PFMEA Import Format

The document appears to be a quality control checklist for incoming parts and materials. It lists 7 potential inspection operations including checking viscosity of varnish, stuffing components on circuit boards, checking for missing components, testing polarities and segments, measuring paper width, checking resistor wattages, resistance values, and wire color orders. For each operation it identifies potential failure modes, effects, causes, prevention and detection controls. The goal is to check for non-conformances to specifications and prevent defects from reaching later processes or customers.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

PFMEA Import Format

The document appears to be a quality control checklist for incoming parts and materials. It lists 7 potential inspection operations including checking viscosity of varnish, stuffing components on circuit boards, checking for missing components, testing polarities and segments, measuring paper width, checking resistor wattages, resistance values, and wire color orders. For each operation it identifies potential failure modes, effects, causes, prevention and detection controls. The goal is to check for non-conformances to specifications and prevent defects from reaching later processes or customers.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Operation Product/Process

Operation Description Process Function PC ID S No. Product Process Potential Failure Mode Potential Effects of Failure: Sev Sev Potential Causes of Failure Occ Prevention Controls Detection Controls: Det Det
Number Specification/ Tolerance

OPN: Less/more
Incoming Quality
10.1 Incoming IQ/SS/PD/01 1 Viscosity of Varnish 30-35 sec Beyond spec consumption>>Physical inventory 7 Supplier process capability 1 Supplier Agreement Supplier Audit 7
Checking
dispatch
OPN: Defect skips in
IQC>Accumulation is more on
More 5
TFR>> Difficult in next process
during TFR clamp cleaning
OPN: Damage during
Stuffing of All component should have
transit>Rejection in full batch
IQ/SS/PD/02 2 components in properly mounted, no Not as per Specification 7 Supplier process capability 6 Supplier Agreement Supplier Audit 7
inspection>>Purchase return to
SMD PCBA slanting & no bending.
supplier
OPN: Defect skips in initial
5
testing>Rework
EU: Defect skips in all
checks>product reached to 7
customer >> functional issue
Component missing All required components OPN: Defect skips in initial
IQ/SS/PD/03 3 Not as per Specification 5 Supplier process capability 6 Supplier Agreement Supplier Audit 7
SMD PCBA should be present. testing>Rework
EU: Defect skips in all
checks>product reached to 7
customer >> functional issue
Polarity and All the seven segments OPN: Defect skips in initial
IQ/SS/PD/04 4 Not as per Specification 7 Supplier process capability 3 Supplier Agreement Supplier Audit 7
segment test need to work properly and testing>Rework
EU: Defect skips in all
4
checks>product reached to
IQ/SS/PD/05 5 Width of paper As per requirement Not as per Specification OPN: difficult to next process 2 Supplier process capability 1 Supplier Agreement Supplier Audit 7
IQ/SS/PD/06 6 Wattage of resistor As per specification More OPN: difficult to next process 2 Supplier process capability 1 Supplier Agreement Supplier Audit 7
EU: Defect skips in all
Less 7
checks>product reached to
OPN: Product fail in Visual Check by
IQ/SS/PD/07 7 Resistance As per the specification Not as per Specification 5 Wrongly validated by worker 1 Operator training 7
testing>Internal rework operator
EU: Defect skips in all
7
checks>product reached to
Wire color order of As per the specification on
IQ/SS/PD/08 8 Not as per Specification OPN: difficult to next process 2 Supplier process capability 2 Supplier Agreement Supplier Audit 7
10W 10P spox production manual of
EU: Defect skips in all
7
checks>product reached to
Print appearance of OPN: Damage during
IQ/SS/PD/09 9 At Part Specification Not as per Specification 5 Supplier process capability 5 Supplier Agreement Supplier Audit 7
carton transit>Rejection in full batch
IQ/SS/PD/10 10 TOP Dimension At Part Specification Not as per Specification OPN: difficult to next process 2 Supplier process capability 1 Supplier Agreement Supplier Audit 7
IQ/SS/PD/11 11 Flexibility of cable Cable should be flexible Not flexible OPN: Difficult to wire routing 2 Supplier process capability 1 Supplier Agreement Supplier Audit 7
Fitment of Can fix the cover with
IQ/SS/PD/12 12 Difficult to Fit OPN: difficult to next process 2 Supplier process capability 1 Supplier Agreement Supplier Audit 7
connector cover connector easily
Cap strength of Cap must be tightening OPN: Product fail in
IQ/SS/PD/13 13 Loose 5 Supplier process capability 2 Supplier Agreement Supplier Audit 7
fuse properly testing>Internal rework
EU: Defect skips in all
7
checks>product reached to
Centralized holes match
Hole Punching and
IQ/SS/PD/14 14 with components leads, No Not as per Specification OPN: difficult to next process 2 Supplier process capability 5 Supplier Agreement Supplier Audit 7
alignment of PCB
hole missing
OPN: Fails in HV test>Scrap
IQ/SS/PD/15 15 Class of Insulation Class F or Grade 2 in label Not as per Specification 8 Supplier process capability 1 Supplier Agreement Supplier Audit 7
generation
EU: Defect skips in all
checks>product reached to 8
customer >> Product failure
Thread / Head Correct threading. No
IQ/SS/PD/16 16 Not as per Specification OPN: difficult to next process 2 Supplier process capability 2 Supplier Agreement Supplier Audit 7
cutting of fasteners breakage, mismatching
OPN: Defect skips in IQC>Fails in
Fan should work in forward
IQ/SS/PD/17 17 Wire polarity of fan Not as per Specification initial test>>Rework/Scrap 8 Supplier process capability 1 Supplier Agreement Supplier Audit 7
biased condition only.
generation
EU: Defect skips in all
checks>product reached to 6
customer >> functional issue
OPN: Defect skips in IQC>Fails in
Fan Speed & Noise Fan should work without
IQ/SS/PD/18 18 Not as per Specification initial test>>Rework/Scrap 7 Supplier process capability 1 Supplier Agreement Supplier Audit 7
/ Vibration failing
generation
IQ/SS/PD/19 19 Fumes (solder flux) Fume should be less More S: Health issues of worker 1 Supplier process capability 1 Supplier Agreement Supplier Audit 7
OPN: Defect skips in initial
IQ/SS/PD/20 20 Brightness of LED Have good brightness Not as per Specification 5 Supplier process capability 2 Supplier Agreement Supplier Audit 7
testing>Rework
EU: Defect skips in all
checks>product reached to 7
customer >> functional issue
Insulation coating should
IQ/SS/PD/21 21 Insulation of Cable Not as per Specification OPN: Internal scrap generation 7 Supplier process capability 1 Supplier Agreement Supplier Audit 7
be uniform and centralized
Surface finishing Must be smooth and OPN: Defect skipped in initial
IQ/SS/PD/23 22 Not as per Specification 5 Supplier process capability 5 Supplier Agreement Supplier Audit 7
socket finishing checks>Internal rework
EU: Defect skipped in all
2
checks>>Aesthetic issues
Screw tightness of
IQ/SS/PD/24 23 Must be tight Loose OPN: Not in place>Internal rework 3 Supplier process capability 5 Supplier Agreement Supplier Audit 7
connector terminal
EU: Defect skipped in all
7 2 7
checks>Functional issues
Crimping
Must have fine crimping OPN: No continuity of earth ring>
IQ/SS/PD/25 24 perfection of Earth Loose 7 Supplier process capability 5 Supplier Agreement Supplier Audit 7
(not loosened) internal rework/scrap
ring connector
Solderability of Must have good
IQ/SS/PD/26 25 Not good solderability OPN: Difficult in process 2 Supplier process capability 2 Supplier Agreement Supplier Audit 7
leads solderability.
No blackening. Must have
IQ/SS/PD/27 26 Quality of leads Not good OPN: Difficult in process 2 Supplier process capability 2 Supplier Agreement Supplier Audit 7
good shining
No break of Insulation (no
continuity in the top and OPN: No load current is
IQ/SS/PD/28 27 Insulation Test of Lamination bottom surface). At edge Not as per Specification more>Internal rework/scrap 8 Supplier process capability 3 Supplier Agreement Supplier Audit 7
insulation is not generation
mandatory.
Runner
No projection on the
IQ/SS/PD/29 28 Portion/Projection Projection OPN: Difficult in process 2 Supplier process capability 7 Supplier Agreement Supplier Audit 7
runner portion.
of cabinet
Stapler Pin Quality No rust, shrinking ,stainless OPN: Material
IQ/SS/PD/30 29 Not as per Specification 7 Supplier process capability 5 Supplier Agreement Supplier Audit 7
Carton steel pins. rejection>Production delay
Scratches, burrs on OPN: Material
IQ/SS/PD/31 30 No Scratches, burrs, Scratches/Burrs 7 Supplier process capability 5 Supplier Agreement Supplier Audit 7
carton rejection>Production delay
Bending/ Shape No shape changing / OPN: Material
IQ/SS/PD/32 31 Shape changing/Bending 7 Supplier process capability 7 Supplier Agreement Supplier Audit 7
Change of Cabinet Bending. rejection>Production delay
IQ/SS/PD/33 32 Thickness At Part Specification Beyond specification OPN: difficult to next process 2 Supplier process capability 2 Supplier Agreement Supplier Audit 7
Type & Dimension
IQ/SS/PD/34 33 At Part Specification Beyond specification OPN: difficult to next process 2 Supplier process capability 2 Supplier Agreement Supplier Audit 7
Bobbin

You might also like