Budget of Work CSS G11 2020 2021
Budget of Work CSS G11 2020 2021
No. of Days
Quarter Learning Competencies from Curriculum Guide / TESDA TR
Taught
INSTALLING AND CONFIGURING COMPUTER SYSTEMS
LO 1. Assemble computer hardware
1.1 Plan unit assembly to ensure OHS policies and procedures are followed in accordance with systems requirements
1.2 Prepare unit assembly to ensure OHS policies and procedures are followed in accordance with systems requirements
1.3 Identify materials necessary to complete the work in accordance with established procedures and check against system requirements
1.4 Obtain materials necessary to complete the work in accordance with established procedures and check against system requirements 18
1.5 Obtain tools, equipment and testing devices needed to carry out installation work in accordance with established procedures and check
for correct operation and safety
1.6 Assemble computer hardware in accordance with established procedures and system requirements
Quarter 1 1.7 Perform BIOS configuration in accordance with hardware requirements
LO 2. Prepare installer
2.1 Create portable bootable devices in accordance with software manufacturer instruction
12
2.2 Prepare customized installers in accordance with software utilization guide and end user agreement
2.3 Carry out installation of portable applications in accordance with
LO 3. Install operating system and drivers for peripherals/ devices
9
3.1 Install Operating System (OS) in accordance with established installation procedures and to comply with end-user requirements
Quarterly Assessment 1
3.2 Install peripherals/ devices in accordance with manufacturer’s instructions and/ or OS installation procedures
3.3 Configure peripherals/ devices in accordance with manufacturer’s instructions and/ or OS installation procedures
3.4 Access OS and drivers updates/ patches in accordance with manufacturer’s recommendations and requirements 18
3.5 Install OS and drivers updates/ patches in accordance with manufacturer’s recommendations and requirements
3.6 Check the quality of the work undertaken in accordance with established procedures
LO 4. Install application software
Quarter 2
4.1 Install Application Software based on software installation guides, end-user requirements and software license agreement
4.2 Carry out variation to application software in accordance to customer/ client requirements 15
4.3 Access software updates in accordance with manufacturer’s recommendations and requirements
4.4 Install software updates in accordance with manufacturer’s recommendations
LO 5. Conduct testing and documentation
6
5.1 Test devices/ systems and/or installation to determine whether it conforms to requirements
5.2 Conduct stress test to ensure reliability of equipment in accordance with manufacturer’s instructions and system requirements
5.3 Follow 5S and 3Rs according to environmental policies
5.4 Follow procedures in forwarding documentation to appropriate personnel and/or authority on the test conducted.
Quarterly assessment 1
SETTING-UP COMPUTER NETWORKS
LO 1 Install network cables
1.1 Plan cable routes in accordance with network design and actual installation site
1.2 Determine cable routes in accordance with network design and actual installation site
1.3 Identify necessary network materials in accordance with established procedures and check against system requirements
1.4 Obtain necessary network materials in accordance with established procedures and check against system requirements
1.5 Obtain tools, equipment, and testing devices in accordance with established procedures
1.6 Check tools, equipment and testing devices in accordance with established procedures
30
1.7 Follow OHS policies
1.8 Use appropriate PPE
1.9 Perform copper cable splicing based on Electronic Industries Alliance / Telecommunications Industry Association (EIA/TIA) standards
Quarter 3 1.10 Install network cables and cable raceways in accordance with established procedures and installation requirements
1.11 Perform installation work and check for unnecessary damage that has occurred and complies with requirements
1.12 Follow OHS standards and 5S principles according to enterprise requirements
1.13 Dispose excess components and materials based on WEEE directives and 3Rs waste management program
LO 2: Set network configuration
2.1 Check network connectivity of each terminal in accordance with network design
2.2 Diagnose and repair any problem or fault in the network system in line with standard operating procedures
9
2.3 Configure Network Interface Card (NIC) in accordance with the network design
2.4 Carry out communication check between terminals in accordance with operating systems network configuration guides
2.5 Respond to unplanned events or conditions
Quarterly Assessment 1
LO 3: Set router/Wi-fi/wireless access point/repeater configuration
3.1 Configure client device systems settings in accordance with manufacturer’s instructions and end user preference
3.2 Configure LAN in accordance with manufacturer’s instructions and network design
30
3.3 Configure WAN in accordance with manufacturer’s instructions and network design
Quarter 4
3.4 Configure wireless settings in accordance with manufacturer’s instructions, network design, and end-user preferences
3.5 Configure security/firewall/advanced settings in accordance with manufacturers instruction and end-user preferences
LO 4: Inspect and test the configured computer networks
9
4.1 Undertake final inspection of the configuration to conform to the manufacturer’s instructions/manual
4.2 Ensure the configuration conforms to the manufacturer’s instructions/manual
4.3 Check computer networks to ensure safe operation
4.4 Prepare reports according to company requirements
4.5 Complete reports according to company requirements
Quarterly Assessment 1
160 days