1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3
13.6 RCC works for Eight,Nine and Top floor 14 2078-04-16 2078-04-30
14 Bamboo scaffolding 91 2078-01-26 2078-04-27
15 Brickwork (internal,external)
Brickworks for Lower basement &
15.1 Upper Basement 7 2078-01-26 2078-02-02
15.2 Brickworks for Ground & First floor 14 2078-02-03 2078-02-17
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)
Brickworks for Second & Third floor
15.3 slab 14 2078-02-18 2078-03-04
15.4 Brick works for Fourth & Fifth floor 14 2078-03-05 2078-03-19
15.5 Brickworks for Sixth & Seventh floor 14 2078-03-20 2078-04-03
20.2 Painting
Painting work
work for
for Ground & Third
Second & First floor
floor 14 2078-05-11 2078-05-25
20.3 slab 14 2078-05-18 2078-06-01
20.4 Painting workfor Fourth & Fifth floor 14 2078-05-25 2078-06-08
20.5 Painting work for Sixth & Seventh floor 14 2078-06-01 2078-06-15
Painting work for Eight,Nine and Top
20.6 floor 7 2078-06-08 2078-06-15
Fascade treatment works of building
21.1 Commencement
elevations of Mechanical, Fire 28 2078-05-20 2078-06-17
Proctection, Electrical &
Plumbing/Sanitary (MEP) works-other
than fittings and fixtures-Mall &
21.2 Threater area
PROJECT NAME
LOCATION
Duration 2078
Asa Shr Bha Aso Kar
Sno. Description of works Months
I. Civil Works
IV. Interior/Exterior
DATE
PAGE
PROJECT NAME
LOCATION
Sno. Description 20
work Months
volume duration Asa Shr
CLIENT NAME
PROJECT MANAGER
2078 2079
Bha Aso Kar Man Pus Mag Fal Chai Bai Jes Asa Shr Bha Aso Kar Man Pus Mag
DATE
PAGE
2080
2078/2/25
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)
13.6 RCC works for Eight,Nine and Top floor 14 2078-04-16 2078-04-30
14 Bamboo scaffolding 91 2078-01-26 2078-04-27
15 Brickwork (internal,external)
Brickworks for Lower basement &
15.1 Upper Basement 7 2078-01-26 2078-02-02
15.2 Brickworks for Ground & First floor 14 2078-02-03 2078-02-17
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)
Brickworks for Second & Third floor
15.3 slab 14 2078-02-10 2078-02-24
15.4 Brick works for Fourth & Fifth floor 14 2078-02-17 2078-03-03
15.5 Brickworks for Sixth & Seventh floor 14 2078-02-24 2078-03-10
20.2 Painting
Painting work
work for
for Ground & Third
Second & First floor
floor 14 2078-03-26 2078-04-09
20.3 slab 14 2078-04-02 2078-04-16
20.4 Painting workfor Fourth & Fifth floor 14 2078-04-09 2078-04-23
20.5 Painting work for Sixth & Seventh floor 14 2078-04-16 2078-04-30
Painting work for Eight,Nine and Top
20.6 floor 7 2078-04-23 2078-04-30
Fascade treatment works of building
21.1 Commencement
elevations of Mechanical, Fire 28 2078-04-03 2078-05-01
Proctection, Electrical &
Plumbing/Sanitary (MEP) works-other
than fittings and fixtures-Mall &
21.2 Threater area