ITP - Al Daayen Reservoir Patching & Plugging Works
ITP - Al Daayen Reservoir Patching & Plugging Works
ITP Subject: Project: Project ID: Document Ref. No.: LP-UIV-ST-MSS-0002 Revision Number: 00
Inspection and Test Plan for Reservoir Design & Build Of External Works For Landscape, Irrigation Network, Car Parking & P-16-26-DB-02
Waterproofing – Patching and Plugging Services At Lusail (Al-Daayan Area)
Works
Project Specifications,
Material Approval Request Technical Manager
A.1 Review of MAR QCS 2014 & PWA IAN 004 Approval from Consultant Prior to start of work activity Approve Material Submittal H H R
(MAR) & QA/QC Manager
Rev. 01
Project Specifications,
Approval of Method Review of submitted Method Construction Approved Method
A.2 QCS 2014 & PWA IAN 004 Approval from Consultant Prior to start of work activity H H R
Statement Statement Manager Statement
Rev. 01
Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control, TPL-Third Part Laboratory
INSPECTION & TEST PLAN(ITP)
ITP Subject: Project: Design & Build Of External Works For Landscape, Irrigation Network, Car Parking & Project ID: Revision Number:
Inspection and Test Plan for Reservoir Services At Lusail (Al-Daayan Area) Document Ref. No.: LP-UIV-ST-MSS-0002 01
Waterproofing Injection Works P-16-26-DB-02
Approved Material Delivered materials conform to Store in Charge / Material Inspection Request
B.1 Material Inspection Visual Every Delivery H W W
Submittal approve MAR of Renderoc Plug. QC Engineer & Delivery Note
C REPAIR WORKS
Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control, TPL-Third Part Laboratory
INSPECTION & TEST PLAN(ITP)
PREPARED BY CHECKED BY APPROVED BY
Legend: H-Hold Point W-Witness Point S-Surveillance R-Review Point PM - Project Manager CM - Construction Manager QC - Quality Control, TPL-Third Part Laboratory