Presentation On Transmission Line Protection
Presentation On Transmission Line Protection
PHILOSOPHY OF PROTECTION
C. The transmission lines are the most widely spread part of the
power system and overhead lines are the least protected from
environmental influences.
1. SENSITIVITY
2. SELECTIVITY
3. SPEED
4. REPEATABILITY
5. ECONOMY
Relay
CB
DC
CT
CV
T Ckt-1 Ckt-2
ELEMENTS OF PROTECTION….(CONTD)
•Inputs to Relays
Diagnostic Equipment:
DRs
EL
FL
REQUIREMENT OF DISTANCE PROTECTION
E
ZS ZL
X X X X X
If
Fault current If = E/(ZS+ZL)
Conventional over-current protection may not be always
adequate for line protection as the reach of over current relay
is function of Source Impedance which varies considerably,
making it difficult to get fast and selective tripping.
X X X X X X
X
ZL1
F Load R
Short line
X
ZL1
F Load R
Long line
PRINCIPLES OF DISTANCE PROTECTION
Z2A
Z1A Fault
A Z1B
Z2B
B
CARRIER
RELAY RELAY
CHANNEL
CARRIER SCHEMES - P U R
Z2A
Z1A Fault
A Z1B
Z2B
B
RELAY CARRIER RELAY
Fault in Z1B= Trip CB B
Fault in Z2A+Signal Receipt
Fault in Z2B=Sends signal
= Trip breaker A + Send signal
CARRIER SCHEMES - P O R
Z2A
Z3A
Z1A Fault
Z1B Z3B
A Z2B
B
RELAY CARRIER RELAY
Z2A
Z3A
Z1A Fault
Z1B Z3B
A Z2B
B
RELAY CARRIER RELAY
Fault in Z2A+ Block signal recpt. = No Tripping Fault neither in Z1B nor in Z2B = No tripping
Fault in Z2A & not in Z3A = No block signal sent Fault in Z3B & not in Z2B= Send Block Signal
WEAK END FEED
• If the fault current in-feed is too low to operate the protection at the
week end, the following might occur, depending on the selected
communication scheme:
- In permissive overreach scheme, both CBs may fail to trip
instantaneously, due to no Carrier Send signal and no relay
operation in the weak end.
-In permissive under reach schemes fast fault clearance of
the whole line section will be lost , because no signal will be
sent from weak end.
-In blocking schemes or permissive under-reach schemes the
circuit breaker at the low in-feed end will fail to trip instantaneously.
WEAK END FEED LOGIC IN P.O.R
Z2A
Z1A Fault
Weak
End
A Z1B
Z2B
B
RELAY CARRIER RELAY
Fault in Z2A / UV relay + Receipt Fault in Z1B= Trip CB B
Of echo signal etc = Trip breaker A + Send echo signal Fault in Z2B=Sends Echo signal
FUSE FAILURE BLOCKING
X
Z3
Recoverable
Z2 Swing
Z1
Load
R Area
POWER SWING ---(Contd)
• Power Swings are disturbances in system due to various reasons
such as sudden load throw, bad synchronization etc
X
Z3
Z2 Power swing
detection zones
Z1
R
POWER SWING BLOCKING
• Power swings are detected by the fact that they are slow
in nature when compared to actual fault.