Edited 3 CBC Shedule

Uploaded by

Ritesh Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

Duration

S.N. Description Of Works 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078


(Week )

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3

1 Site clearance and Protection works. 1


Hole drilling for piling
2 3
3 Concrete Piling works 4
4 Anchoring of protection piles 4
5 Micropiling work. 4
6 Earthwork in Excavation(part 1) 3
7 Earthwork in Excavation(part 2)
Stone soling in Elevator Pits and Mat
8 Foundation works 1
PCC in Elevator Pits and Mat Foundation
9 works 1
Rebar scheduling and preparation of
10 detailings for Mat 2
Laying of Rebar and shuttering for Mat
11 foundation 2
Concreting of Mat foundation and rebar
12 details fo column 1
13 RCC work
RCC works for Lower basement slab &
13.1 Upper Basement 4
13.2 RCC works for Ground & First floor 3
13.3 RCC works for Second & Third floor 3
13.4 RCC works for Fourth & Fifth floor 3
13.5 RCC works for Sixth & Seventh floor 3

13.6 RCC works for Eight,Nine and Top floor 2


14 Scaffolding 13
15 Brickwork (internal,external)
Brickworks for Lower basement &
15.1 Upper Basement 1
Duration
S.N. Description Of Works 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Week )

15.2 Brickworks for Ground


Brickworks for Second && Third
First floor
floorslab 2
15.3 slab 2
15.4 Brick works for Fourth & Fifth floor 2
15.5 Brickworks for Sixth & Seventh floor 2

15.6 Brickworks for Eight,Nine and Top floor 1


14 Waterproffing (internal,external)
Waterproffing for Lower basement slab
14.1 & Upper Basement slab 3
Waterproffing for Ground & First floor
14.2 Waterproffing
slab for Second & Third floor 1
14.3 slab 1
Waterproffing for Fourth & Fifth floor
14.4 slab 1
Waterproffing for Sixth & Seventh floor
14.5 slab 1
Waterproffingfor Eight,Nine and Top
14.6 floor slab 1
16 Plasterwork (internal,external)
Plasterwork for Lower basement &
16.1 Upper Basement 1
16.2 Plasterwork for
Plasterwork for Ground
Second && Third
First floor
floor 2
16.3 slab 2
16.4 Plasterwork for Fourth & Fifth floor 2
16.5 Plasterwork for Sixth & Seventh floor 2

16.6 Plasterwork for Eight,Nine and Top floor 1


17 Glass measurement 1
18 Flooring(Tile, Marble & Granite)
Flooring for Lower basement & Upper
18.1 Basement 1
Duration
S.N. Description Of Works 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Week )

18.2 Flooring for Ground & First floor 2


18.3 Flooring for Second & Third floor 2
18.4 Flooring for Fourth & Fifth floor 2
18.5 Flooring for Sixth & Seventh floor 2
18.6 Flooring for Eight,Nine and Top floor 1
19 Glass fitting 4
20 Painting (internal,external)
Painting work for Lower basement &
20.1 Upper Basement 1

20.2 Painting work for


Painting work for Ground & Third
Second & First floor
floor 2
20.3 slab 2
20.4 Painting workfor Fourth & Fifth floor 2

20.5 Painting work for Sixth & Seventh floor 2


Painting work for Eight,Nine and Top
20.6 floor 1
21 Bamboo scaffolding 4
Fascade treatment works of building
21.1 Commencement
elevations of Mechanical, Fire 4
Proctection, Electrical &
Plumbing/Sanitary (MEP) works-other
than fittings and fixtures-Mall &
21.2 Threater area

21.3 Lower basement & Upper Basement 2


21.4 Ground & First floor 2
21.5 Second & Third floor 2
21.6 Fourth & Fifth floor 2
21.7 Sixth & Seventh floor 2
21.8 Eight,Nine and Top floor 2
Duration
S.N. Description Of Works 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Week )

Commencement of Project advertisement


22 ans booking opening management 8
23 Landscaping / Design 3
24 Preparation of project handover 2
25 Grand opening of Project 2
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)

259 2077-10-01 2078-06-17 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3


1 Site clearance and Protection works. 7 2077-10-01 2077-10-08
Hole drilling for piling
2 21 2077-10-09 2077-10-30
3 Concrete Piling works 28 2077-10-09 2077-11-06
4 Anchoring of protection piles 28 2077-10-16 2077-11-13
5 Micropiling work. 28 2077-10-16 2077-11-13
6 Earthwork in Excavation(part 1) 21 2077-11-06 2077-11-27
Stone soling in Elevator Pits and Mat
8 Foundation works 7 2077-11-28 2077-12-05
PCC in Elevator Pits and Mat Foundation
9 works 7 2077-11-28 2077-12-05
Rebar scheduling and preparation of
10 detailings for Mat,Column 14 2077-11-28 2077-12-12
Laying of Rebar and shuttering for Mat
11 foundation 14 2077-12-05 2077-12-19
Concreting of Mat foundation and rebar
12 details for column 7 2077-12-20 2077-12-27
13 RCC work
RCC works for Lower basement &
13.1 Upper Basement 28 2077-12-28 2078-01-25
13.2 RCC works for Ground & First floor 21 2078-01-26 2078-02-16
13.3 RCC works for Second & Third floor 21 2078-02-17 2078-03-10
13.4 RCC works for Fourth & Fifth floor 21 2078-03-11 2078-04-01
13.5 RCC works for Sixth & Seventh floor 21 2078-04-02 2078-04-23

13.6 RCC works for Eight,Nine and Top floor 14 2078-04-16 2078-04-30
14 Bamboo scaffolding 91 2078-01-26 2078-04-27
15 Brickwork (internal,external)
Brickworks for Lower basement &
15.1 Upper Basement 7 2078-01-26 2078-02-02
15.2 Brickworks for Ground & First floor 14 2078-02-03 2078-02-17
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)
Brickworks for Second & Third floor
15.3 slab 14 2078-02-18 2078-03-04
15.4 Brick works for Fourth & Fifth floor 14 2078-03-05 2078-03-19
15.5 Brickworks for Sixth & Seventh floor 14 2078-03-20 2078-04-03

15.6 Brickworks for Eight,Nine and Top floor 7 2078-03-27 2078-04-03


14 Waterproffing (internal,external)
Waterproffing for Lower basement slab
14.1 & Upper Basement slab 3
Waterproffing for Ground & First floor
14.2 slab
Waterproffing for Second & Third floor 1
14.3 slab 1
Waterproffing for Fourth & Fifth floor
14.4 slab 1
Waterproffing for Sixth & Seventh floor
14.5 slab 1
Waterproffingfor Eight,Nine and Top
14.6 floor slab 1
16 Plasterwork (internal,external)
Plasterwork for Lower basement &
16.1 Upper Basement 7 2078-03-05 2078-03-12
16.2 Plasterwork
Plasterwork for
for Ground
Second && Third
First floor
floor 14 2078-03-13 2078-03-27
16.3 slab 14 2078-03-28 2078-04-11
16.4 Plasterwork for Fourth & Fifth floor 14 2078-04-12 2078-04-26
16.5 Plasterwork for Sixth & Seventh floor 14 2078-04-27 2078-05-11

16.6 Plasterwork for Eight,Nine and Top floor 7 2078-05-04 2078-05-11


17 Glass measurement 7 2078-05-12 2078-05-19
18 Flooring(Tile, Marble & Granite)
Flooring for Lower basement & Upper
18.1 Basement 7 2078-04-12 2078-04-19
18.2 Flooring for Ground & First floor 14 2078-04-12 2078-04-26
18.3 Flooring for Second & Third floor 14 2078-04-19 2078-05-03
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)

18.4 Flooring for Fourth & Fifth floor 14 2078-04-26 2078-05-10


18.5 Flooring for Sixth & Seventh floor 14 2078-05-03 2078-05-17
18.6 Flooring for Eight,Nine and Top floor 7 2078-05-10 2078-05-17
19 Glass fitting 28 2078-05-10 2078-06-07
20 Painting (internal,external)
Painting work for Lower basement &
20.1 Upper Basement 7 2078-05-11 2078-05-18

20.2 Painting
Painting work
work for
for Ground & Third
Second & First floor
floor 14 2078-05-11 2078-05-25
20.3 slab 14 2078-05-18 2078-06-01
20.4 Painting workfor Fourth & Fifth floor 14 2078-05-25 2078-06-08

20.5 Painting work for Sixth & Seventh floor 14 2078-06-01 2078-06-15
Painting work for Eight,Nine and Top
20.6 floor 7 2078-06-08 2078-06-15
Fascade treatment works of building
21.1 Commencement
elevations of Mechanical, Fire 28 2078-05-20 2078-06-17
Proctection, Electrical &
Plumbing/Sanitary (MEP) works-other
than fittings and fixtures-Mall &
21.2 Threater area

21.3 Lower basement & Upper Basement 14 2078-01-26 2078-02-09


21.4 Ground & First floor 14 2078-02-02 2078-02-16
21.5 Second & Third floor 14 2078-02-09 2078-02-23
21.6 Fourth & Fifth floor 14 2078-02-16 2078-03-02
21.7 Sixth & Seventh floor 14 2078-02-23 2078-03-09
21.8 Eight,Nine and Top floor 14 2078-03-02 2078-03-16

Commencement of Project advertisement


22 ans booking opening management 56 2078-02-23 2078-04-20
23 Landscaping / Design 21 2078-02-19 2078-03-12
24 Preparation of project handover 14 2078-04-21 2078-05-05
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)

25 Grand opening of Project 14 2078-05-06 2078-05-20


###
PROJECT SCHE

PROJECT NAME

LOCATION

Duration 2078
Asa Shr Bha Aso Kar
Sno. Description of works Months

I. Civil Works

1 RCC work for Column Including rebar and formwork 8


2 RCC work for Beam and Slab including rebar and formwork 8
3 Brickwork (internal,external) 7
4 Plasterwork (internal,external) 4
5 Wood Door and UPVC Window Framing work 6
6 Flooring work(Tile, Marble & Granite) 5
7 Stainless steel work for railling in staircase 1
8 water proofing work 3
9 Swimming pool mechanical and Filtration work 1

II. MEP Activities

Electrical Activities ( Marking wall for chasing ,installation of


conduits DB and MDB , Installation of cable trays and
trunking ,wiring for lighting and power , cable laying and testing
1 etc all complete as per requirement ) 6

Plumbing activiites (marking in wall and chasing , Installation of


draininage pipes, hot and cold water supply pipes etc all
2 complete as per requirement) 7

Fire fighting activities ( Installation of Fire fighting pipes along


with all necessary acessories etc all complete as per
3 requirement ) 5

Final fixation on MEP activities ( Installation of light fixtures ,


switch boards , Grills and diffusers for HVAC, Toilet fixtures , fire
fighting sprinkles and all other finishing works etc all complete
4 as per requirements ) 4

III. HVAC Activities


Heating Ventilation and Air Conditioning (HVAC) Installation
( Installation and insulation of supply and return ductwork as
well as chilled water piping work along with FSU Installations
1 and connections etc all complete as per requirement ) 4

IV. Interior/Exterior

1 Painting work (internal,external) 4


2 Door and window shutter work 4
3 Building Expansion Joint works 1
4 False Celling Work 5
5 ACP work 1
6 Exterior Design work 3
7 Exterior fascade glass railing work as per design 2
8 WPC board as per requirement 1
9 Escalator and lift installation inside the building 3
10 Front entrance area landscape 3
11 Boundary wall construction 3
12 Backfilling works around the building 1
Advertisment notice release for the rental shop Booking on the
13 mall 1
14 Completion of the rental shop complete installations 7
15 Interior works in Hotel area 8
16 Prepration of Project Handover 1
PROJECT SCHEDULE-Chitwan Building Complex

DATE

PAGE

2078 2079 2080


Man Pus Mag Fal Chai Bai Jes Asa Shr Bha Aso Kar Man Pus Mag Fal Chai Bai
PROJECT SCHEDULE-Chitwan Building Complex

PROJECT NAME

LOCATION

Sno. Description 20

work Months
volume duration Asa Shr

1 Civil Works 40% 11


2 MEP activities 20% 9
3 HVAC activities 10% 4
4 Interior/Exterior 30% 14
Building Complex

CLIENT NAME

PROJECT MANAGER

2078 2079

Bha Aso Kar Man Pus Mag Fal Chai Bai Jes Asa Shr Bha Aso Kar Man Pus Mag
DATE

PAGE

2080

Fal Chai Bai


x

2078/2/25
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)

261 2077-10-01 2078-06-19 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3


1 Site clearance and Protection works. 7 2077-10-01 2077-10-08
Hole drilling for pilling
2 21 2077-10-09 2077-10-30
3 Concrete Piling works 28 2077-10-09 2077-11-06
4 Anchoring of protection piles 28 2077-10-16 2077-11-13
5 Micropiling work 28 2077-10-16 2077-11-13
6 Earthwork in Excavation 21 2077-11-06 2077-11-27
Stone soling in Elevator Pits and Mat
8 Foundation works 7 2077-11-28 2077-12-05
PCC in Elevator Pits and Mat Foundation
9 works 7 2077-11-28 2077-12-05
Rebar scheduling and preparation of
10 detailings for Mat,Column 14 2077-11-28 2077-12-12
Laying of Rebar and shuttring for Mat
11 foundation 14 2077-12-05 2077-12-19
Concreting of Mat foundation and rebar
12 details for column 7 2077-12-20 2077-12-27
13 RCC work
RCC works for Lower basement &
13.1 Upper Basement 28 2077-12-28 2078-01-25
13.2 RCC works for First & Second floor 21 2078-01-26 2078-02-16
13.3 RCC works for Second & Third floor 21 2078-02-17 2078-03-10
13.4 RCC works for Fourth & Fifth floor 21 2078-03-11 2078-04-01
13.5 RCC works for Sixth & Seventh floor 21 2078-04-02 2078-04-23

13.6 RCC works for Eight,Nine and Top floor 14 2078-04-16 2078-04-30
14 Bamboo scaffolding 91 2078-01-26 2078-04-27
15 Brickwork (internal,external)
Brickworks for Lower basement &
15.1 Upper Basement 7 2078-01-26 2078-02-02
15.2 Brickworks for Ground & First floor 14 2078-02-03 2078-02-17
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)
Brickworks for Second & Third floor
15.3 slab 14 2078-02-10 2078-02-24
15.4 Brick works for Fourth & Fifth floor 14 2078-02-17 2078-03-03
15.5 Brickworks for Sixth & Seventh floor 14 2078-02-24 2078-03-10

15.6 Brickworks for Eight,Nine and Top floor 7 2078-03-03 2078-03-10


14 Waterproffing (internal,external)
Waterproffing for Lower basement slab
14.1 & Upper Basement slab 21 1900-01-20
Waterproffing for Ground & First floor
14.2 slab
Waterproffing for Second & Third floor 7 1900-01-06
14.3 slab 7 1900-01-06
Waterproffing for Fourth & Fifth floor
14.4 slab 7 1900-01-06
Waterproffing for Sixth & Seventh floor
14.5 slab 7 1900-01-06
Waterproffingfor Eight,Nine and Top
14.6 floor slab 7 1900-01-06
16 Plasterwork (internal,external)
Plasterwork for Lower basement &
16.1 Upper Basement 7 2078-02-18 2078-02-25
16.2 Plasterwork
Plasterwork for
for Ground
Second && Third
First floor
floor 14 2078-02-18 2078-03-04
16.3 slab 14 2078-02-25 2078-03-11
16.4 Plasterwork for Fourth & Fifth floor 14 2078-03-04 2078-03-18
16.5 Plasterwork for Sixth & Seventh floor 14 2078-03-11 2078-03-25

16.6 Plasterwork for Eight,Nine and Top floor 7 2078-03-18 2078-03-25


17 Glass measurement 7 2078-03-26 2078-04-02
18 Flooring(Tile, Marble & Granite)
Flooring for Lower basement & Upper
18.1 Basement 7 2078-03-05 2078-03-12
18.2 Flooring for Ground & First floor 14 2078-03-12 2078-03-26
18.3 Flooring for Second & Third floor 14 2078-03-19 2078-04-02
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)

18.4 Flooring for Fourth & Fifth floor 14 2078-03-26 2078-04-09


18.5 Flooring for Sixth & Seventh floor 14 2078-04-02 2078-04-16
18.6 Flooring for Eight,Nine and Top floor 7 2078-04-09 2078-04-16
19 Glass fitting 28 2078-03-26 2078-04-23
20 Painting (internal,external)
Painting work for Lower basement &
20.1 Upper Basement 7 2078-03-18 2078-03-25

20.2 Painting
Painting work
work for
for Ground & Third
Second & First floor
floor 14 2078-03-26 2078-04-09
20.3 slab 14 2078-04-02 2078-04-16
20.4 Painting workfor Fourth & Fifth floor 14 2078-04-09 2078-04-23

20.5 Painting work for Sixth & Seventh floor 14 2078-04-16 2078-04-30
Painting work for Eight,Nine and Top
20.6 floor 7 2078-04-23 2078-04-30
Fascade treatment works of building
21.1 Commencement
elevations of Mechanical, Fire 28 2078-04-03 2078-05-01
Proctection, Electrical &
Plumbing/Sanitary (MEP) works-other
than fittings and fixtures-Mall &
21.2 Threater area

21.3 Lower basement & Upper Basement 14 2078-02-26 2078-03-12


21.4 Ground & First floor 14 2078-03-05 2078-03-19
21.5 Second & Third floor 14 2078-03-12 2078-03-26
21.6 Fourth & Fifth floor 14 2078-03-19 2078-04-02
21.7 Sixth & Seventh floor 14 2078-03-26 2078-04-09
21.8 Eight,Nine and Top floor 14 2078-04-02 2078-04-16

Commencement of Project advertisement


22 ans booking opening management 56 2078-03-25 2078-05-20
23 Landscaping / Design 21 2078-03-11 2078-04-01
24 Preparation of project handover 14 2078-05-21 2078-06-04
Duration
S.N. Description Of Works START DATE END DATE 1/10/2077 1/11/2077 1/12/2077 1/1/2078 1/2/2078
(Days)

25 Grand opening of Project 14 2078-06-05 2078-06-19