HYDROLOGY CALCULATION
DISCHARGE CALCULATION:
1. Discharge by RYVE'S formula
As per IRC:SP:13-2004 (Cl. 4.3)
Discharge Q= C . M2/3
Where, M = CatchmentCatchment
area in sq.km=
area in sq. km = 2.710
C = 6.8 for Areas near Coast less than 25Km,
= 8.5 between 25Km and 160Km of coast.
= 10 for limited Areas near the hills.
Taking C = 8.5
Therefore, Discharge
Q= (8.5X2.71^(2/3))
Q= 16.52 m3 / s.
2. Discharge by Area Velocity Method
i) Bed slope
Bed level at 130 m U/S 606.774 FRL = 612.410 m
Bed level at 130 m D/S 605.595 WC = 53 mm
Super Structure = 1480 mm
Average bed slope = 0.0045 Free Board = 600 mm
ii) Calculation of discharge for each cross section
a) Cross Section at 30 m U/S
Av. Depth Vertical Ht at Wetted
Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.284 610.277 2.99
2 5 607.134 610.277 3.14 3.07 5.00 15.34 0.15 5.00
3 10 606.974 610.277 3.30 3.22 5.00 16.11 0.16 5.00
4 15 606.904 610.277 3.37 3.34 5.00 16.69 0.07 5.00
5 20 606.709 610.277 3.57 3.47 5.00 17.35 0.20 5.00
6 25 606.899 610.277 3.38 3.47 5.00 17.36 0.19 5.00
7 30 607.094 610.277 3.18 3.28 5.00 16.40 0.20 5.00
8 35 607.389 610.277 2.89 3.04 5.00 15.18 0.29 5.01
9 40 607.654 610.277 2.62 2.76 5.00 13.78 0.26 5.01
10 45 608.034 610.277 2.24 2.43 5.00 12.16 0.38 5.01
11 50 608.194 610.277 2.08 2.16 5.00 10.81 0.16 5.00
Σ 151.2 Σ 50.05
Area of Cross Section A 151.20 m2 C/s at Bridge
Perimeter P 50.05 m 611
Hydraulic mean depth R 3.02 m 610
610
Levels (m)
Rugosity co-efficient n 0.035 609
609
As per IRC:SP:13-2004 (Table 5.1) 608
Bed slope of stream S 0.0045 608
607
Velocity (R2/3*S1/2/N) V 4.02 m/s 607
Discharge (A*V) Q 607.93 m3/s 0 10 20 30 40 50 60
Chainage (m)
b) Cross Section at 80 m U/S
Av. Depth Vertical Ht at Wetted
Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.084 610.277 3.19
2 5 606.964 610.277 3.31 3.25 5.000 16.26 0.12 5.00
3 10 606.934 610.277 3.34 3.33 5.000 16.64 0.03 5.00
4 15 606.834 610.277 3.44 3.39 5.000 16.96 0.10 5.00
5 20 606.684 610.277 3.59 3.52 5.000 17.59 0.15 5.00
6 25 606.624 610.277 3.65 3.62 5.000 18.11 0.06 5.00
7 30 606.684 610.277 3.59 3.62 5.000 18.11 0.06 5.00
8 35 606.884 610.277 3.39 3.49 5.000 17.46 0.20 5.00
9 40 606.894 610.277 3.38 3.39 5.000 16.94 0.01 5.00
10 45 606.984 610.277 3.29 3.34 5.000 16.69 0.09 5.00
11 50 607.154 610.277 3.12 3.21 5.000 16.04 0.17 5.00
Σ 170.82 Σ 50.01
Area of Cross Section A 170.82 m2 C/s at Bridge
Perimeter P 50.01 m 611
610
Hydraulic mean depth R 3.42 m 610
Levels (m)
609
Rugosity co-efficient n 0.035 609
608
Bed slope of stream S 0.0045 608
607
Velocity (R2/3*S1/2/N) V 4.36 m/s 607
606
Discharge (A*V) Q 745.41 m3/s 0 10 20 30 40 50 60
Chainage (m)
c) Cross Section at 130 m U/S
Av. Depth Vertical Ht at Wetted
Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.414 610.277 2.86
2 5 607.334 610.277 2.94 2.90 5.000 14.51 0.08 5.00
3 10 607.134 610.277 3.14 3.04 5.000 15.21 0.20 5.00
4 15 606.934 610.277 3.34 3.24 5.000 16.21 0.20 5.00
5 20 606.854 610.277 3.42 3.38 5.000 16.91 0.08 5.00
6 25 606.774 610.277 3.50 3.46 5.000 17.31 0.08 5.00
7 30 606.934 610.277 3.34 3.42 5.000 17.11 0.16 5.00
8 35 606.974 610.277 3.30 3.32 5.000 16.61 0.04 5.00
9 40 607.004 610.277 3.27 3.29 5.000 16.44 0.03 5.00
10 45 607.134 610.277 3.14 3.21 5.000 16.04 0.13 5.00
11 50 607.254 610.277 3.02 3.08 5.000 15.41 0.12 5.00
Σ 161.80 Σ 50.02
Area of Cross Section A 161.80 m2 C/s at Bridge
Perimeter P 50.02 m 611
610
Hydraulic mean depth R 3.23 m 610
Levels (m)
609
Rugosity co-efficient n 0.035 609
Bed slope of stream S 0.0045 608
608
Velocity (R2/3*S1/2/N) V 4.21 m/s 607
607
Discharge (A*V) Q 680.92 m3/s 0 10 20 30 40 50 60
Chainage (m)
d) Cross Section at 80 m D/S
Av. Depth Vertical Ht at Wetted
Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 608.065 610.277 2.21
2 5 607.445 610.277 2.83 2.52 5.00 12.61 0.62 5.04
3 10 607.105 610.277 3.17 3.00 5.00 15.01 0.34 5.01
4 15 606.575 610.277 3.70 3.44 5.00 17.18 0.53 5.03
5 20 606.300 610.277 3.98 3.84 5.00 19.20 0.28 5.01
6 25 605.825 610.277 4.45 4.21 5.00 21.07 0.47 5.02
7 30 606.290 610.277 3.99 4.22 5.00 21.10 0.46 5.02
8 35 606.820 610.277 3.46 3.72 5.00 18.61 0.53 5.03
9 40 608.205 610.277 2.07 2.76 5.00 13.82 1.38 5.19
10 45 608.445 610.277 1.83 1.95 5.00 9.76 0.24 5.01
11 50 608.465 610.277 1.81 1.82 5.00 9.11 0.02 5.00
Σ 157.5 Σ 50.35
Area of Cross Section A 157.47 m2 C/s at Bridge
Perimeter P 50.35 m 611
610
Hydraulic mean depth R 3.13 m 610
Levels (m)
609
Rugosity co-efficient n 0.035 609
608
As per IRC:SP:13-2004 (Table 5.1) 608
Bed slope of stream S 0.0045 607
607
606
Velocity (R2/3*S1/2/N) V 4.11 m/s 606
Discharge (A*V) Q 647.96 m3/s 0 10 20 30 40 50 60
Chainage (m)
e) Cross Section at 130 m D/S
Av. Depth Vertical Ht at Wetted
Chainage Bed level HFL Depth of water Distance Area
of water Bed level perimeter
(m) (m) (m) (m) (m) (m) (Sq.m) (m) (m)
1 0 607.485 610.277 2.79
2 5 607.010 610.277 3.27 3.03 5.000 15.15 0.48 5.02
3 10 606.675 610.277 3.60 3.43 5.000 17.17 0.34 5.01
4 15 606.300 610.277 3.98 3.79 5.000 18.95 0.38 5.01
5 20 606.060 610.277 4.22 4.10 5.000 20.48 0.24 5.01
6 25 605.595 610.277 4.68 4.45 5.000 22.25 0.46 5.02
7 30 606.205 610.277 4.07 4.38 5.000 21.88 0.61 5.04
8 35 606.510 610.277 3.77 3.92 5.000 19.60 0.30 5.01
9 40 607.790 610.277 2.49 3.13 5.000 15.63 1.28 5.16
10 45 608.400 610.277 1.88 2.18 5.000 10.91 0.61 5.04
11 50 608.275 610.277 2.00 1.94 5.000 9.70 0.13 5.00
Σ 171.72 Σ 50.32
Area of Cross Section A 171.72 m2 C/s at Bridge
Perimeter P 50.32 m 611
610
Hydraulic mean depth R 3.41 m
Levels (m)
609
Rugosity co-efficient n 0.035 608
Bed slope of stream S 0.0045 607
2/3 1/2
Velocity (R *S /N) V 4.36 m/s 606
605
Discharge (A*V) Q 748.90 m3/s
0 10 20 30 40 50 60
Chainage (m)
iii) Mean Discharge by AV Method
Based on Discharge Calculations at different locations
Average section of river 162.60 m2
Average Discharge 686.22 m3/s
Average Velocity 4.21 m/s
3. Design Discharge Q = 686.2247 m3/s
As Per IRC: SP-13-2004, Article 6, The highest of the above value shall be adopted as the Design discharge.
But the provided maximum value doesn’t exceed the second highest discharge by more than 50%.
Hence 1.5 x 16.52
Design Discharge Q = 24.78 m3/s
CALCULATION OF LINEAR WATER WAY AND CHECK FOR AFFLUX:
Design discharge Q = 24.78 m3/s
Velocity of river V = 0.55 m/s
Observed HFL = 610.277 m
Sill level = 607.297 m
Depth of water d = 2.98 m
Area of section at causeway A 1 15.80 2.98 = 47.08 m²
Available waterway A1 1 15.00 2.98 = 44.70 m²
As per IRC:89 1997 :(Molesworth formula)
Afflux H = {(V2/ 17.88) + 0.015} x {(A / A1)2 – 1} = 0.004 m
Velocity of approach=average velocity (Va=V.d/(d+H)) = 0.55 m/s
Head due to velocity of approach (Hva=Va2/2g) = 0.02 m
Total Afflux (Ht=H+Hva) = 0.02 m
Calculated HFL = 610.296
Velocity through vent (Vv=(2gHt)0.5) = 0.613 m/s
Linear waterway required (LWW=Q/(0.9*Vv*d)) = 15.07 m
Taking 1 Span of 15.00 m
Provided linear waterway(L) = 15.00 m
SCOUR DEPTH CALCULATION:
Mean Depth of Scour: dsm = 1.34 (Db 2/ Ksf )1/3
Design discharge Q = 24.78 m3/s
Effective linear Waterway L = 15.00 m
Db = Q / L
... Db = (24.78/15)
1.65 m3 /sec/m.
Ksf = 2.00
dsm = 1.34X(1.65^2/2)^1/3
1.49 m
Max Depth of Scour: For Abutment = 1.37 x dsm
dm= 2.04 m
For Pier = 2.00 x dsm
dm= 2.97 m