Hydrology Report at CH-9+491

This document provides calculations to estimate discharge from a catchment area using two different methods. The first method uses RYVE's formula to calculate discharge of 16.52 cubic meters per second based on a catchment area of 2.71 square kilometers. The second method uses area-velocity calculations from three cross sections along the stream to estimate discharges of 607.93 cubic meters per second at 30 meters upstream and 745.41 cubic meters per second at 80 meters upstream. Cross section data including area, perimeter, depth, and other values are presented.

Uploaded by

juliyet struc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
331 views3 pages

Hydrology Report at CH-9+491

This document provides calculations to estimate discharge from a catchment area using two different methods. The first method uses RYVE's formula to calculate discharge of 16.52 cubic meters per second based on a catchment area of 2.71 square kilometers. The second method uses area-velocity calculations from three cross sections along the stream to estimate discharges of 607.93 cubic meters per second at 30 meters upstream and 745.41 cubic meters per second at 80 meters upstream. Cross section data including area, perimeter, depth, and other values are presented.

Uploaded by

juliyet struc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

HYDROLOGY CALCULATION

DISCHARGE CALCULATION:
1. Discharge by RYVE'S formula
As per IRC:SP:13-2004 (Cl. 4.3)
Discharge Q= C . M2/3

Where, M = CatchmentCatchment
area in sq.km=
area in sq. km = 2.710
C = 6.8 for Areas near Coast less than 25Km,
= 8.5 between 25Km and 160Km of coast.
= 10 for limited Areas near the hills.
Taking C = 8.5
Therefore, Discharge
Q= (8.5X2.71^(2/3))
Q= 16.52 m3 / s.

2. Discharge by Area Velocity Method


i) Bed slope
Bed level at 130 m U/S 606.774 FRL = 612.410 m
Bed level at 130 m D/S 605.595 WC = 53 mm
Super Structure = 1480 mm
Average bed slope = 0.0045 Free Board = 600 mm

ii) Calculation of discharge for each cross section


a) Cross Section at 30 m U/S

Av. Depth Vertical Ht at Wetted


Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.284 610.277 2.99
2 5 607.134 610.277 3.14 3.07 5.00 15.34 0.15 5.00
3 10 606.974 610.277 3.30 3.22 5.00 16.11 0.16 5.00
4 15 606.904 610.277 3.37 3.34 5.00 16.69 0.07 5.00
5 20 606.709 610.277 3.57 3.47 5.00 17.35 0.20 5.00
6 25 606.899 610.277 3.38 3.47 5.00 17.36 0.19 5.00
7 30 607.094 610.277 3.18 3.28 5.00 16.40 0.20 5.00
8 35 607.389 610.277 2.89 3.04 5.00 15.18 0.29 5.01
9 40 607.654 610.277 2.62 2.76 5.00 13.78 0.26 5.01
10 45 608.034 610.277 2.24 2.43 5.00 12.16 0.38 5.01
11 50 608.194 610.277 2.08 2.16 5.00 10.81 0.16 5.00
Σ 151.2 Σ 50.05

Area of Cross Section A 151.20 m2 C/s at Bridge


Perimeter P 50.05 m 611
Hydraulic mean depth R 3.02 m 610
610
Levels (m)

Rugosity co-efficient n 0.035 609


609
As per IRC:SP:13-2004 (Table 5.1) 608
Bed slope of stream S 0.0045 608
607
Velocity (R2/3*S1/2/N) V 4.02 m/s 607
Discharge (A*V) Q 607.93 m3/s 0 10 20 30 40 50 60

Chainage (m)

b) Cross Section at 80 m U/S

Av. Depth Vertical Ht at Wetted


Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.084 610.277 3.19
2 5 606.964 610.277 3.31 3.25 5.000 16.26 0.12 5.00
3 10 606.934 610.277 3.34 3.33 5.000 16.64 0.03 5.00
4 15 606.834 610.277 3.44 3.39 5.000 16.96 0.10 5.00
5 20 606.684 610.277 3.59 3.52 5.000 17.59 0.15 5.00
6 25 606.624 610.277 3.65 3.62 5.000 18.11 0.06 5.00
7 30 606.684 610.277 3.59 3.62 5.000 18.11 0.06 5.00
8 35 606.884 610.277 3.39 3.49 5.000 17.46 0.20 5.00
9 40 606.894 610.277 3.38 3.39 5.000 16.94 0.01 5.00
10 45 606.984 610.277 3.29 3.34 5.000 16.69 0.09 5.00
11 50 607.154 610.277 3.12 3.21 5.000 16.04 0.17 5.00
Σ 170.82 Σ 50.01
Area of Cross Section A 170.82 m2 C/s at Bridge
Perimeter P 50.01 m 611
610
Hydraulic mean depth R 3.42 m 610

Levels (m)
609
Rugosity co-efficient n 0.035 609
608
Bed slope of stream S 0.0045 608
607
Velocity (R2/3*S1/2/N) V 4.36 m/s 607
606
Discharge (A*V) Q 745.41 m3/s 0 10 20 30 40 50 60
Chainage (m)

c) Cross Section at 130 m U/S

Av. Depth Vertical Ht at Wetted


Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.414 610.277 2.86
2 5 607.334 610.277 2.94 2.90 5.000 14.51 0.08 5.00
3 10 607.134 610.277 3.14 3.04 5.000 15.21 0.20 5.00
4 15 606.934 610.277 3.34 3.24 5.000 16.21 0.20 5.00
5 20 606.854 610.277 3.42 3.38 5.000 16.91 0.08 5.00
6 25 606.774 610.277 3.50 3.46 5.000 17.31 0.08 5.00
7 30 606.934 610.277 3.34 3.42 5.000 17.11 0.16 5.00
8 35 606.974 610.277 3.30 3.32 5.000 16.61 0.04 5.00
9 40 607.004 610.277 3.27 3.29 5.000 16.44 0.03 5.00
10 45 607.134 610.277 3.14 3.21 5.000 16.04 0.13 5.00
11 50 607.254 610.277 3.02 3.08 5.000 15.41 0.12 5.00
Σ 161.80 Σ 50.02

Area of Cross Section A 161.80 m2 C/s at Bridge


Perimeter P 50.02 m 611
610
Hydraulic mean depth R 3.23 m 610
Levels (m)

609
Rugosity co-efficient n 0.035 609
Bed slope of stream S 0.0045 608
608
Velocity (R2/3*S1/2/N) V 4.21 m/s 607
607
Discharge (A*V) Q 680.92 m3/s 0 10 20 30 40 50 60
Chainage (m)

d) Cross Section at 80 m D/S

Av. Depth Vertical Ht at Wetted


Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 608.065 610.277 2.21
2 5 607.445 610.277 2.83 2.52 5.00 12.61 0.62 5.04
3 10 607.105 610.277 3.17 3.00 5.00 15.01 0.34 5.01
4 15 606.575 610.277 3.70 3.44 5.00 17.18 0.53 5.03
5 20 606.300 610.277 3.98 3.84 5.00 19.20 0.28 5.01
6 25 605.825 610.277 4.45 4.21 5.00 21.07 0.47 5.02
7 30 606.290 610.277 3.99 4.22 5.00 21.10 0.46 5.02
8 35 606.820 610.277 3.46 3.72 5.00 18.61 0.53 5.03
9 40 608.205 610.277 2.07 2.76 5.00 13.82 1.38 5.19
10 45 608.445 610.277 1.83 1.95 5.00 9.76 0.24 5.01
11 50 608.465 610.277 1.81 1.82 5.00 9.11 0.02 5.00
Σ 157.5 Σ 50.35

Area of Cross Section A 157.47 m2 C/s at Bridge


Perimeter P 50.35 m 611
610
Hydraulic mean depth R 3.13 m 610
Levels (m)

609
Rugosity co-efficient n 0.035 609
608
As per IRC:SP:13-2004 (Table 5.1) 608
Bed slope of stream S 0.0045 607
607
606
Velocity (R2/3*S1/2/N) V 4.11 m/s 606
Discharge (A*V) Q 647.96 m3/s 0 10 20 30 40 50 60

Chainage (m)
e) Cross Section at 130 m D/S

Av. Depth Vertical Ht at Wetted


Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.485 610.277 2.79
2 5 607.010 610.277 3.27 3.03 5.000 15.15 0.48 5.02
3 10 606.675 610.277 3.60 3.43 5.000 17.17 0.34 5.01
4 15 606.300 610.277 3.98 3.79 5.000 18.95 0.38 5.01
5 20 606.060 610.277 4.22 4.10 5.000 20.48 0.24 5.01
6 25 605.595 610.277 4.68 4.45 5.000 22.25 0.46 5.02
7 30 606.205 610.277 4.07 4.38 5.000 21.88 0.61 5.04
8 35 606.510 610.277 3.77 3.92 5.000 19.60 0.30 5.01
9 40 607.790 610.277 2.49 3.13 5.000 15.63 1.28 5.16
10 45 608.400 610.277 1.88 2.18 5.000 10.91 0.61 5.04
11 50 608.275 610.277 2.00 1.94 5.000 9.70 0.13 5.00
Σ 171.72 Σ 50.32

Area of Cross Section A 171.72 m2 C/s at Bridge


Perimeter P 50.32 m 611
610
Hydraulic mean depth R 3.41 m

Levels (m)
609
Rugosity co-efficient n 0.035 608
Bed slope of stream S 0.0045 607
2/3 1/2
Velocity (R *S /N) V 4.36 m/s 606
605
Discharge (A*V) Q 748.90 m3/s
0 10 20 30 40 50 60
Chainage (m)

iii) Mean Discharge by AV Method


Based on Discharge Calculations at different locations
Average section of river 162.60 m2
Average Discharge 686.22 m3/s
Average Velocity 4.21 m/s

3. Design Discharge Q = 686.2247 m3/s


As Per IRC: SP-13-2004, Article 6, The highest of the above value shall be adopted as the Design discharge.
But the provided maximum value doesn’t exceed the second highest discharge by more than 50%.
Hence 1.5 x 16.52
Design Discharge Q = 24.78 m3/s

CALCULATION OF LINEAR WATER WAY AND CHECK FOR AFFLUX:


Design discharge Q = 24.78 m3/s
Velocity of river V = 0.55 m/s
Observed HFL = 610.277 m
Sill level = 607.297 m
Depth of water d = 2.98 m
Area of section at causeway A 1 15.80 2.98 = 47.08 m²
Available waterway A1 1 15.00 2.98 = 44.70 m²

As per IRC:89 1997 :(Molesworth formula)


Afflux H = {(V2/ 17.88) + 0.015} x {(A / A1)2 – 1} = 0.004 m
Velocity of approach=average velocity (Va=V.d/(d+H)) = 0.55 m/s
Head due to velocity of approach (Hva=Va2/2g) = 0.02 m
Total Afflux (Ht=H+Hva) = 0.02 m
Calculated HFL = 610.296
Velocity through vent (Vv=(2gHt)0.5) = 0.613 m/s
Linear waterway required (LWW=Q/(0.9*Vv*d)) = 15.07 m
Taking 1 Span of 15.00 m
Provided linear waterway(L) = 15.00 m

SCOUR DEPTH CALCULATION:


Mean Depth of Scour: dsm = 1.34 (Db 2/ Ksf )1/3
Design discharge Q = 24.78 m3/s
Effective linear Waterway L = 15.00 m
Db = Q / L
... Db = (24.78/15)
1.65 m3 /sec/m.
Ksf = 2.00
dsm = 1.34X(1.65^2/2)^1/3
1.49 m
Max Depth of Scour: For Abutment = 1.37 x dsm
dm= 2.04 m
For Pier = 2.00 x dsm
dm= 2.97 m