05-July-2021 Shift A Logbook Operator Pakse

The document is a shift handover logbook for Pakse Substation documenting the 08:00-16:00 shift on 05-Jul-21. It records the energization status of transmission lines, daily maintenance activities, equipment readings, and issues including air conditioning and monitoring equipment faults. Key handover points included observing transmission line status and issues to address.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views1 page

05-July-2021 Shift A Logbook Operator Pakse

The document is a shift handover logbook for Pakse Substation documenting the 08:00-16:00 shift on 05-Jul-21. It records the energization status of transmission lines, daily maintenance activities, equipment readings, and issues including air conditioning and monitoring equipment faults. Key handover points included observing transmission line status and issues to address.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Operation Dept.

PSE SHIFT HANDOVER LOGBOOK


Doc No. KLIC-OPE-LGB02-01
Date: 05-Jul-21 Record time 08:00 - 16:00
Shift: A Name: Mr. Sengsouvanh
PSE-XPXN Status MW MVar PSE-XPXN Status MW MVar
Line 1 Energize De-Energize -149.93 19.80 Line 2 Energize De-Energize -149.80 19.48
PSE-UB3 Status MW MVar PSE-UB3 Status MW MVar
Line 1 Energize De-Energize 150.07 -19.48 Line 2 Energize De-Energize 149.70 -19.33
Shunt Reactor 1 Energize De-Energize Shunt Reactor 2 Energize De-Energize

CB 80112 CB 80122 CB 80132 CB 80312


Close Open Close Open Close Open Close Open

CB 80212 CB 80222 CB 80232 FUSE 603


Close Open Close Open Close Open Close Open

Service Voltage (kV) Current (A)


KW1A TR 21.4 0.6

Record Time Note


I. Transmission Line Status
08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.1
08:00-16:00 Pakse Substation Energization Pakse-XPXN Line No.2
08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.1
08:00-16:00 Pakse Substation Energization Pakse-UB3 Line No.2
II. Daily Activities
08:00 Receiving and Sending information to power house (call)
11:30 DCMS, Equipment Room, Switch yard Check (No problem)
15:00 DCMS, Equipment Room Check (No problem)
230kV Main Bus 1 230kV Main Bus 2
𝑈𝑎𝑏 = 234.3 kV 𝑈𝑎𝑏 = 234.3 kV
𝑈𝑏𝑐 = 235.8 kV 𝑈𝑏𝑐 = 235.1 kV
𝑈𝑐𝑎 = 234.1 kV 𝑈𝑐𝑎 = 233.4 kV
F = 50.0 Hz F = 50.0 Hz

III. Switching Order Activities


Don't have
IV. Fault and Alarm Event Log
08:00-16:00 1.Air chiller in control room building does not work
08:00-16:00 2. Silica gel colors of SR2 was abnormal
08:00-16:00 3.The value of SR1 oil temperture BT2 was incorrect
08:00-16:00 4.The master station panel PAS1 has shown the current state is running with problems
08:00-16:00 5.The F-531 device of SR1&SR2 was errored
V. Special Activities
Don't have
VI. Work Permit Activivties
Don't have
VII. Issue Trouble Memo
Don't have
VIII. Handover Activities
Observe Transmission line No. 1&2
Observe DCMS

Management Notification

Incomming Shift Signature: ……………………………… Out Going Shift Signature: ………………………………….


(Chanthachone) (Sengsouvanh)
Pakse Sub Operation Supervisor Signature: ………………………………
(Chanthachone)