This document provides standard operating procedures for installing dome closures and optical distribution boxes on poles. It outlines the key safety steps such as a toolbox meeting and using personal protective equipment. It then describes the technical installation process which involves splicing fiber, attaching strength members, grounding, labeling, and testing with OTDR equipment. The closures and boxes are mounted on poles using brackets and tape to complete the installation.

Uploaded by

Aung Thein Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
153 views6 pages

Dome Closure and ODB SOP

This document provides standard operating procedures for installing dome closures and optical distribution boxes on poles. It outlines the key safety steps such as a toolbox meeting and using personal protective equipment. It then describes the technical installation process which involves splicing fiber, attaching strength members, grounding, labeling, and testing with OTDR equipment. The closures and boxes are mounted on poles using brackets and tape to complete the installation.

Uploaded by

Aung Thein Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

SOP of Dome Closure Installation.

150mm Diameter x 500mm Height dome Closure

 Tool Box meeting


 Brief HSE instruction and check that PPE must be worn.
 Check and fill up daily Safety equipment checklist and daily health check checklist.
 Work space must be barricaded and check the field conditions and environment
 Set up the camp and clear working area.
 Prepare table and sheet on the ground.
 Place closure and accessories on the sheet and prepare for splicing.
 Remove outer shield by using Armor Cable Slitter (1.5m loop tube).

 Clean loop tube by using alcohol (remove gel)


 Strength member of 12-core fiber attached to closure
 Coil spare loop tube in the cable tray

 Put the protection tube to loop tube which it has to splice

 Splicing the 12-core joint(0.02dB) on the table


 Put the sleeve in the sleeve holder properly
 Coil spliced fiber in the tray properly

 Closure Grounding

 Put the label on the cable and dome closure


 Closure has been installed on the top of pole up-side by using steel tape, buckle and
bracket
 10 m 12-core fiber has been coiled in the zero bracket
 OTDR test
 Site Cleaning after the work done.
SOP of ODB Installation (Optical Distribution Box)
500mm x 500mm x 200mm

 Tool Box meeting.


 Brief HSE instruction and check that PPE must be worn.
 Check and fill up daily Safety equipment checklist and daily health check checklist.
 Work space must be barricaded and check the field conditions and environment
 Set up the camp and clear working area.
 Prepare table and sheet on the ground.
 Place ODB and accessories on the sheet and prepare for splicing.
 Remove outer shield by using Amor Cable Slitter (1.5m loop tube).
 Clean loop tube by using alcohol (remove gel).
 Put the 12-core fiber in to the PVC pipe (4” x1.5m).
 Strength member of 12-core fiber attached to ODB.
 Coil spare loop tube in the cable tray.
 Put the protection tube to loop tube which it has to splice.
 Splicing the 12-core (0.02dB) on the table.
 Put the sleeve in the sleeve holder properly.
 Coil spliced fiber in the tray properly.
 Put the label on the cable and ODB.

 ODB has been installed on pole at 3m on the ground level by using steel tape, buckle
and bracket.

 10 m 12-core fiber has been coiled in the zero bracket.


 PVC pipe 1.2m has to be under of reserved coil 1feet away.
 OTDR test.
 Site Cleaning after the work done.