Table: Shear Wall Pier Design Summary - ACI 318-14, Part 1 of 5
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 1 of 5
Story Pier Label Station Design Type Edge Rebar End Rebar Rebar Required Current
Spacing Reinf. Reinf.
Percentage Percentage
Unitless Unitless Unitless Unitless Unitless Unitless cm % %
CUBIERTA P1 Top Uniform #3 #3 25 0.25 0.34
CUBIERTA P1 Bottom Uniform #3 #3 25 0.25 0.34
SEGUNDO P1 Top Uniform #3 #3 25 0.25 0.34
SEGUNDO P1 Bottom Uniform #3 #3 25 0.25 0.34
PRIMERO P1 Top Uniform #3 #3 25 0.25 0.22
PRIMERO P1 Bottom Uniform #3 #3 25 0.25 0.22
VC P1 Top Uniform #3 #3 25 0.25 0.22
VC P1 Bottom Uniform #3 #3 25 0.25 0.22
SEGUNDO P2 Top Uniform #3 #3 25 0.82 0.37
SEGUNDO P2 Bottom Uniform #3 #3 25 0.75 0.37
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 2 of 5
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 2 of 5
Story Pier Label Station Pier Leg Leg X1 Leg Y1 Leg X2 Leg Y2 Length
Unitless Unitless Unitless Unitless cm cm cm cm cm
CUBIERTA P1 Top Top Leg 1 344.672 2679.983 471.351 2679.983 126.68
CUBIERTA P1 Bottom Bottom Leg 1 344.672 2679.983 471.351 2679.983 126.68
SEGUNDO P1 Top Top Leg 1 344.672 2679.983 471.351 2679.983 126.68
SEGUNDO P1 Bottom Bottom Leg 1 344.672 2679.983 471.351 2679.983 126.68
PRIMERO P1 Top Top Leg 1 344.672 2679.983 471.351 2679.983 126.68
PRIMERO P1 Bottom Bottom Leg 1 344.672 2679.983 471.351 2679.983 126.68
VC P1 Top Top Leg 1 344.672 2679.983 471.351 2679.983 126.68
VC P1 Bottom Bottom Leg 1 344.672 2679.983 471.351 2679.983 126.68
SEGUNDO P2 Top Top Leg 1 866.343 3503.483 1001.39 3503.483 135.048
SEGUNDO P2 Bottom Bottom Leg 1 866.343 3503.483 1001.39 3503.483 135.048
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 3 of 5
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 3 of 5
Story Pier Label Station Thickness Shear Rebar Compressiv Compressiv Compressiv Compressiv
e Stress Left e Stress e Stress e Stress
Right Limit Left Limit Right
Unitless Unitless Unitless cm cm²/cm tonf/cm² tonf/cm² tonf/cm² tonf/cm²
CUBIERTA P1 Top 20 0.05 0.002 0.005 0.042 0.042
CUBIERTA P1 Bottom 20 0.05 0.0001969 0.005 0.042 0.042
SEGUNDO P1 Top 20 0.05 0.001 0.016 0.042 0.042
SEGUNDO P1 Bottom 20 0.05 0.035 0.034 0.042 0.042
PRIMERO P1 Top 30 0.075 0.001 0.01 0.056 0.056
PRIMERO P1 Bottom 30 0.075 0.005 0.005 0.056 0.056
VC P1 Top 30 0.075 0.005 0.005 0.056 0.056
VC P1 Bottom 30 0.075 0.004 0.006 0.056 0.056
SEGUNDO P2 Top 20 0.05 0.009 0.001 0.042 0.042
SEGUNDO P2 Bottom 20 0.05 0.034 0.034 0.042 0.042
UVO Page 1 of 2
CASA LA HERRETÍA BLOQUE 2 ETABS v19.1.0
13 julio 2021
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 4 of 5
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 4 of 5
Story Pier Label Station C Depth Left C Limit Left C Depth C Limit Right Boundary Boundary
Right Zone Left Zone Right
Unitless Unitless Unitless cm cm cm cm cm cm
CUBIERTA P1 Top
CUBIERTA P1 Bottom
SEGUNDO P1 Top
SEGUNDO P1 Bottom 15.253 28.151 15.253 28.151 7.626 7.626
PRIMERO P1 Top
PRIMERO P1 Bottom
VC P1 Top
VC P1 Bottom
SEGUNDO P2 Top
SEGUNDO P2 Bottom 11.568 30.011 11.568 30.011 5.784 5.784
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 5 of 5
Table: Shear Wall Pier Design Summary - ACI 318-14, Part 5 of 5
Story Pier Label Station Warnings Errors
Unitless Unitless Unitless Unitless Unitless
CUBIERTA P1 Top No Message No Message
CUBIERTA P1 Bottom No Message No Message
SEGUNDO P1 Top No Message No Message
SEGUNDO P1 Bottom No Message No Message
PRIMERO P1 Top No Message No Message
PRIMERO P1 Bottom No Message No Message
VC P1 Top No Message No Message
VC P1 Bottom No Message No Message
SEGUNDO P2 Top No Message No Message
SEGUNDO P2 Bottom No Message No Message