Poles: SL - No. Name of The Firm Approved Material
Poles: SL - No. Name of The Firm Approved Material
M/s Sri Maruthi Concrete 8m /115kgf & 9m /145 kgf RCC poles
Products,Sy No: 131, yediur,
1
Mahadeva Kodegehalli Road, Bagalur
post, Bagalur-562149 8m /200kgf & 9m /200 kgf PSC poles
9 Mtrs PSC/200kgs WL
8 Mtrs RCC/115kgs WL
M/s Akshaya Cement Products., # 14,
13 Pamadi Tower, 1st Main, 9 Mtrs RCC/145 Kgs WL
Gandhinagar, Bangalore- 560 009
8 Mtrs PSC/200kgs WL
M/s Chamundeshvari Concrete
Products, #285/1, Yelahanka Bagalur 9 Mtrs PSC/200kgs WL
14
Road, Bagalur, Jala Hobli, Bangalore- 8 Mtrs RCC/115kgs WL
562 149
9 Mtrs RCC/145 Kgs WL
8 Mtrs PCC/140kgs WL
M/s Stresscrete (India) Products, 8 Mtrs PSC/200kgs WL
15 S.No: 248, Kadanur Village, 9 Mtrs PSC/200kgs WL
Doddaballapur, Bangalore Rural Dist 8 Mtrs RCC/115kgs WL
9 Mtrs RCC/145 Kgs WL
8 Mtrs RCC poles, WL-115 kgs
M/s. S.L.N.Industries, Survey No:101, 9 Mtrs RCC poles, WL-145 kgs
16 Janakoti Village,I.D.Halli Hoble,
Madhugiri Tq., Tumkur Dist 8 Mtrs PSC poles, WL-200 Kgs
9 Mtrs PSC Poles, WL-200 Kgs
8 Mtrs RCC poles, WL- 115 Kgs
M/s Mysore Precast Constructions, 9 Mtrs RCC poles, WL -145 Kgs
17 Survey No: 94/1, Arakere, Madhugiri 8 Mtrs PSC poles, WL- 200 Kgs
Road, Tumkur-572106 9 Mtrs PSC poles, WL- 200 Kgs
8 Mtrs PCC poles, WL- 140 Kgs
8 Mtrs RCC poles, WL- 115 Kgs
M/s Perfect Electromechanical Fab, 9 Mtrs RCC poles, WL -145 Kgs
Sy no: 132, Baladare Village, 8 Mtrs PSC poles, WL- 200 Kgs
18 Dandiganahalli Hobli, Ydayapura,
Channarayapatna, Hassan Dist.
Karnataka-573111 Bangalore
M/s Perfect Electromechanical Fab,
Sy no: 132, Baladare Village,
18 Dandiganahalli Hobli, Ydayapura,
Channarayapatna, Hassan Dist. 9 Mtrs PSC poles, WL- 200 Kgs
Karnataka-573111 Bangalore
9 Mtrs square section- RCC poles
8 Mtrs PCC/140kgs WL
8 Mtrs PSC/200kgs WL
M/s Sri Vanashri Industries,
#2658/1-2, RUTVI Motors, 1st floor, 9 Mtrs PSC/200kgs WL
19
M.C.C.'B', Dental Collage Road, 8 Mtrs RCC/115kgs WL
Davangere- 577004
9 Mtrs RCC square section Poles with
150 kgs Working Load
M/s Transline, Plot No: 305, Jaipura, 8 Mtrs /115 Kgs -RCC poles
69 Bilagumba Post, Kasaba Hobli,
Ramanagara Taluk & Dist
9 Mtrs /145 Kgs -RCC poles
GM(QS&S)/DGM-3/BC-11/14-
15/F-853/CYS-08/26.04.2014
30.09.2018 To be revalidated
( subject to revalidation every
year)
GM(QS&S)/DGM-3/BC-11/14-
15/F-852/CYS-27/27.05.2014
31.03.2018 validity lapsed
( subject to revalidation every
year)
GM(QS&S)/DGM-3/BC-11/14-
15/F-852/CYS-40/24.07.2014
31.03.2019 To be revalidated
( subject to revalidation every
year)
GM(QS&S)/DGM-3/BC-11/14-
05.08.2018
15/F-852/CYS-46/05.08.2014
GM(QS&S)/DGM-4/ BC-
31.01.2019
11/ 17-18/CYS-98
( subject to revalidation every
dtd:14.08.2018
year)
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-28 dated:01.06.2015
31.12.2018 To be revalidated
( subject to revalidation every
year)
14.08.2018
BESCOM/GM(QS&S)DGM(El.,) 09.06.2018
31.01.2020 -3)/BC-11/15-16/Cys-63 dated: GM(QS&S)/DGM-4/BC-
14.08.2015 11/17-18/CYS-189
dtd:16.11.2017
BESCOM/GM(QS&S)DGM(El.,)
30.06.2020 -3)/BC-11/15-16/Cys-67 dated: To be revalidated
29.08.2015
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-56 dated: 29.07.2015
30.04.2020 To be revalidated
( subject to revalidation every
year)
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-99 dated:
30.06.2020 To be revalidated
30.10.2015( Subject to
revalidation every year)
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-94
31.08.2020 dated:20.10.2015(subject to To be revalidated
revalidation every year)
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-93
31.08.2020 To be revalidated
dated:20.10.2015(subject to
revalidation every year)
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-92
To be revalidated
dated:20.10.2015(subject to
Revalidation every year).
31.08.2020
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-91 dated:20.10.2015
31.08.2020 To be revalidated
(subject to Revalidation every
year).
31.12.2018
01.03.2019
GM(QS&S)/DGM-3/BC-11/15-
09.09.2018
16/CYS-90
31.08.2020 GM(QS&S)/DGM-4/BC-
dated:20.10.2015(Subject to
11/17-18/CYS-294
Revalidaion every year)
dated:13.03.2018
31.01.2019
GM(QS&S)/DGM-3/BC-11/15- 26.11.2018
31.09.2020 16/CYS-121 dated:26.11.2015 GM(QS&S)/DGM-4/ BC-
(Subject to Revalidation every 11/17-18/CYS-242
31.09.2020 year) dtd:16.01.2018
GM(QS&S)/DGM-3/BC-11/15- 16.12.2018
16/CYS-126 GM(QS&S)/DGM-4/ BC-
30.09.2020
dated:16.12.2015(Subject to 11/17-18/CYS-238
Revalidaion every year) dtd:10.01.2018
18.01.2019
GM(QS&S)/DGM-3/BC-11/15-
GM(QS&S)/DGM-4/ BC-
16/CYS-150
31.12.2020 11/17-18/CYS-13
dated:18.01.2016(Subject to
dtd:23.04.2018
Revalidaion every year)
18.01.2019
GM(QS&S)/DGM-3/BC-11/15-
GM(QS&S)/DGM-4/ BC-
16/CYS-150
31.12.2020 11/17-18/CYS-13
dated:18.01.2016(Subject to
dtd:23.04.2018
Revalidaion every year)
GM(QS&S)/DGM-3/BC-11/15- 26.12.2018
16/CYS-152 GM(Q,S&S)DGM -4)/ BC-
30.11.2020
dated:06.02.2016(Subject to 11/17-18/cys-226 dated:
Revalidaion every year) 29.12.2017
GM(QS&S)/DGM-3/BC-11/15-
18.08.2020(with respect to date of
16/CYS-157
conducting type test i.e. on 12.09.2015 To be revalidated
dated:16.02.2016(Subject to
by M/s. Civil aid technoclinic, B'lore)
Revalidaion every year)
14.03.2019
GM(QS&S)/DGM-3/BC-11/15-
12.09.2020(with respect to date of 09.09.2018
16/CYS-162
conducting type test i.e. on 12.09.2015 GM(QS&S)/DGM-4/BC-
dated:27.02.2016(Subject to
by M/s. Civil aid technoclinic, B'lore) 11/17-18/CYS-296
Revalidaion every year)
dated:14.03.2018
GM(QS&S)/DGM-3/BC-11/15-
14.01.2021(with respect to date of
16/CYS-173
conducting type test i.e. on 14.01.2016 To be revalidated
dated:29.03..2016(Subject to
by M/s. Civil aid technoclinic, B'lore)
Revalidaion every year)
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-32
To be revalidated
28.03.2021(with respect to date of dated:07.06.2016(Subject to
conducting type test i.e. on 28.03.2016 Revalidaion every year)
by M/s. Civil aid technoclinic,
B'lore)
31.01.2018
GM(QS&S)/DGM-4/BC-11/16-
09.06.2018
17/CYS-35 dated:09.06.2016
05.04.2021 (With respect to date of GM(QS&S)/DGM-4/ BC-
(subject to Revalidation every
conducting type test i.e on 11/17-18/CYS-127
year).
05.04.2016 by M/s Civil aid dtd:11.09.2017
31.01.2018
GM(QS&S)/DGM-4/BC-11/16-
09.06.2018
17/CYS-35 dated:09.06.2016
05.04.2021 (With respect to date of GM(QS&S)/DGM-4/ BC-
(subject to Revalidation every
conducting type test i.e on 11/17-18/CYS-127
year).
05.04.2016 by M/s Civil aid dtd:11.09.2017
technoclinic, B’lore)
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-41 dated:24.06.2016
To be revalidated
26.03.2021 (With respect to date of (subject to Revalidation every
year).
conducting type test i.e on
26.03.2016 by M/s Civil aid
technoclinic, B’lore)
16.10.2020
02.05.2021
14.02.2021 GM(QS&S)/DGM-4/BC-11/15-
16/CYS-69
29.08.2020 To be revalidated
dated:21.07.2016( Subject to
15.10.2019 revalidation every year)
16.10.2020
26.03.2019
05.07.2018
GM(QS&S)/DGM-4/BC-11/16-
12.05.2021 (With respect to date of GM(QS&S)/DGM-4/ BC-
17/CYS-54
conducting type test i.e on 12.05.2016 11/17-18/CYS-126
dated:05.07.2016(subject to
by M/s Civil aid technoclinic, B’lore) dtd:08.09.2017
Revalidation every year).
GM(QS&S)/DGM-4/BC-11/16- 04.08.2018
17/CYS-79 GM(QS&S)/DGM-4/ BC-
02.08.2021
dated:04.08.2016(subject to 11/17-18/CYS-116
Revalidation every year). dtd:29.08.2017
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-84 dated:11.08.2016
(subject to Revalidation every
year). 11.08.2019
01.08.2021
& GM(QS&S)/DGM-3/BC-
(Amended)
GM(QS&S)/DGM-4/BC-11/16- 11/18-19/CYS-47
17/CYS-128 dated:21.10.2016 dtd:19.06.2018
(subject to Revalidation every
year).
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-95
26.07.2021 To be revalidated
dated:26.08.2016(subject to
Revalidation every year).
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-102 dated:01.09.2016
23.08.2021 To be revalidated
(subject to Revalidation every
year).
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-104 dated:07.09.2016
25.07.2021 To be revalidated
(subject to Revalidation every
year).
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-115 dated:26.09.2016
01.09.2021 To be revalidated
(subject to Revalidation every
year).
27.02.2018
GM(QS&S)/DGM-4/BC-11/16-
21.10.2018
17/CYS-127 dated:21.10.2016
22.09.2021 GM(QS&S)/DGM-4/ BC-
(subject to Revalidation every
11/17-18/CYS-135
year).
dtd:20.09.2017
GM(QS&S)/DGM-4/BC-11/16- 24.10.2018
17/CYS-129 dated:24.10.2016 GM(QS&S)/DGM-4/ BC-
25.11.2020
(subject to Revalidation every 11/17-18/CYS-232
year). dtd:03.01.2018
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-135 dated:27.10.2016
16.08.2021 To be revalidated
(subject to Revalidation every
year).
18.11.2021
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-144 dated:28.11.2016
vendor approval for supply of RCC To be revalidated
(subject to Revalidation every
poles for ongoing works only & valid year).
upto the completion of works awarded
wherein RCC poles are already
provided
18.11.2021
GM(QS&S)/DGM-4/BC-11/16-
17/CYS-145 dated:28.11.2016
vendor approval for supply of RCC To be revalidated
(subject to Revalidation every
poles for ongoing works only & valid year).
upto the completion of works awarded
wherein RCC poles are already
provided
GM(QS&S)/DGM-4/BC-11/16-
17/ CYS-153 dated:09.12.2016
To be revalidated
(subject to Revalidation every
Vendor approval for supply of RCC
year).
poles for ongoing works only & valid
upto the completion of works awarded
where in RCC poles are already
provided.
04.02.2019
GM(QS&S)/DGM-4/BC-11/16-
GM(QS&S)/DGM-4/BC-
30.09.2021 17/ CYS-168 dated:04.02.2017
11/18-19/CYS-64
(To be revalidated every year).
dated:28.06.2018
03.03.2019
GM(QS&S)/DGM-4/BC-11/16-
GM(QS&S)/DGM-3/BC-
03.03.2019 17/ CYS-180 dated:06.03.2017
11/18-19/CYS-59
(To be revalidated every year).
dtd:26.06.20183
26.12.2021 (With respect to date of
conducting type test i.e on 26.12.2016
by M/s Civil aid technoclinic, B’lore)
GM(QS&S)/DGM-4/BC-11/16-
revalidated upto
17/ CYS-181 dated:10.03.2017
Vendor approval for supply of RCC 10.03.2019
(To be revalidated every year).
poles for ongoing works only & valid
upto the completion of works awarded
where in RCC poles are already
provided
Vendor approval for supply of 8 & 9 mtr
RCC poles for ongoing works only &
valid upto the completion of works GM(QS&S)/DGM-4/BC-11/16-
awarded where in RCC poles are 17/ CYS-183 dated:17.03.2017 NA
already provided.
GM(QS&S)/DGM-4/BC-11/16-
12.12.2021 17/ CYS-06 dated:07.04.2017 To be revalidated
(To be revalidated every year).
04.04.2021
01.03.2022
GM(QS&S)/DGM-4/BC-11/16-
17/ CYS-08 dated:07.04.2017 To be revalidated
(To be revalidated every year).
GM(QS&S)/DGM-4/BC-11/16-
17/ CYS-08 dated:07.04.2017 To be revalidated
Vendor approval for supply of RCC (To be revalidated every year).
poles for ongoing works only & valid
upto the completion of works awarded
where in RCC poles are already
provided
23.01.2022
GM(QS&S)/DGM-4/BC-11/16-
Vendor approval for supply of RCC 17/ CYS-11 dated:22.04.2017 To be revalidated
poles for ongoing works only & valid (To be revalidated every year).
upto the completion of works awarded
where in RCC poles are already
provided
09.03.2022 (With respect to date of
conducting type test i.e on 26.12.2016
by M/s Civil aid technoclinic, B’lore)
GM(QS&S)/DGM-4/BC-11/16-
17/ CYS-14 dated:28.04.2017 To be revalidated
Vendor approval for supply of RCC (To be revalidated every year).
poles for ongoing works only & valid
upto the completion of works awarded
where in RCC poles are already
provided
09.03.2022 (With respect to date of
conducting type test i.e on 09.03.2017
by M/s Civil aid technoclinic, B’lore)
GM(QS&S)/DGM-4/BC-11/16-
Vendor approval for supply of RCC 17/ CYS-15 dated:28.04.2017 To be revalidated
poles for ongoing works only & valid (To be revalidated every year).
upto the completion of works awarded
where in RCC poles are already
provided
GM(QS&S)/DGM-4/BC-11/16-
Vendor approval for supply of RCC 17/ CYS-16 dated:28.04.2017 To be revalidated
poles for ongoing works only & valid (To be revalidated every year).
upto the completion of works awarded
where in RCC poles are already
provided
28.02.2022With respect to date of
conducting type test i.e on 28.02.2017
by M/s Civil aid technoclinic, B’lore)
GM(QS&S)/DGM-4/BC-11/16-
17/ CYS-17 dated:28.04.2017 To be revalidated
Vendor approval for supply of RCC
(To be revalidated every year).
poles for ongoing works only & valid
upto the completion of works awarded
where in RCC poles are already
provided
09.03.2022 (With respect to date of
conducting type test i.e on
09.03.2017 by M/s Civil aid
technoclinic, B’lore)
GM(QS&S)/DGM-4/BC-11/16-
Vendor approval for supply of RCC 17/ CYS-19 dated:04.05.2017 To be revalidated
poles for ongoing works only & valid (To be revalidated every year).
upto the completion of works
awarded where in RCC poles are
already provided
02.12.2021
GM(QS&S)/DGM-4/BC-
19.05.2019
Vendor approval for supply of RCC 11/16-17/ CYS-35
GM(QS&S)/DGM-3/BC-
poles for ongoing works only & valid dated:19.05.2017
11/18-19/CYS-66
upto the completion of works (To be revalidated every
dtd:28.06.2018
awarded where in RCC poles are year).
already provided
09.03.2022
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-49
Vendor approval for supply of RCC dated:03.06.2017 To be revalidated
poles for ongoing works only & valid (To be revalidated every
upto the completion of works year)
awarded where in RCC poles are
already provided
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-52
01.06.2022 dated:06.06.2017 To be revalidated
(To be revalidated every
year)
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-70
23.01.2022 dated:06.07.2017
(To be revalidated every
year)
08.06.2022
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-80
dated:24.07.2017
(To be revalidated every
year)
Vendor approval for supply of RCC
poles for ongoing works only & valid
upto the completion of works
awarded where in RCC poles are
already sanctioned
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-83
19.06.2022 dated:29.07.2017
(To be revalidated every
year)
03.07.2022
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-91
dated05.08.2017
(To be revalidated every
Vendor approval for supply of RCC year)
poles for ongoing works only & valid
upto the completion of works
awarded where in RCC poles are
already sanctioned
05.07.2022
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-92
dated05.08.2017
(To be revalidated every
year)
Vendor approval for supply of RCC
poles for ongoing works only & valid
upto the completion of works
awarded where in RCC poles are
already sanctioned
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-115 dated
02.08.2022 29.08.2017
(To be revalidated every
year)
31.04.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-117 dated
31.04.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-117 dated
29.08.2017
Vendor approval for supply of RCC (To be revalidated every
poles for ongoing works only & valid year)
upto the completion of works
awarded where in RCC poles are
already sanctioned
28.06.2021
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-122 dated
Vendor approval for supply of RCC 05.09.2017
poles for ongoing works only & valid (To be revalidated every
upto the completion of works year)
awarded where in RCC poles are
already sanctioned
03.10.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-154 dated
03.10.2017
Vendor approval for supply of RCC (To be revalidated every
poles for ongoing works only & valid year)
upto the completion of works
awarded where in RCC poles are
already provided
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-157 dated
29.07.2022 04.10.2017
(To be revalidated every
year)
06.10.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-169 dated
24.10.2017
(To be revalidated every
Vendor approval for supply of RCC year)
poles for ongoing works only & valid
upto the completion of works
awarded where in RCC poles are
already sanctioned.
03.10.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-170 dated
24.10.2017
(To be revalidated every
03.10.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-170 dated
24.10.2017
(To be revalidated every
year)
27.03.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-187
dated16.11.2017
Vendor approval for supply of RCC (To be revalidated every
poles for ongoing works only & valid year)
upto the completion of works
awarded where in RCC poles are
already sanctioned.
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-191
23.10.2022 dated:16.11.2017
(To be revalidated every
year)
23.10.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-192
Vendor approval for supply of RCC dated16.11.2017
poles for ongoing works only & valid (To be revalidated every
upto the completion of works year)
awarded where in RCC poles are
already sanctioned.
04.07.2019
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-194
dated:16.11.2017
Vendor approval for supply of RCC (To be revalidated every
poles for ongoing works only & valid year)
upto the completion of works
awarded where in RCC poles are
already sanctioned.
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-200 dated:
07.10.2022 23.11.2017
(To be revalidated every
year)
09.10.2022
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-201 dated:
25.11.2017
Vendor approval for supply of RCC (To be revalidated every
poles for ongoing works only & valid year)
upto the completion of works
awarded where in RCC poles are
already sanctioned.
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-225 dated:
04.11.2022
29.12.2017
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-233 dated:
27.11.2022
03.01.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-237 dated:
17.03.2022
10.01.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-243 dated:
05.04.2022
16.01.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-249 dated:
28.12.2022
16.01.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-260 dated:
25.09.2022
27.01.2018
(To be revalidated every year
21.01.2023
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-266 dated:
03.02.2018
Vendor approval for supply of RCC (To be revalidated every year
poles for ongoing works only & valid
upto the completion of works awarded
where in RCC poles are already
sanctioned.
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-266 dated:
03.02.2018
Vendor approval for supply of RCC (To be revalidated every year
poles for ongoing works only & valid
upto the completion of works awarded
where in RCC poles are already
sanctioned.
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-279 dated:
28.06.2022
27.02.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-280 dated:
20.01.2023
01.03.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-293 dated:
29.06.2018
13.03.2018
(To be revalidated every year
21.03.2023
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-314 dated:
27.03.2018
Vendor approval for supply of RCC (To be revalidated every year
poles for ongoing works only & valid
upto the completion of works
awarded where in RCC poles are
already sanctioned.
20.03.2023
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-316 dated:
27.03.2018
(To be revalidated every year
12.04.2023
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-08 dated:
16.04.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-08 dated:
vendor approval for supply of RCC 16.04.2018
poles for ongoing works only & valid (To be revalidated every year
upto the completion of works
awarded where in RCC poles are
already sanctioned.
GM(QS&S)/DGM-4/BC-
11/18-19/ CYS-57 dated:
05.05.2023
25.06.2018
(To be revalidated every year
GM(QS&S)/DGM-4/BC-
11/18-19/ CYS-46 dated:
14.06.2020
15.06.2018
(To be revalidated every year
GM(QS&S)/DGM-3/BC-
11/18-19/ CYS-139 dated:
16.11.2020
22.11.2018
(To be revalidated every year
10.10.2023
GM(QS&S)/DGM-3/BC-
11/18-19/ CYS-141 dated:
22.11.2018
(To be revalidated every
Vendor approval for supply of RCC year)
poles for Self execution works &
ongoing works & valid upto the
completion of works awarded where
in RCC poles are already provided
GM(QS&S)/DGM-3/BC-
11/18-19/ CYS-151 dated:
08.11.2023 14.12.2018
(To be revalidated every
year)
Vendor approval validity and revalidation status:
M/s Kalleshwara
Concrete Products, 8Mtrs PSC poles -200kg WL
No.99, Avargere Igoor 9Mtrs PSC poles – 200kg WL
4 27.03.2022
Road, Igoor Village, 8Mtrs –PCC poles -140kg WL
Igoor Post, Davangere
9Mtrs –PSCC poles -300kg WL
Taluk Davangere
8Mtr/ 140kgs - PCC Poles
8&9 Mtr/200kgs - PSC poles
M/s Sree Industries,Sy
5 No.101/6, Hosahalli, 28.02.2022
Rangapura Road, Tiptur 9Mtr/300kgs- PSCC pole
8 Mtrs PCC/140kgs WL
GM(QS&S)/DGM-4/BC-11/16-
They have applied for
17/CYS-54
revaliation and file is under
dated:05.07.2016(subject to
process
Revalidation every year).
GM(QS&S)/DGM-4/BC-
11/16-17/ CYS-05
Revalidated upto 07.04.2019
dated:07.04.2017
(To be revalidated every year).
GM(QS&S)/DGM-3/BC-11/15-
16/CYS-162 Revalidated upto 14.03.2019
dated:27.02.2016(Subject to
Revalidaion every year)
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-187
dated16.11.2017
(To be revalidated every year)
GM(QS&S)/DGM-4/BC-11/16-17/
Applied for revalidation
CYS-17 dated:28.04.2017
25.10.2018
(To be revalidated every year).
GM(QS&S)/DGM-3/BC-11/15- 26.12.2018
16/CYS-152 GM(Q,S&S)DGM -4)/ BC-
dated:06.02.2016(Subject to 11/17-18/cys-226 dated:
Revalidaion every year) 29.12.2017
GM(QS&S)/DGM-4/BC-
11/17-18/ CYS-225 dated:
_
29.12.2017
(To be revalidated every year
BESCOM/GM(QS&S)DGM(El.,)-
3)/BC-11/15-16/Cys-63 dated:
14.08.2015
GM(QS&S)/DGM-4/BC-11/16-17/
Applied for revalidation and it
CYS-16 dated:28.04.2017
is under process