PROJECTS
THEOPHILUS AIKA
ON-GOING
PROJECTS
SMEng
HiCare
E-Library
E-Procurement
SMENG
PROJECT 1
SMENG
MAIN FEATURES OF SMENG
• Income Generation: The fundamental goal of the project is to generate income for the
company, be it monthly, weekly or daily. This will be based on Economies of Scale, with small
charges that targets lots of users.
• Enhance National GDP: In significant ways, the project seeks to contribute to the nation Gross
Domestic Product index. This is geared at providing the platform for SMEs to thrive in business,
engaging their innovations and creativity in production or providing services to make profit.
• Empowerment: One of the goals of the project is to empower youth by providing a platform
where they can start a business with very little or no capital, either as Artisan or SME.
SMENG TECHNICAL IMPLEMENTATION
• The main framework used for this project is Laravel for the back-end.
• The front-end will be powered by Vuejs for best user experience.
WORK PLAN FOR SMENG
TASK ACTIVITY DURATION STATUS
Hold meetings to draft a
Planning and
clear picture of the
Requirements 1 week 100%
project and get relevant
Specification
sample materials
Storyboard, Wireframe, Graphical design of user
2 weeks 90%
UX/UI design interfaces
Scaffolding of major
modules, e.g User
Database design, E-R
module, Resource
diagrams, classes and 4 weeks 50%
module, relationships,
object design
search, forms, RFQ,
security, …
WORK PLAN FOR SMENG (CONT’D)
TASK ACTIVITY DURATION STATUS
Developing Models,
Writing code Controllers, Views and 6 weeks 40%
Helper functions
Bug fixes and code
Testing and Refactoring 1 week 10%
efficiency
Uploading files to
Deployment 2 days 15%
remote server
Updates, bug fixes,
Maintenance refactoring, and Application lifetime 0%
upgrades
This has an estimated period of 2 months, with the major features ready by end of April 2019.
E-LIBRARY
PROJECT 2
E-LIBRARY
MAIN FEATURES OF E-LIBRARY
• The main framework used for this project is Laravel for the back-end.
• The front-end will be powered by Vuejs for fast load time and best user
experience.
WORK PLAN FOR E-LIBRARY
TASK ACTIVITY DURATION STATUS
Information gathering to
Planning and
get a clear picture of the
Requirements 1 week 90%
project and its
Specification
requirements
Storyboard, Wireframe, Graphical design of user
2 weeks 70%
UX/UI design interfaces
Created modules, e.g
Database design, E-R
User module, Library
diagrams, classes and 3 weeks 60%
module, Entity
object design
relationships, search, …
WORK PLAN FOR E-LIBRARY (CONT’D)
TASK ACTIVITY DURATION STATUS
Developing Models,
Development Controllers, Views and 5 weeks 50%
Helper functions
Evaluate code for
Testing and Refactoring 1 week 20%
efficiency
Uploading files to
Deployment 2 days 0%
remote server
Updates, bug fixes,
Maintenance refactoring, and Application lifetime 0%
upgrades
This has an estimated period of 6 weeks, with the major features ready by end of May 2019.
HICARE
PROJECT 3
HICARE
MAIN FEATURES OF HICARE
• The main framework used for this project is Laravel for the back-end.
• The front-end will be powered by Vuejs for fast load time and best user
experience.
WORK PLAN FOR HICARE
TASK ACTIVITY DURATION STATUS
Planning and Basic data gathering for
Requirements better understanding of 1 week 50%
Specification the system
Storyboard, Wireframe, Graphical design of user
2 weeks 50%
UX/UI design interfaces
Modules, e.g User
Database design, E-R
module, Medical module,
diagrams, classes and 4 weeks 40%
Entity relationships,
object design
search, …
WORK PLAN FOR HICARE (CONT’D)
TASK ACTIVITY DURATION STATUS
Developing Models,
Development Controllers, Views and 6 weeks 40%
Helper functions
Testing and Refactoring Code process evaluation 1 week 10%
Uploading files to
Deployment 2 days 0%
remote server
Updates, bug fixes,
Maintenance refactoring, and Application lifetime 0%
upgrades
This has an estimated period of 8 weeks, with the major features ready by end of June 2019.
E-PROCUREMENT
PROJECT 4
E-PROCUREMENT
MAIN FEATURES OF E-PROCUREMENT
• The main framework used for this project is Laravel for the back-end.
• The front-end will be powered by Vuejs for fast load time and best user
experience.
WORK PLAN FOR E-PROCUREMENT
TASK ACTIVITY DURATION STATUS
Information gathering to
Planning and
get a clear picture of the
Requirements 1 week 30%
project and its
Specification
requirements
Storyboard, Wireframe, Graphical design of user
2 weeks 20%
UX/UI design interfaces
Created modules, e.g
Database design, E-R User module, MDA
diagrams, classes and module, Procurement 3 weeks 30%
object design Module, Entity
relationships, search, …
WORK PLAN FOR E-PROCUREMENT (CONT’D)
TASK ACTIVITY DURATION STATUS
Developing Models,
Development Controllers, Views and 5 weeks 20%
Helper functions
Evaluate code and
Testing and Refactoring processes for more 1 week 5%
efficiency
Uploading files to
Deployment 2 days 0%
remote server
Updates, bug fixes,
Maintenance refactoring, and Application lifetime 0%
upgrades
This has an estimated period of 6 weeks, with the major features ready by end of July 2019.
QUARTERLY WORK FLOW
QUARTER MILESTONES REMARK
• Full commencement of SMEng
1st Quarter (Jan – March) Started in March
• Capacity Building: Python
• Completion of SMEng
• Development of e-Library and
HiCare projects
2nd Quarter (Apr – Jun) • Capacity Building: Python, Deliver two projects
Data Analytics, Big Data, ITIL
• Mac Adams Official website
overhaul
• Development of e-Procurement
3rd Quarter (Jul – Sep) • Capacity Building: Networking
& Server Administration
• Developing other projects as
they emerge
4th Quarter (Oct – Dec) Training in different skill set
• Mac Adams Staff needs
assessment and training
THE FUTURE STARTS NOW