Time Line

This Gantt chart outlines the timeline for a group project over 14 weeks. It includes milestones for submitting interim reports at 27%, 53%, and 73% completion. It also includes deadlines for evaluations of each interim report by supervisors and panels, submission of final reports at 87% completion, and final presentations during the last two weeks. Key deliverables and their deadlines are clearly outlined.

Uploaded by

Shazni Ahamed
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Time Line

This Gantt chart outlines the timeline for a group project over 14 weeks. It includes milestones for submitting interim reports at 27%, 53%, and 73% completion. It also includes deadlines for evaluations of each interim report by supervisors and panels, submission of final reports at 87% completion, and final presentations during the last two weeks. Key deliverables and their deadlines are clearly outlined.

Uploaded by

Shazni Ahamed
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ar

tr
sk
A1
n
beI
tin
uc
s,
3gst
lsiis
tio
or
ar
in
fr
ns
m
go
tin
cel
o
fr
pl
to
gl
m
o
ycel
wi
C4
cel
m
de
lth
.
llet
cel
A1
cel
CH4015: Gantt Chart Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14
I9
ls
e4
l
th
A8 TASK Task Completion START END M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F
thi
to
I7.
ro
an
sle
ug
d
ro
ar
h
A9 Group Report Submission
w.
n
BL
w
m
9.
he Base Case Design: Interim Report 1 27% Week 1 Week 4
or
ne
e. Detailed Design: Interim Report 2 53% Week 5 Week 8
ve
r HSE Assessment and Economic Feasibility: Interim Report 3 73% Week 9 Week 11
yo
u Final Report Submission 87% Week 12 Week 13
ne Prepare for final presentation and viva 100% Week 12 Week 13
ed
to. Evaluation
Interim Report 1 Evaluation by supervisor 15% Week 4 Week 4
Interim Report 1 Evaluation by Panel 1 25% Week 5 Week 5
Panel 1: Reviewer Comment Submission to Moodle by Monday of Week 6
Interim Report 2 Evaluation by supervisor 40% Week 8 Week 8
Interim Report 2 Evaluation by Panel 2 50% Week 9 Week 9
Panel 2: Reviewer Comment Submission to Moodle by Monday of Week 10
Interim Report 3 Evaluation by supervisor 65% Week 11 Week 11
Interim Report 3 Evaluation by Panel 3 75% Week 12 Week 12
Panel 3: Reviewer Comment Submission to Moodle by Monday of Week 13
Final Presentation and Viva 95% Week 14 Week 14
Check for Report Corrections by Module Cordinator 100% Week 14 Week 14
Compilation of final results Week 14

Team Work Interim Report Evaluation by the Panels

Interim report submissions to supervisor Panel Feedback Submission to Student Groups

Deadlines for report submissions Final Presentation and Viva

Interim Reports Evaluation by the Supervisor Final Check for Report Corrections