Bill No: 1 - Construction of Flyover
Bill No: 1 - Construction of Flyover
SCHEMATIC
SCHEMATIC
SCHEMATIC
OGL 20m LEFT
CHAINAGE(m)
P.ROW
SUPERELEVATION (%)
VERTICAL ALIGNMENT
EXISTING ROAD LEVEL
452
454
456
458
460
462
464
466
468
470
472
474
476
478
HORIZONTAL ALIGNMENT
SOLAPUR
P.ROW
7+000 465.492 464.753 465.713
7+000
Ref. Dwg.No.
7+010 465.394 464.718 465.548
LRPCC/NHAI/HW/MISC/
Median Open @ 7+000
7+020 465.571 464.677 465.384
TS-01
7+030 465.747 464.635 465.220
7+040 465.893 464.608 465.056
P.ROW
7+050 466.017 464.599 464.892
7+060 466.119 464.679 464.727
7+070 466.321 464.818 464.563
7+080 466.521 464.611 464.399
P.ROW
CONSULTANT:
7+190 467.158 466.015 462.593
7+200
7+200 467.129 465.486 462.429
7+204
7+210 467.173 465.151 462.267
K=60.361
Lv=250.000m
7+340 463.202 461.948 461.652
P.ROW
SOLAPUR BYPASS
CLIENT :
7+360 462.307 461.480 461.806
7+370 461.876 461.195 461.907
7+380 461.443 460.908 462.026
P.ROW
G=2.5
AUTHORITY OF INDIA
NATIONAL HIGHWAYS
7+470 458.613 458.794 463.816
7+480 458.431 458.551 464.066
L=52m
P.ROW
G=2.500%
7+490 458.252 458.300 464.316 7+500
7+500 458.083 458.173 464.566
7+506
7+510 457.982 458.089 464.813
PROJECT :
7+520 457.905 458.005 465.026
7+530 457.791 457.920 465.197
7+540 457.586 457.718 465.326
P.ROW
Ch.=7566.016
7+550 457.381 457.508 465.413 L=466.217
KM-362
3
KM62
7+560 457.181 457.314 465.459 Flyover
K=-24.000
CH:7+568
7+580 456.686 457.020 465.426
P.ROW
(PHASE-III)
7+610 456.121 456.324 465.064
7+620 456.145 456.414 464.860
7+626
7+630 456.173 456.493 464.617
7+640 456.202 456.572 464.367
P.ROW
7+800
G=-2.5
@ Ch.8+008 (Both
P.ROW
Revision: R0