ATD AOH Contractor

The document is a schedule form for the annual overhead maintenance of an automatic tensioning device (ATD). It lists 16 items to check including the condition of wires, insulators, pulleys, and counterweights. Measurements for X and Y values must be recorded and checked against charts. Cleaning and lubrication tasks are also included. The form requires signatures from contractor and railway representatives to verify completion.

Uploaded by

chandug55
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views1 page

ATD AOH Contractor

The document is a schedule form for the annual overhead maintenance of an automatic tensioning device (ATD). It lists 16 items to check including the condition of wires, insulators, pulleys, and counterweights. Measurements for X and Y values must be recorded and checked against charts. Cleaning and lubrication tasks are also included. The form requires signatures from contractor and railway representatives to verify completion.

Uploaded by

chandug55
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

South Central Railway

Schedule form for AOH of ATD

Location: Section: Date of maintenance: AOH number:


Type of ATD: HTL: Mast Implantation: Mast Type:

1. Check the following:


a) Condition of Contact wire ending cone :
b) Make/Year of mfg of Contact wire ending cone :
c) Condition of Catenary wire ending cone :
d) Make/Year of mfg of Catenary wire ending cone :
e) Condition of compensating plate (Vertical/Tilted) :
f) Condition of 9-ton insulator :
g) Make/Year of mfg of 9-ton insulator :
h) Condition of 9-ton adjuster :
i) Rubbing of SS wire rope with pulley :
j) Alignment of wire rope with pulley :
k) Condition of Anti-falling rods check nuts and split pins :
l) Anti-falling rod angle :
m) Condition of clevis for any cracks :
n) Condition of SS wire rope :
o) Make/Year of mfg of SS wire rope :
p) Free movement of regulating Equipment :
q) Condition of guide tube :
r) Condition of eye of base counter weights :
s) Counter weight for any cracks :
2. Check for the availability and provide if absent
a) Base counter weight split pin :
b) 9-ton adjuster split pins :
c) Anti-falling rods check nuts and split pins :
d) Double strap split pins :
e) Bolts and nuts on guide tubes at top & bottom :
f) Other bolts nuts and split pins :
3. Check the fixing of SS rope end and secure if required :
4. Check the tightness of
a) Guy rod :
b) Check-nut of 9-ton adjuster :
c) Check-nuts of anti-falling rods :
d) Top & bottom fittings of guide tube :
5. Measure and record
a) Ambient temperature at the time of maintenance :
b) “X” value in cms :
c) “Y” value in cms :
d) Length of sleeves of anti-falling rods :
6. As per the chart at above temperature
a) “X” value in cms :
b) “Y” value in cms :
7. Clean the following
a) Mast muffing :
b) Guy rod muffing :
c) 9 ton insulator :
d) Counter weights :
8. Is SS rope lubricated with Balmerol lube :
9. Ensure Y- max and min and at 35°c,15°c,55°c marking :
10. Counter weight bottom ( 40 Kgs) along with eye to be ensured
If broken replace :
11. Paint the counter weights(if required) :
12. Remarks (if any) :
13. Date of Attention :
14. Method of Attention :

Signature of the Contractor Representative Signature of the Railway Representative

Intitials of Depot Incharge