLAN(ITP)
PREPARED BY CHECKED BY APPROVED BY

NAME OKORIE PRIMUS NAME NAME HASAN ATMACA


HANI ABDELFATTAH ELREFAEY

SIGNATURE SIGNATURE SIGNATURE

POSITION QA/QC ENGINEER POSITION POSITION PROJECT MANAGER


QA/QC MANAGER

DATE 16/02/2021 DATE 16/02/2021 DATE 16/02/2021

Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control, TPL-Third Part Laboratory