PID NGOMA+Layout Option 1 & 2-WTP - PRINCIPAL OPTION 2

The document describes a water treatment principal with two independent lines that can each treat 6,000 m3 of water per day. The principal involves raw water intake and pumping, aeration, coagulation/flocculation/clarification, sand filtration, a contact reservoir, and distribution reservoirs and pumping. Key components and specifications are listed for each stage of the water treatment process.

Uploaded by

manzi gratien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

PID NGOMA+Layout Option 1 & 2-WTP - PRINCIPAL OPTION 2

The document describes a water treatment principal with two independent lines that can each treat 6,000 m3 of water per day. The principal involves raw water intake and pumping, aeration, coagulation/flocculation/clarification, sand filtration, a contact reservoir, and distribution reservoirs and pumping. Key components and specifications are listed for each stage of the water treatment process.

Uploaded by

manzi gratien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WATER TREATMENT PRINCIPAL

2 INDEPENDANT LIGNES
2 X 6,000 m3/day
OPTION 2

RAW WATER INTAKE RAW WATER RESRVOIR AERATORS CASCADE COAGULATION - FLOCCULATION - CLARIFICATION SAND FILTRATION CONTACT RESERVOIR DISTRIBUTION
+ PUMPING STATION 1,500 m3 RESERVOIRS
PUMPING STATION

PUMPS QTY :1 QTY: 2 QTY: 2 QTY: 2 QTY: 2 QTY: 4


QTY : 2+1 V : 100 m3 Steps : 4 Rt: 68,7 s Rt: 27,5 mn Settling charge: 6.5 m/h S = 28 m2
F: 1200 m3/h Rt : 10 min Hignt : 20 cm V : 6 m3 V : 144 m3 V Hazen: 0.65 m/h V = 5.55 m/h
H: 202 m Oxidation G : 700 s-1 G : 50 s-1 V: 245 m3
Prechlorination Coagulant Flocculant Hydraulic load on weir: 6.67m3/h/m
PAC

KECC Modifications
Scale: JOINT VENTURE
REPUBLIC OF RWANDA FEASIBILITY STUDY, DETAILED DESIGNS AND Address: 21, Sangil-ro 6-gil, Gangdong-gu, Seoul, FEASIBILITY DESIGN Without
Republic of Korea https://www.kecc.co.kr
Done by: - Visa Date Description WATER TREATMENT
E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\image007.jpg
SUPERVISION OF WORKS FOR THE Contact: TEL. +82-2-2049-2802 FAX. +82-2-2049-5093
Dessin No.:
E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\KECC.png

E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\escudo-de-ruanda.png

Holistic Controled by: - PRINCIPAL


Water and Sanitation Corporation (WASAC) CONSTRUCTION OF NGOMA RIVER WATER Kimironko Road, KG 11 Av.81, Triumph House – 1st
Floor, P.O. BOX: 5825 Kigali-Rwanda
Approuved by: - OPTION 2 E:\Muhazi doc\Travail MUHAZI\Images\WTP Feasibility Study Report_MUHAZI-_fichiers\HOLISTIC.jpg

SUPPLY SYSTEM (PHASE 1) Tel :( +250)788851713 • website: hccafrica.com Checked by: DATE: 12/2020
PAGE 1 sur 1