Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Table of Contents
Page 2 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
APPENDIX 2.10
TENDER DOCUMENT
Contract Amount :
(Rupees. in Figures) :
(Rupees. in Words) :
Stipulated Period of Completion : 12 Months (Twelve Months)
Page 3 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Ujjain Smart City Limited invites online Percentage cum Item rate tender, for 1st Phase of
Construction of Swimming Pool cum Commercial Complex Behind Municipal Corporation
Building at Ujjain, from experienced and reputed contractors for the following works. Tender
forms may be purchased online by the eligible contractors from 22 December 2017.
Key Dates
1. Pre-Bid Meeting : 08th Jan. 2018, 15:00 Hrs at
Smart City Office at Simhastha
Mela Karyalaya
2. Last date for Purchase of Tender : 29th Jan. 2018 till 17:00 Hrs.
3. Last Date for Online Submission of Tender : 29th Jan. 2018 till 17:30 Hrs.
4. Last Date for Submission of Hard Copy of : 30th Jan. 2018 till 17:00 Hrs.
Technical Bid and EMD
5. Technical Bid Opening (Online) : 30th Jan. 2018 at 17:30 Hrs.
Page 4 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
1. All details relating to the Bid Document(s) can be viewed and downloaded from the
website mentioned in NIT.
2. Bid document can be purchased after making online payment of portal fees through
Credit/Debit/Cash Card/internet banking.
3. At the time of submission of the Bid the eligible bidder shall be required to:
i) Pay the cost of Bid Document;
ii) Deposit the Earnest Money;
iii) Submit a check list; and
iv) Submit an affidavit.
Details can be seen in the Bid Data Sheet.
4. Eligibility for Bidders:
(a) At the time of submission of the Bid the bidder should have valid registration with
the Government of Madhya Pradesh, PWD in appropriate class. However, such
bidders who are not registered with the Government of Madhya Pradesh and are
eligible for registration can also submit their bids after having applied for
registration with appropriate authority.
(b) The bidder would be required to have valid registration with MPPWD in
appropriate class at the time of signing of the Contract.
(c) Failure to sign the contract by the selected bidder, for whatsoever reason, shall
result in forfeiture of the earnest money deposit.
Executive Director
Ujjain Smart City Ltd., Ujjain
Page 5 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
SECTION 2
A. GENERAL
1. SCOPE OF BID
The detailed description of work, hereinafter referred as ‘work’, is given in the Bid Data Sheet.
The details of various project components are as per the drawings attached herewith this
document and is mentioned in Section 5 of this Tender Document.
The successful bidder shall have to prepare ‘As Built Drawings’ after execution of work
depicting the exact construction carried out on site, in soft and hard copies.
5. COST OF BIDDING
The bidder shall bear all costs associated with the preparation and submission of his bid,
and no claim whatsoever for the same shall lie on the USCL.
Page 6 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
B. BID DOCUMENTS
7. CONTENT OF BID DOCUMENT
The Bid Document comprises of the following documents:
1. NIT.
2. Addendum, corrigendum if any
3. Instructions to Bidders,
i. Conditions of Contract: Part I General Conditions of Contract and Contract Data; and
ii. Part II Special Conditions of Contract.
4. Specifications
5. Drawings,
6. Priced Bill of Quantities
7. Technical and Financial Bid
8. Letter of Acceptance
9. Agreement and
10. Any other document(s), as specified.
8. The bidder is expected to examine carefully all instructions, conditions of contract, the
contract data, forms, terms and specifications, bill of quantities, forms and drawings in the
Bid Document. Bidder shall be solely responsible for his failure to do so.
9. PRE-BID MEETING
Wherever the Bid Data Sheet provides for pre-bid meeting:
9.1 Details of venue, date and time would be mentioned in the Bid Data Sheet. Any
Change in the schedule of pre-bid meeting would be communicated on the website
only, and intimation to bidders would not be given separately.
9.2 Any prospective bidder may raise his queries and/or seek clarifications in writing
before or during the pre-bid meeting. The purpose of such meeting is to clarify
issues and answer questions on any matter that may be raised at that stage. The
Employer may, at his option, give such clarifications as are felt necessary.
9.3 Responses to the prebid queries, corrigendum and addendums shall be uploaded
on website only.
9.4 Pursuant to the pre-bid meeting if the Employer deems it necessary to amend the
Bid Document, it shall be done by issuing amendment to the online NIT.
10. AMENDMENT OF BID DOCUMENTS
10.1 Before the deadline for submission of bids, the Employer may amend or modify
the Bid Documents by publication of the same on the website.
10.2 All amendments shall form part of the Bid Document.
10.3 The Employer may, at its discretion, extend the last date for submission of bids
by publication of the same on the website.
C. PREPARATION OF BID
11. The bidders have to prepare their bids online, encrypt their Bid Data in the Bid Forms and
submit Bid Seals (Hashes) of all the envelopes and documents related to the Bid required
to be uploaded as per the time schedule mentioned in the key dates of the Notice Inviting
e- Tenders after signing of the same by the Digital Signature of their authorized
representative.
Page 7 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Part 2 – This shall be known as Envelope B and required to be submitted only in works
where pre-qualification conditions and/or special eligibility conditions as stipulated in the
Bid Data Sheet are fulfilled. Online Envelope B shall contain a self-certified sheet duly
supported by documents to demonstrate fulfilment of pre-qualification conditions.
Part 3 – This shall be known as Online Envelope C and would apply to all bids. Envelope
C shall contain financial offer in the format prescribed enclosed with the Bid Data Sheet.
13. LANGUAGE
The bid as well as all correspondence and documents relating to the bid exchanged by the
Bidder and the Employer shall be in English or Hindi. Supporting documents and printed
literature that are part of the Bid may be in another language provided they are
accompanied by an accurate translation of the relevant passages in English. In such case,
for the purposes of interpretation of the bid, such translation shall govern.
14.2 All the documents/ information enclosed with the technical proposals should be self-
attested and certified by the Bidder. The Bidder shall be liable for forfeiture of his
earnest money deposit, if any document/ information are found false/fake/untrue
before acceptance of Bid. If it is found after acceptance of the Bid, the sanctioning
authority may at his discretion forfeit his performance security/guarantee, security
deposit, enlistment deposit and take any other suitable action.
D. SUBMISSION OF BID
18. The bidder is required to submit online bid duly signed digitally, and Envelope "A" in
physical form also at the place prescribed in the Bid Data Sheet.
19. PROCEDURE
19.1 Envelope ‘A’ shall be opened first online at the time and date notified and its
contents shall be checked. In cases where Envelope ‘A’ does not contain all
requisite documents, such bid shall be treated as nonresponsive, and Envelope “B”
and/or “C” of such bid shall not be opened.
19.2 Wherever Envelope ‘B’ (Technical Bid) is required to be submitted, the same shall
be opened online at the time and date notified. The bidder shall have freedom to
witness opening of the Envelope ‘B’. Envelope ‘C’ (Financial Bid) of bidders who
are not qualified in Technical Bid (Envelope ‘B’) shall not be opened.
19.3 Envelope ‘C’ (Financial Bid) of the qualified bidders shall be opened online at the
time & date notified. The bidder shall have freedom to witness opening of the
Envelope ‘C’.
19.4 After opening Envelope ‘C’ all responsive bids shall be compared to determine the
lowest evaluated bid.
19.5 The Employer reserves the right to accept or reject any bid, and to annul the biding
process and reject all the bids at any time prior to contract award, without incurring
any liability. In all such cases reasons shall be recorded.
19.6 The Employer reserves the right of accepting the bid for the whole work or for a
distinct part of it.
20. CONFIDENTIALITY
20.1 Information relating to examination, evaluation, comparison and recommendation
of contract award shall not be disclosed to bidders or any other person not officially
concerned with such process until final decision on the bid.
20.2 Any attempt by a bidder to influence the Employer in the evaluation of the bids or
contract award decisions may result in the rejection of its bid.
Page 9 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
F. AWARD OF CONTRACT
21. AWARD OF CONTRACT
The Employer shall notify the successful bidder by issuing a ‘Letter of Acceptance’
(LOA) that his bid has been accepted.
22. PERFORMANCE SECURITY
22.1 Prior to signing of the Contract, the bidder to whom LoA. has been issued shall have
to furnish Performance Security of the amount, form and duration, etc. as specified
in the Bid Data Sheet.
22.2 Additional Performance Security, if applicable, is mentioned in the Bid Data Sheet
and shall be in the form and for the duration etc. similar to Performance Security.
22.3 50% Performance security shall be released after the issuance of the completion
certificate of the work.
22.4 Remaining 50% shall be released after successful completion of O&M period of 5
years.
Executive Director
Envelope-A
6 Ujjain Smart City Ltd., Mela Karyalaya, Kothi Road,
should reach in physical
Ujjain (MP), India, Pin - 456 010.
form to
Page 11 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Page 12 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – A
Earnest money deposit and affidavit shall be submitted by the bidder so as to reach the office as
prescribed in Bid Data Sheet, before specified start time and date of opening of technical proposal
as per key dates in Bid Data Sheet.
Page 13 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – B
(See clause 3 of Section 1-NIT)
││AFFIDAVIT ││
I/we are fully responsible for the correctness of following self-certified information/ documents
and certificates:
1. That the self-certified information given in the bid document is fully true and authentic.
2. That:
a. Term deposit / Demand Draft / Bank Guarantee submitted as Earnest Money
Deposit, and other relevant documents provided by the Bank are authentic.
b. Information regarding financial qualification and annual turn-over is correct.
c. Information regarding various physical qualifications is correct.
3. No close relative of the undersigned and our firm/company is working in the department.
OR
Following close relatives are working in the department:
Name Post Present Posting
Page 14 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – C
PRE-QUALIFICATIONS CRITERIA
(Technical Bid evaluation)
A) The bidder should have an Average Annual Financial Turnover for Construction
Works not less than 50% of the probable amount of contract during last 3 financial
years.
B) The bidder should have experience of having successfully executed the following:
a. Three Work of similar nature each costing not less than amount equal to 20% of
the probable amount of the contract during last 3 financial years; or
b. Two Work of similar nature each costing not less than amount equal to 30% of the
probable amount of the contract during last 3 financial years; or
c. One Work of similar nature costing not less than amount equal to 50% of the
probable amount of the contract during last 3 financial years;
ANNEXURE – D
(See Clause 6 of Section 1 NIT)
The bidder should have successfully completed and executed at least one swimming pool of
Olympic size (50m.Length) with all peripheral systems of filtration, disinfection, recirculation
etc. complete including all electrification and plumbing during the preceding Five years:
Page 15 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – E
(See clause 2 of Section 2-ITB & Clause 10 of GCC)
SPECIFICATIONS
I. CIVIL WORKS
The works in General shall be carried out as per latest MP-UADD Specifications, (updated with
corrections slips issued up to last date of submission of tender) unless otherwise specified in the
nomenclature of the individual item or in the particular specifications of concerned items of
works.
For items not covered under MP-UADD specifications with correction slips or those
specifications that are not given in the technical specifications appended or not incorporated in
the nomenclature of the individual item, all Civil, Electrical and Plumbing works shall be done as
per following specifications or as per approval of Engineer-in-charge:
1. MP UADD Specification
2. MP PWD Department Specifications,
3. National Building Code (NBC) Standards
4. IRC Specifications
5. UTIPEC Road Design Specifications
6. CPWD Specifications
7. MoRTH Specifications as per 5th revision
8. CPHEEO Manuals (W/S and Sewerage & Drainage)
i. All the works shall be executed as per the approved drawings / designs. The patterns
shown in the tender drawings can be modified as per the site requirements by the
Engineer- in-charge and nothing extra whatsoever shall be payable over and above the
quoted rates.
ii. Material should be of the best approved quality obtainable and they shall comply with the
respective Indian Standard Specifications. Samples of all materials shall be got approved
before placing order and the approved sample shall be deposited with the Client/Engineer
In-Charge.
iii. Only ISI mark 43 grade Ordinary Portland Cement of relevant I.S. specifications shall be
used for the work. Any lot of cement brought to site by the contractor would be permitted
to be used in the work only after the satisfactory results are received, of the requisite tests
under the supervision of the EngineeMORTHr-In-Charge or his authorized
representative.
iv. Crushing Unit and Batching plant- The crushing unit should be capable of producing
particles which are equi-dimensional or cubicle in shape conforming to the grading
requirement. For this purpose, typical two stage crusher configuration of jaw primary
crusher and a cone secondary crusher will be obligatory. In the batching plant, as per the
applicable specifications, the aggregates shall pass through screening unit to separate
them into different sized fractions and deposit them on bins as per specifications.
v. GSB & CRM: Disintegrated rock (Moorum) for the items of GSB and Crusher Run
Macadam shall not be used by the Contractor.
vi. The contractor shall submit test certificate in the Performa prescribed / approved by B.I.S.
Page 16 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
from the manufacturer for every batch of steel brought to the work site.
vii. The surface regularity of the completed sub-grade, sub-base, base course and widening
of surfaces in longitudinal and transverse direction shall be within the tolerance limit
indicated in Table 900-1, Clause 902.
viii. The provisions of general / special conditions of contract, those specified elsewhere in
the Bid-Document, as well as execution drawings and notes, or other specifications
appended in Tender Document or issued in writing by the Employer shall form part of
the technical specifications of this work.
ix. General specifications on type, material, construction and quality of HDPE pipe ducts
meant for laying of various utility services of power supply and telecom (OFC) services,
specifications shall be referred from the documents as above from serial no. 1 to 8:
1. FILTRATION PLANT
Totally anti-corrosive bobbin wound sand filter 2000 mm dia. manufactured with fibre glass and
polyester resin, fitted with collector arms and diffuser made from un-plasticised PVC and
Polypropylene. Filter media height -1000mm and capable of accommodating flow rate of 93.6
M³/hr @ 30m³/hr/m² Complete with lid in polyester resin and fibre glass for media charging, 2
No. pressure Gauges & associated tubing, manual air release valve, purge cap for sand discharge
and 140 PVC flanged connection for inlet and outlet.
Suggested Makes: Astral, Spain Code: 00706
3. FILTER MEDIA
a. Quartz Filter Media mesh size 16 /32
b. Quartz Filter Media mesh size 8 / 16
Make: Feather tuff/ Eq.
4. RECIRCULATING PUMPS
Horizontal monoblock recirculation pumps with body, pot type pre-filter, and support in Cast
iron, impeller in Bronze, shaft in SS, mechanical seal and pre-filter basket in AISI- 16 stainless
steel. And with motor -3000rpm/1500 rpm, 3 PH, 400/400V, 10 HP, 50HZ, protection IP-54.
Flow: 15 M³/hr. @ 10.0m head (3 No. W + 1 No. SB)
Make: Pumps - Astral Pool Spain/ Eq.
Page 17 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
consist of Ammeter, Volt meter, Selector Switch, Single phase preventer etc. Cost should be
included in the cost of M.C.C. etc. complete.
Make: Feather tuff / Eq.
All valves shall be in UPVC with PN10 rating and EPDM seat.
INTERCONNECTING PIPING
Page 19 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
28. SS LEADER
SS 316 SS Leader in 43 mm / 14 G Pipe with Flat Step Trades
4 Step Ladder
5 Step Ladder
6 Step Ladder
Make: Astral / Feather tuff/Eq.
Page 21 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Page 22 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Page 23 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
The works in General shall be carried out as per latest MP-UADD Electrical Specifications,
(updated with corrections slips issued up to last date of submission of tender) unless otherwise
specified in the nomenclature of the individual item or in the particular specifications of concerned
items of works.
Recommended makes for the items are as follows:
Page 24 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Note:
Bidders are requested to visit our e-tendering website regularly for any clarifications
and/or due date extension or corrigendum.
Bidder must positively complete online e-tendering procedure at www.mpeproc.gov.in
USCL shall not be responsible in any way for delay/difficulties/ inaccessibility of the
downloading facility from the website for any reason whatsoever.
In case, due date for submission & opening of tender happens to be a holiday, the due
date shall be shifted to the next working day for which no prior intimation will be given.
USCL reserves the right for extension of due date of opening of technical bid.
Page 25 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE-G
(See clause 4 of Section 2-ITB)
Not Applicable
Page 26 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE-H
(See clause 12 of Section 2 ITB& clause 4 of GCC)
ORGANIZATIONAL DETAILS
(To be enclosed with technical proposal)
2. Valid registration of Bidder in appropriate class through (Scanned copy of Registration to be uploaded)
centralized registration of Govt. of MP Registration
no………………. date……….
3. Name of Organization/ Individual
4. Entity of Organization
Individual/Proprietary Firm/Partnership Firm (Registered
under Partnership Act)/ Limited Company (Registered
under the Companies Act– 1956)/ Corporation
5. Address of Communication
6. Telephone Number with STD Code
7. Fax Number with STD Code
8. Mobile Number
9. E-mail Address for all communications
Details of Authorized Representative
10. Name
11. Designation
12. Postal Address
13. Telephone Number with STD Code
14. Fax Number with STD Code
15. Mobile Number
16. E-mail Address
Note: In case of partnership firm and limited company certified copy of partnership deed/
Articles of Association and Memorandum of Association along with registration certificate
of the company shall have to be enclosed.
Page 27 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – I
(See clause 14 of Section 2 of ITB)
Note:
1. Technical Proposal should be duly page numbered and indexed.
2. Technical Proposal should be uploaded on website www.mpeproc.gov.in, otherwise will
not be considered.
Page 28 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – I (FORMAT: I -
1)
(See clause 14 of Section 2 of ITB)
Page 29 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – I (FORMAT: I - 2)
(See clause 14 of Section 2 of ITB)
Financial Information
Financial Year 2014-15 2015-16 2016-17
Annual Turnover (in INR Crore)
Page 30 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – I (FORMAT: I - 3)
(See clause 14 of Section 2 of ITB)
The Contractor will have to appoint the following key personnel during the
execution and entire contract period, apart from other key personnel and support
staff as necessary.
S. Details Penalty to be
No. computed on
Per Month basis
1 Project Manager with Master’s degree in Civil Engineering having Rs. 65,000/- p.m.
minimum relevant post qualification experience of 10 years
2 MEP Engineer with degree in Electrical Engineering and 10 yrs Rs. 65,000/- p.m.
working experience
3 Site Engineer with Degree/Diploma in Civil Engineering having Rs. 45,000/- p.m.
minimum 5(for Degree holders) / 7 (for Diploma holders) years of
experience
Page 31 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – I (FORMAT: I - 4)
The contractor shall arrange to provide fully furnished and adequately equipped field
laboratory with adequate qualified technical staff. Preferably located adjacent to the Project
Office and provided amenities like water supply, electric supply etc.
The laboratory equipment shall confirm I.S. specifications and MOST / MORTH
specifications. The Contractor shall carry out the calibration of the instruments as directed
by the Engineer
– in- Charge on expiry date of calibration. On completion of work in all respect, the
equipment will be the sole property of the contractor.
It shall be considered as incidental to the work, and no extra payment will be made, what
so ever, will not be made for the same.
Page 32 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – I (FORMAT: I - 5)
(See clause 14 of Section 2 of ITB)
Bidders to furnish details of minimum requirement in the format given below for the Work:
S. Name of Equipment/ Min Details of Equipment/ Quantity Available
No. Machinery Quantity Machinery Available with
Required the bidder
1 JCB/Excavator 1
Dumpers
2 2
Pin Vibrator
3 3
4 Plate vibrator 2
The successful bidder within 45 days from date of issue of work order shall submit request
to the Engineer in charge for inspection of RMC plant conforming to M.O.R.T.&H.
specification (located within 30 Km. from the city limits) and machinery. If the bidder does
not have their own RMC Plant, then he shall submit the notarized agreement with the plant
owner that the plant owner is ready to supply him the RMC for this work.
Page 33 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
After Inspection, Engineer In charge may accept the request as it is or instruct for some
changes if required in the plant and/or machinery which shall be carried out by the contractor
at this own cost. Only after its approval by the Engineer - in - Charge, the contractor shall
carry out work from the approved RMC plant and machinery.
Page 34 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – J
(See clause 14 of Section 2 of ITB)
FINANCIAL BID
NAMEOFWORK:
(Name of the work as appearing in the bid for the work)
I/We do hereby BID to execution of the above work within the time specified at the rate (In figures)
(In words) percent below / above or at
par based on the Bill of Quantities and item wise rates given therein in all respects and in accordance
with the specifications, designs, drawings and instructions in writing in all respects in accordance
with such conditions so far as applicable.
I/We have visited the site of work and am/are fully aware of all the difficulties and conditions likely
to affect carrying out the work. I/We have fully acquainted myself/ourselves about the conditions in
regard to accessibility of site and quarries/kilns, nature and the extent of ground, working conditions
including stacking of materials, installation of tools and plant conditions effecting accommodation
and movement of labour etc. required for the satisfactory execution of contract.
Should this bid be accepted, I/We hereby agree to abide by and fulfil all the terms and provisions of
the said conditions of contract annexed hereto so far as applicable, or in default thereof to forfeit and
pay to the Executive Director, Ujjain Smart City Limited, Ujjain or his successors in office the sums
of money mentioned in the said conditions.
Note:
Only one rate of percentage above or below or at par based on the Bill of Quantities and item
wise rates given therein shall be quoted.
Percentage shall be quoted in figures as well as in words. If any difference in figures and
words is found lower of the two shall be taken as valid and correct rate. If the bidder is not
ready to accept such valid and correct rate and declines to furnish performance security and
sign the agreement his earnest money deposit shall be forfeited.
In case the percentage “above” or “below” is not given by a bidder, his bid shall be treated
as non-responsive.
All duties, taxes, and other levies payable by the bidder shall be included in the percentage
quoted by the bidder.
Signature of
Bidder Name
of Bidder
The above bid is hereby accepted by me on behalf of the Executive Director, UJJAIN Smart City
Ltd., Ujjain, dated the day of 20_ _
Page 35 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – K
(See clause 15 of Section 2 of ITB)
Not Applicable
Page 36 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – L
(See clause 21 of Section 2 of ITB)
Dated:
LETTER OF ACCEPTANCE (LOA)
No.
M/s.
Subject:
(Name of the work as appearing in the bid for the work)
Your bid for the work mentioned above has been accepted on behalf of the (Name of Authority), at
your bided offer as per scope of work given therein. You are requested to submit within 15 (Fifteen)
days from the date of issue of this letter:
Please note that the time allowed for carrying out the work as entered in the bid is
months including/excluding rainy season, shall be reckoned from the date of signing the contract
agreement.
Signing the contract agreement shall be reckoned as intimation to commencement of work and no
separate letter for commencement of work is required. Therefore, after signing of the agreement, you
are directed to contact Engineer-in-charge for taking the possession of site and necessary instructions
to start the work.
Yours faithfully,
EXECUTIVE DIRECTOR
Page 37 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – M
(See clause 22 of Section 2 of ITB)
PERFORMANCE SECURITY
To
[Name of Employer]
[Address of Employer]
Authority
Date
* An amount shall be inserted by the Guarantor, representing the percentage the Contract Price
specified in the Contract including additional security for unbalanced Bids, if any and denominated
in Indian Rupees.
Page 38 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
SECTION 3
Conditions of Contract
Part – I: General Conditions of Contract
[GCC] Table of Clauses of GCC
Page 39 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
A. GENERAL
1. DEFINITIONS
1.1 “Bill of Quantities” means the priced and completed Bill of Quantities forming part of the Bid.
1.2 “Executive Director” means the executive officer as defined under the relevant section of the
article of association;
1.3“Completion “means completion of the work, as certified by the Engineer-in-Charge, in
accordance with provisions of agreement.
1.4 “Contract” means the Contract between the Employer and the Contractor to execute, complete
and/or maintain the work. Agreement is synonym of Contract and carries the same meaning wherever
used.
1.5 “Contract Data Sheet” means the documents and other information which comprise of the
Contract.
1.6 “Contractor “means a person or legal entity whose bid to carry out the work has been accepted
by the Employer.
1.7 “Contractor's bid” means the completed bid document submitted by the Contractor to the
Employer.
1.8 “Contract amount” means the amount of contract worked out on the basis of accepted bid.
1.9 “Completion of work” means completion of the entire contracted work. Exhaustion of quantity
of any particular item mentioned in the bid document shall not imply completion of work or any
component thereof.
1.10 “Day” means the calendar day.
1.11 “Defect” means any part of the work not completed in accordance with the specifications
included in the contract.
1.12 “Drawings” means drawings including calculations and other information provided or approved
by the Engineer-in-Charge.
1.13 “Department” means Ujjain Smart City Limited, Ujjain as the case may be.
1.14 “Employer” means the party as defined in the Contract Data, who employs the Contractor to
carry out the work. The employer may delegate any or all functions to a person or body nominated
by him for specified functions. The word Employer/Government/Department wherever used denote
the Employer.
1.15 “Engineer” means the person named in contract data sheet.
1.16 “Engineer in charge” shall means the PDMC/PMC/ consultant appointed by authority to
supervise the work as a whole i.e., Quality control Supervision and Management of work.
1.17 “Equipment” means the Contractor's machinery and vehicles brought temporarily to the Site for
execution of work.
1.18 “Executive Director” means the executive director of the Board as appointed under the
provision of the article of association;
1.19 “Government” means Government of Madhya Pradesh.
1.20 “In Writing” means communicated in written form and delivered against receipt.
1.21 “Material” means all supplies including consumables used by the Contractor for incorporation
in the work.
1.22 “Stipulated date of completion” means the date on which the Contractor is required to
complete the work. The stipulated date is specified in the Contract Data.
1.23 “Specification” means the specification of the work included in the Contract and any
Page 40 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
1.24 “Start Date “means the date 14 days after the signing of agreement for the work. However, the
employer may extend this time limit by another 14 days, as and when required.
1.25 “Sub-Contractor” means a person or corporate body who has a Contract (duly authorized by the
employer) with the Contractor to carry out a part of the construction work under the Contract.
1.26 “Temporary Work” means work designed, constructed, installed, and removed by the
Contractor that are needed for construction or installation of the work.
1.27 “Tender/Bid, Tenderer/Bidder” are the synonyms and carry the same meaning where ever used.
1.28 “Variation “means any change in the work which is instructed or approved as variation under
this contract.
1.29 “Work” the expression “work" or "works” where used in these conditions shall unless there be
something either in the subject or context repugnant to such construction, be construed and taken to
mean the work by virtue of contract, contracted to be executed, whether temporary or permanent and
whether original, altered, substituted or additional.
1.30 “Work Plan” means the implementation plan, including phasing of works, physical completion
milestones and other such details that the Employer shall seek from time to time with respect to
tracking progress of the works.
2. SCOPE OF PROJECT
2.1 Scope of the Project
Under this Agreement, the scope of the Project (the “Scope of the Project”) shall mean and include:
(a) Construction of Olympic size Swimming Pool (25m. x 50m.) with Kids Pool (12m. x 10m.)
including all plumbing, pumping & filtration units and electrical works complete including Open Air
Sitting & Service Area, Swimmers Block, Facade Wall, Dismantling and Restoration of Existing
Structures, external development including creation of Natural Pool with Landscaping & Approach
Road with side drains, Sports & Gym cum Admin Block and Compound Wall.
(b) Under this tender Scope of work of contactor also includes Maintenance of Tendered works for
Period of Five years as per Agreement and inconformity to the Client’s requirements with Preparation
of As Built Drawings after completion of the project work.
(c) Performance and fulfilment of all other obligations of the Contractor in accordance with the
provisions of this Agreement and matters incidental there to or necessary for the performance of any
or all of the obligations of the Contractor under this Agreement.
(d) If due to any unavoidable circumstances, it needs to shift the location of project partly or fully,
the contractor shall carry out the work partly or fully at another alternative location without any extra
claim. The expenditure towards preliminary activities if carried out by the contractor shall be
reimbursed by USCL. (Actual expenditure or payment shown in Schedule of Payment-pre-
construction activities-as per stage of work carried out by the contractor whichever is less).
(e) Scope of work contained in the paragraphs mentioned below is only indicative and not
exhaustive. In addition, the contractor shall be responsible for executing all items required for
completing the work as per direction of Engineer-in-charge. The price quoted shall include all the
items and covers all details as may be required to meet the purpose and intents of the contract.
(f) The scope of work is not limited only as mentioned in above paras, but also include to address
any exigency generated during tendered work execution and no extra cost shall be paid for the same.
(g) No extra payment shall be paid for time overrun.
Page 41 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
a) Contractors are requested to visit the site prior to fill/submit the tender and check all the necessary
attributes/matters related for completion of this project.
b) All the activities required to be carried out for successful and timely completion of this project
shall be carried out by the successful contractor
2.2.2 (A) DETAIL SCOPE OF WORK CIVIL COMPONENTS:
The works under Contract comprises the construction of swimming pool with all peripheral systems
like Filtration unit, pool water disinfection unit, recirculation system including all pumbing and
electrification completed as per the given drawings and specifications as prescribed by Mentioned IS
Codes, UADD, MPPWD, MoRTH specifications unless otherwise specified including Operation and
Maintenance of Tendered works for Period of Five years
It is in the scope of the successful bidder to carefully read & study and understand fully the relevant
drawings of the all the project components in case of any confusion he or his representative can
clear doubts relating to specifications of prescribed works, dimensions of drawings or any project
related works. It is also in the scope of the successful bidder to bring into the notice of the Engineer
incharge of the client or his representative any ambiguity in project related drawings or related
matter for its rectification well before or during the commencement of the work.
After the completion of the project work, the successful bidder shall have to prepare and submit ‘As
Built Drawings’ depicting the exact construction carried out on site, in soft and hard copies.
Statutory and other charges for getting various required approvals shall be in scope of Successful
bidder
The scope of work also includes:
2.2.3 Construction and completion of the following:
2.2.3.1 Site clearance, demolition works, earthworks, temporary works, traffic diversion,
barricading the construction site, utility shifting and all ancillary works deemed
necessary for the carrying out of temporary & permanent construction works.
2.2.3.2 Widening/ re-cambering/ raising/ milling down & overlaying of existing carriageways,
flexible/ rigid pavement at grade road intersections & accesses to adjoining
developments.
2.2.3.3 Tree cutting (if any) as indicated in the drawings.
2.2.3.4 Construction of Utility ducts, cross drains as per approved drawing.
2.2.3.5 Installing RPM, making road markings along the road edge, road centre line & as per
IRC guidelines, bus stop marking, cycle track marking, construction of medians &
speed breakers, & junction improvements as per the drawings & in accordance with
the Employer’s requirements and to the satisfaction of the Engineer in charge.
2.2.3.6 Construction of footpaths, kerbs, railings, vehicular impact guardrails and other road
related facilities as per the guidelines of IRC in accordance with the Employer’s
requirements and to the satisfaction of the Engineer in charge.
2.2.3.7 Supply and installation of new traffic signage, directional signage, street name signs
& re- sitting of such existing signs & other road signs to be retained, inclusive of
support & foundation as per Employers Requirement.
2.2.3.8 Supply and installation of new Electric poles and light fittings as per approved
Drawings and as per Employers Requirement.
2.2.3.9 All other works and services ancillary or related to the full completion of the Works in
accordance with the Employer ‘s requirements
2.2.4 The Contractor shall ascertain, determine and verify the locations of all utility services in the
Page 42 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
vicinity of the Works, and co-ordinate with utility agencies for the diversion of affected
services and the laying of new services. The Contractor shall support and protect services that
need not be diverted or pending diversion and remove all abandoned services. Contractor shall
be responsible for relocation, reconstruction, reconfiguration of driveways, site accesses,
temporary and permanent drains, pipe conduits and necessary connections for public lighting
and traffic lighting, earth works, turfing, environmental assessments, necessary safety
measures and protection works, sewer lines etc, if any affected by the project work.
2.2.5 In case any permission is required or any exigency generated relating to government
clearances, during project execution phase, the Contractor will have to take the responsibility
for the same including the submissions to relevant government authorities / technical
departments for obtaining all necessary clearances/approvals. The Client will render all
necessary administrative support to the Contractor in the same.
2.2.6 The Contractor shall co-ordinate and interfaces his works with that of all other contractors,
subcontractors, utility services, statutory authorities, etc. and achieve the completion of the
Works to the satisfaction of the Engineer
2.2.7 The Contractor shall verify the proposed road reserve, cadastral boundary and contract
boundary and all dimensions on Site prior to submission of Tender. The Contractor is
responsible for clarifying any discrepancy between the Drawings and actual condition on
Site.
2.2.8 The Contractor shall make good all works including road surfaces, drains, concrete works,
gratings, kerbs, pavements, turfing, railing, fence, boundary wall, etc. affected or damaged
during the course of construction, to the satisfaction of the Engineer. The costs of making
good all these defects shall be borne solely by the Contractor and deemed included in his
Contract Sum
2.2.9 All works specified shall include the provision of all labour, tools, equipment, material,
traffic control, transport and everything else necessary for the satisfactory completion of the
Work by the Contractor to the satisfaction of the Engineer.
2.2.10 Construction management and the quality of the works shall comply with the drawings,
specification and employer’s requirement.
a) The contractor shall produce samples of the materials for approval of the Engineer in charge
(EIC). The materials of the makes, out of the above as approved by the EIC shall be used on the
work.
b) In respect of materials for which makes are not specified, the make/brand will be decided by the
EIC.
c) Before bulk purchase of quantities of materials, it is the responsibility of the Contractor to get
the samples of materials approved from consultant and EIC or his representative.
Page 43 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
COMMUNICATIONS
All certificates, notice or instruction to be given to the Contractor by Employer/Engineer shall be sent
on the address or contact details given by the Contractor in [Annexure H of ITB]. The address and
contract details for communication with the Employer/Engineer shall be as per the details given in
Contract Data Sheet. Communication between parties that are referred to in the conditions shall be in
writing. The notice sent by facsimile (fax) or other electronic means (email) shall also be effective on
confirmation of the transmission. The notice sent by registered post or speed post shall be effective on
delivery or at the expiry of the normal delivery period as undertaken by the postal service. In case of
any change in address for communication, the same shall be immediately notified to Engineer-in-
Charge
3. SUBCONTRACTING
Subcontracting shall be permitted for contracts value more than amount specified in the Contract
Data with following conditions.
a. The Contractor may subcontract up to 25 percent of the contract price, only with and after the
approval of the Employer in writing, but will not assign the Contract. Subcontracting shall not
Page 44 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
4. PERSONNEL
4.1 The Contractor shall employ for the construction work and routine maintenance the
technical personnel as provided in the Annexure I-3 of Bid Data sheet, if applicable. If the
Contractor fails to deploy required number of technical staff, recovery as specified in the
Contract Data will be made from the Contractor.
4.2 If the Engineer asks the Contractor to remove a person who is a member of the Contractor's
staff or work force, stating the reasons, the Contractor shall ensure that the person leaves
the Site within three days and has no further connection with the Works in the Contract.
5. FORCE MAJEURE
5.1 The term "Force Majeure" means an exceptional event or circumstance:
a) Which is beyond a party’s control,
b) Which such party could not reasonably have provided against before entering into the
contract,
c) Which, having arisen, such party could not reasonably have avoided or overcome,and
d) Which is not substantially attributed to the other Party
Force Majeure may include, but is not limited to, exceptional events or circumstances of
the kind listed below, so long as conditions (a) to (d) above are satisfied:
(i) War, hostilities (whether war be declared or not), invasion, act of foreign enemies),
(ii) Rebellion, terrorism, sabotage by persons other than the contractor’s Personnel,
revolution, insurrection, military or usurped power, or civil war,
(iii) Riot, commotion, disorder, strike or lockout by persons other than the Contractor’s
Personnel,
(iv) Munitions of war, explosive materials, ionizing radiation or contamination by radio
activity, except as may be attributed to the Contractor’s use of such munitions,
explosives, radiation or radio activity, and
(v) Natural catastrophes such as earthquake, hurricane, typhoon or volcanic activity,
5.2 In the event of either party being rendered unable by force majeure to perform any duty or
discharge any responsibility arising out of the contract, the relative obligation of the party
affected by such force majeure shall upon notification to the other party be suspended for
the period during which force majeure event lasts. The cost and loss sustained by either
party shall be borne by respective parties.
5.3 For the period of extension granted to the Contractor due to Force Majeure the price
adjustment clause shall apply but the penalty clause shall not apply. It is clarified that this
sub clause shall not give eligibility for price adjustment to contracts which are otherwise
not subject to the benefit of Price adjustment clause.
5.4 The time for performance of the relative obligation suspended by the force majeure shall
stand extended by the period for which such cause lasts. Should the delay caused by force
majeure exceed twelve months, the parties to the contract shall be at liberty to foreclose the
Page 45 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
6. CONTRACTOR'S RISKS
6.1 All risks of loss of or damage to physical property and of personal injury and death which
arise during and in consequence of the performance of the Contract are the responsibility of
the Contractor.
6.2 All risks and consequences arising from the inaccuracies or falseness of the documents
and/or information submitted by the contractor shall be the responsibility of the Contractor
alone, notwithstanding the fact that designs/drawings or other documents have been
approved by the department.
9. DISCOVERIES
Anything of historical or other interest or of significant value unexpectedly discovered on the Site
shall be the property of the Employer. The Contractor shall notify the Engineer of such discoveries
and carry out the Engineer's instructions for dealing with them.
Page 46 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
10.6 The contractor shall have to continue execution of the works with due diligence
notwithstanding pendency of a dispute before any authority or forum.
B. TIME CONTROL
11. PROGRAMME
11.1 Within the time stated in the Contract Data, the Contractor shall submit to the Engineer for
approval a Programme showing the general methods, arrangements, order, and timing for
all the activities in the Works for the construction of works.
11.2 The program shall be supported with all the details regarding key personnel, equipment and
machinery proposed to be deployed on the works for its execution. The contractor shall
submit the list of equipment and machinery being brought to site, the list of key personnel
being deployed, the list of machinery/equipment being placed in field laboratory and the
location of field laboratory along with the Programme
11.3 An update of the Programme shall be a Programme showing the actual progress achieved
on each activity and the effect of the progress achieved on the timing of the remaining
Works, including any changes to the sequence of the activities.
11.4 The Contractor shall submit to the Engineer for approval an updated Programme at
intervals no longer than the period stated in the Contract Data. If the Contractor does not
submit an updated Programme within this period, the Engineer may withhold the amount
stated in the Contract Data from the next payment certificate and continue to withhold this
amount until the next payment after the date on which the overdue Programme has been
submitted.
11.5 The Engineer's approval of the Programme shall not alter the Contractor's obligations
12.3 In case of the work already in progress, the contractor shall proceed with the execution of the
works, including maintenance thereof, pending receipt of the decision of the competent
authority as aforesaid with all due diligence.
Page 47 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
C. QUALITY CONTROL
15. TESTS
D. COST CONTROL
Page 48 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
a. The contractor is bound to carry out the additional (Extra quantity), work at the same
rates as are specified in the contract for the work.
b. If the item is not in the priced BOQ and is included in the SOR of the department, the
rate shall be arrived at by applying the quoted tender percentage on the SORrate.
c. If the rates of the altered or substituted work are not provided in applicable SOR-such
rates will be derived from the rates for a similar class (type) of work as is provided in
the contract (priced BOQ) for the work.
d. If the rates are for the altered, substituted work cannot be determined in the manner
specified in the sub clause (c) above-then the rates for such composite work item shall
be worked out on the basis of the concerned schedule of rates minus/plus the percentage
quoted by the contractor.
e. If the rates of a particular part or parts of the item is not in the schedule of rates and the
rates for the altered, or substituted work item cannot be determined in the manner
specified in sub clause (b) to (d) above, the rate for such part or parts will be determined
by the Competent Authority as defined in the Contract data on the basis of the rate
analysis derived out of prevailing market rates when the work was done.
f. But under no circumstances, the contractor shall suspend the work on the plea of non-
acceptability of rates on items falling under sub clause (a) to (d). In case the contractor
does not accept the rate approved by Engineer in charge for a particular item, the
contractor shall continue to carry out the item at the rates determined by the Competent
Authority. The decision on the final rates payable shall be arrived at through the dispute
settlement procedure.
carried out, the Engineer in charge shall give notice in writing of the fact to the Contractor
and withdraw that whole or any part of the work.
20.2 The Contractor shall have no claim to any payments or compensation whatsoever, on account
of any profit or advantage which he might have derived from the execution of work in full or
on account of any loss incurred for idle men and machinery due to any alteration or restriction
of work for whatsoever reason.
20.3 The Engineer in charge may supplement the work by engaging another agency to execute such
portion of the work, without prejudice to his rights.
c) The department shall, further have an additional right to effect recoveries as arrears of land
revenue under the M.P. Land revenue Code.
23. TAX
23.1 The rates quoted by the Contractor shall be deemed to be inclusive of the commercial tax
and other levies, duties, cess, toll, taxes of Central and State Governments, local bodies
and authorities.
23.2 Rates quoted by the contractor shall be excluding GST. GST shall be payable as
applicable at the time of billing by the authority.
23.3 The liability, if any, on account of quarry fees, royalties, octroi and any other taxes and
duties in respect of materials actually consumed on public work, shall be borne by the
Contractor.
23.4 Any Changes in the taxes excluding GST due to change in legislation or for any other
reason shall not be payable to the contractor.
25.2 The Engineer in charge shall be entitled to terminate the contract if the Contractor
a. Abandons the works or otherwise plainly demonstrates the intention not to continue
performance of his obligations under the contract;
b. the Contractor is declared as bankrupt or goes into liquidation other than for approved
reconstruction or amalgamation;
c. without reasonable excuse fails to comply with the notice to correct a particular defect
within a reasonable period of time;
d. the Contractor does not maintain a valid instrument of financial Security, as prescribed;
e. the Contractor has delayed the completion of the Works by such duration for which
the maximum amount of liquidated damages is recoverable;
f. If the Contractor fails to deploy machinery and equipment or personnel or set up a
field laboratory as specified in the Contract Data.
g. if the Contractor, in judgmental of the engineer in charge has engaged in corrupt or
fraudulent practices in competing for or in executing the contract;
h. Any other fundamental breaches as specified in the Contract Data.
25.3 In any of these events or circumstances, the engineer in charge may, upon giving 14 days’
notice to the contractor, terminate the contract and expel the Contractor from the site.
However, in the case of sub paragraph (b) or (g) of clause 27.2, the Engineer in charge
may terminate the contract immediately.
25.4 Notwithstanding the above, the Engineer in charge may terminate the contract for
convenience by giving notice to the contractor.
26.2 Payment on termination under clause 27.4 above, the Engineer shall issue a certificate for
the value of the work done, the reasonable cost of removal of Equipment, repatriation of
the contractor’s personnel employed solely on the works, and the contractor’s costs of
protecting and securing the works and less advance payments received up to the date of the
certificate, less other recoveries due in terms of the contract and less taxes due to be
deducted at source as per applicable law.
26.3 If the total amount due to the Employer exceeds any payment due to the Contractor, the
difference shall be recovered as per clause 24 above.
Page 51 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
defect liability period (DLP is 1 years in this project) and remaining amount shall be paid
in two equal instalments after 6 months interval.
29.1 Applicability
1. Price adjustment shall be applicable only if provided for in the ContractData.
2. The price adjustment clause shall apply only for the works executed from the date of
signing of the agreement until the end of the initial intended completion date or
extensions granted for reasons attributed to the Employer by theEngineer.
3. The Contractor shall not be entitled to any benefit arising from the price adjustment
clause for extension in the contract period for reasons attributed to the Contractor.
4. In the Force Majeure event the price escalation clause shall apply.
29.2 Procedure
1. Contract price shall be adjusted for increase or decrease in rates and price of labour,
materials, fuels and lubricants in accordance with following principles and
procedures and as per formula given in the contract data.
2. The price adjustable shall be determined during each quarter from the formula given in
the contract data.
3. Following expression and meaning are assigned to the work done during eachquarter:
R =Total value of work during the quarter. It would include the amount of secured
advance granted, if any, during the quarter, less the amount of secured advance
recovered, if any during the quarter, less value of material issued by the department, if
any, during the quarter.
4. Weightages of various components of the work shall be as per the Contract Data.
Page 52 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
29.3 To the extent that full compensation any rise or fall in costs to the contractor is not
covered by the provisions of this or clauses in the contact, the unit rates and prices
included in the contract shall be deemed amounts to cover the contingency of such
other rise or fall in costs.
29.4 The index relevant to any quarter, for which such compensation is paid, shall be
the arithmetical average of the indices relevant of the calendar month.
29.5 For the purpose of clarity, it is pointed out that the adjustment may be either
positive or negative, i.e. if the price adjustment is in favour the same shall be
recovered from the sums payable to the Contractor.
Page 53 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
35. CURRENCIES
All payments will be made in Indian Rupees.
36. LABOUR
36.1 The Contractor shall, unless otherwise provided in the Contract, make his own
arrangements for the engagement of all staff and labour, local or other, and for their
payment, housing, feeding and transport.
Page 54 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
36.2 The Contractor shall, if required by the Engineer, deliver to the Engineer a return in detail,
in such form and at such intervals as the Engineer may prescribe, showing the staff and the
numbers of the several classes of labour from time to time employed by the Contractor on the
Site and such other information as the Engineer may require.
the same terms and conditions under which the contract was awarded.
41. JURISDICTION
This contract has been entered into in+ the State of Madhya Pradesh and its validity,
construction, interpretation and legal effect shall be subjected to the exclusive jurisdiction of
the courts in Ujjain or of the courts at the place where this agreement is entered into. No other
jurisdiction shall be applicable.
43. INSURANCE
43.1 The Contractor shall provide, in the joint names of the Employer and the Contractor,
insurance cover from the Start Date to the end of the Defects Liability Period, in the amounts
and deductibles stated for the following events which are due to the Contractor’s risks:
(a) loss of or damage to the Works, Plant, and Materials;
(b) loss of or damage to Equipment;
(c) loss of or damage to property (except the Works, Plant, Materials, and Equipment) in
connection with the Contract; and
(d) personal injury or death.
43.2 Policies and certificates for insurance shall be delivered by the Contractor to the Project
Manager for the Project Manager’s approval before the Start Date. All such insurance shall
provide for compensation to be payable in the types and proportions of currencies required
to rectify the loss or damage incurred.
43.3 If the Contractor does not provide any of the policies and certificates required, the Employer
may affect the insurance which the Contractor should have provided and recover the
premiums the Employer has paid from payments otherwise due to the Contractor or, if no
payment is due, the payment of the premiums shall be a debt due.
43.4 Alterations to the terms of an insurance shall not be made without the approval of the
Project Manager.
43.5 Both parties shall comply with any conditions of the insurance policies.
[End of GCC]
Page 56 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Page 57 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
32.4 Deleted
32.5 Deleted
33 Secured Advance Payable No secured Advance shall be payable
34 Completion Certificate – after physical As per Annexure – U
completion of work
Final Completion Certificate – after final As per Annexure – V
payment on completion of the work.
Page 58 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – N
DRAWINGS AS ATTACHED
LIST OF DRAWINGS
Page 59 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – O
(See clause 13 of Section 3 of GCC)
DETAILS OF MILESTONE
Page 60 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – P
(See clause 10 of Section 3 of GCC)
If the contractor fails to achieve the milestones, and the delay in execution of work is attributable to
the contractor, the Employer shall retain an amount from the sums payable and due to the contractor
as per following scale -
i. Slippage up to 25% in financial target during the milestone under consideration 2.5% of the work
remained unexecuted in the related time span.
ii. Slippage exceeding 25% but Up to 50% in financial target during the milestone under
consideration - 5% of the work remained unexecuted in the related time span.
iii. Slippage exceeding 50% but Up to 75% in financial target during the milestone under
consideration -7.5% of the work remained unexecuted in the related time span,
iv. Slippage exceeding 75% in financial target during the milestone under consideration-10% of
the work remained unexecuted in the related time span.
In case the work is not completed within the stipulated period of completion along with all such
extensions which are not granted to the Contractor for either Employer’s default or Force Majeure,
the compensation shall be levied on the contractor at the rate of 0.05% per day of delay limited to
maximum of 10% of contract price.
The decision of Executive Director, USCL shall be final and binding upon both the parties.
Page 61 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – Q
(List of Equipment for Quality Control Laboratory)
Page 62 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – R
(See clause 10 of Section 3 of GCC)
Price Adjustment
(Applicable only in case of Force Majeure)
Weightages of components in all the works under the project are determined by the
Authority, as below:
The source for the wholesale price index for all commodities shall be the publication of the
Economic Advisor to the Govt. of India published in the Reserve Bank of India, Bulletin.
The source for working out the price adjustment on P.O.L. the representative items for
reference shall be the costs of High Speed Oil only at the nearest HSD Supply Depot.
VP = 0.85 x PO x K2 x [(D2-D1)/D1]
Where,
Page 63 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
The source for such indices being publication of Labour Bulletin Bureau, Govt of India published
in the Reserve Bank of India Bulletin, on component representing Labour cost i/c all types of
benefits and amenities etc.
VL = 0.85 x PO x K3 x [(L2-L1)/L1]
Where,
To the extent that full compensation for any rise or fall in the costs to the contractor is not covered
by the provision of this or other clauses in the contract, the unit rates and prices included in the
contract shall be deemed to include amounts to cover the contingency of such other rise or fall in
costs.
If the contractor shall fail to complete the works within the stipulated period of completion under
the contract, the adjustment of prices thereafter, until the date of completion of the works shall
be made using either the indices or prices relating to the stipulated time for completion or the
current indices or prices whichever is more favorable to the Engineer-in-Charge. Provided that if
any extension of time is granted for reasons beyond the control of the contractor, the above
provisions shall apply only to the adjustment made after the expiry of such extension of time.
The price adjustment shall be evaluated after 12 months only from work commencement date
The following items are not to be included in the price adjustmentcalculations:
o Recovery of Liquidated damages.
o Recovery of Retention money, with holding and release.
Page 64 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – S1
(See clause 32 of Section 3 of GCC)
SEALED with the Common Seal of the said Bank this day of 20
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity
specified in the Form of Bid.
OR
(2) If the Bidder having been notified to the acceptance of his bid by the name of the
Executive Engineer during the period of Bid validity
(a) fails or refuses to execute the Form of Agreement in accordance with the
Instructions to Bidders, if required; or
(b) fails or refuses to furnish the Performance Security, in accordance with the
Instructions to Bidders.
we undertake to pay to the (name of the Executive Engineer) up to the above amount upon
receipt of his first written demand, without the (Authority) having to substantiate his demand,
provided that in his demand of (name of the Authority) will note that the amount claimed by
him is due to him owing to the occurrence of one or any of the two conditions, specifying
the occurred condition or conditions.
This Guarantee will remain in force up to and including the date 180 ** days after the
deadline for submission of Bids as such deadline is stated in the Instructions to Bidders or as
it may be extended by the (name of the Authority), notice of which extension(s) to the Bank
is hereby waived. Any demand in respect of this guarantee should reach the Bank not later
than the above date.
DATE SIGNATURE
WITNESS SEAL
* The Bidder should insert the amount of the guarantee in words and figures denominated in Indian Rupees.
This figure should be the same as shown in Bid Data Sheet at reference 17.
** EMD should be valid for a period of 120 days or more.
Page 65 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – S2
Page 66 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
and the exclusive judge to determine that whether or not any sum or sums are due
and payable to him by Concessionaire, which are recoverable by the USCL by
invocation of this Guarantee.
4. This Guarantee will not be discharged due to the change in constitution of the Bank
or the Bidder. We undertake not to withdraw or revoke this Guarantee during its
currency/ validity period, except with the previous written consent of the USCL.
5. We unconditionally and irrevocably undertake to pay to the USCL, any amount so
demanded not exceeding Rs. (Rupees Only),
notwithstanding any dispute or disputes raised by Bidder or anyone else in any suit
or proceedings before any dispute review expert, arbitrator, court, tribunal or other
authority, our liability under this Guarantee being absolute, unconditional and
unequivocal. The payment so made by us under this Guarantee to the USCL, shall be
a valid discharge of our liability for payment under this Guarantee and the Bidder
shall have no claim against us for making such payment.
6. This unconditional and irrevocable Guarantee shall remain in full force and effect
and shall remain valid until (180 days from the Bid due date).
Page 67 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – T
(See clause 33 of Section 3 of GCC)
(4) That the Contractor shall make at his own cost all necessary and adequate arrangements
Page 68 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
for the proper watch, safe custody and protection against all risks of the said materials
and that until used in construction as aforesaid the said materials shall remain at the site
of the said works in the Contractor’s custody and on his own responsibility and shall at
all times be open to inspection by the Engineer or any officer authorized by him. In the
event of the said materials or any part thereof being stolen, destroyed or damaged or
becoming deteriorated in a greater degree than is due to reasonable use and wear thereof
the Contractor will forthwith replace the same with other materials of like quality or
repair and make good the same required by the Engineer.
(5) That the said materials shall not be removed from the site of the said works except with
the written permission of the Engineer or an officer authorized by him on that behalf.
(6) That the advances shall be repayable in full when or before the Contract receives
payment from the Employer of the price payable to him for the said works under the
terms and provisions of the said agreement. Provided that if any intermediate payments
are made to the Contractor on account of work done than on the occasion of each such
payment the Employer-will be at liberty to make a recovery from the Contractor’s bill
for such payment by deducting there from the value of the said materials than actually
used in the construction and in respect of which recovery has not been made previously,
the value for this purpose being determined in respect of each description of materials
at the rates at which the amounts of the advances made under these presents were
calculated.
(7) That if the Contractor shall at any time make any default in the performance or
observance in any respect of any of the terms and provisions of the said agreement or
of these presents the total amount of the advance or advances that may still be owing of
the Employer shall immediately on the happening of such default were payable by the
Contractor to be the Employer together with interest thereon at twelve percent per
annum from the date or respective dates of such advance or advances to the date of
repayment and with all costs, charges, damages and expenses incurred by the Employer
in or for the recovery thereof or the enforcement of this security or otherwise by reason
of the default
of the Contractor and the Contractor hereby covenants and agrees with the Employer to
reply and pay the same respectively to him accordingly.
(8) That the Contractor hereby charges all the said materials with the repayment to the
Employer of the said sum of Rupees and any
further sum of sums advanced as aforesaid and all costs, charges, damages and expenses
payable under these presents PROVIDED ALWAYS and it is hereby agreed and
declared that notwithstanding anything in the said agreement and without prejudice to
the power contained therein if and whenever the covenant for payment and repayment
here-in before contained shall become enforceable and the money owing shall not be
paid in accordance there with the Employer may at any time thereafter adopt all or any
of the following courses as he may deem best:
a) Seize and utilize the said materials or any part thereof in the completion of the said
works on behalf of the contractor in accordance with the provision in that behalf
contained in the said agreement debiting the contractor with the actual cost of
effecting such completion and the amount due to the contractor with the value of
work done as if he had carried it out in accordance with the said agreement and at
the rates thereby provided. If the balance is against the contractor, he is to pay same
to the Employer on demand.
b) Remove and sell by public auction the seized materials or any part thereof and out
Page 69 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
of the moneys arising from the sale retain all the sums aforesaid repayable or
repayable to the Employer under these presents and pay over the surplus (if any) to
the Contractor.
c) Deduct all or any part of the moneys owing out of the security deposit or any sum
due to the Contractor under the said agreement.
(9) That except in the event of such default on the part of the contractor as aforesaid interest
on the said advance shall not be payable.
(10) That in the event of any conflict between the provisions of these presents and the said
agreement the provisions of these presents shall prevail and in the event of any dispute
or difference arising over the construction or effect of these presents the settlement of
which has not been here-in-before expressly provided for the same shall be referred to
the Employer whose decision shall be final and the provision of the Indian Arbitration
Act for the time being in force shall apply to any such reference.
Page 70 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE - U
(See clause 35 of section 3 -GCC)
Name of Work:
b. Date:
Certified that the above-mentioned work was physically completed on................. (Date) and taken
over on.................... (Date) and that I have satisfied myself to best of my ability that the work has
been done properly.
Date of issue
Engineer
Page 71 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE-V
(See clause 35 of section 3 -GCC)
Name of Work:
Name of Agency:
Used MB No.
I have satisfied myself to best of my ability that the work has been done
Engineer in Charge
Ujjain Smart City Limited, Ujjain
Page 72 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
ANNEXURE – W
(See clause 39 of Section 3 -GCC)
(a) Workmen Compensation Act 1923: - The Act provides for compensation in case of injury by
accident arising out of and during the course of employment.
(b) Payment of Gratuity Act 1972: - Gratuity is payable to an employee under the Act on satisfaction
of certain conditions on separation if an employee has completed the prescribed minimum years
(say, five years) of service or more or on death the rate of prescribed minimum days’(say, 15
days) wages for every completed year of service. The Act is applicable to all establishments
employing the prescribed minimum number (say, 10) or more employees.
(c) Employees P.F. and Miscellaneous Provision Act 1952: The Act Provides for monthly
contributions by the Employer plus workers at the rate prescribed (say, 10% or 8.33%). The
benefits payable under the Act are:
i. Pension or family pension on retirement or death as the case may be. '
ii. Deposit linked insurance on the death in harness of the worker.
iii. Payment of P.F. accumulation on retirement/death etc.
(d) Maternity Benefit Act 1951: - The Act provides for leave and some other benefits to women
employees in case of confinement or miscarriage etc.
(e) Contract Labour (Regulation & Abolition) Act 1970: - The Act provides for certain welfare
measures to be provided by the Contractor to contract labour and in case the Contractor fails to
provide, the same are required to be provided, by the Principal Employer by Law. The principal
Employer is required to take Certificate of Registration and the Contractor is, required to take
license from the designated Officer. The Act is applicable to the establishments or Contractor of
Principal Employer if they employ prescribed minimum (say 20) or more contractlabour.
(f) Minimum Wages Act 1948: - The Employer is to pay not less than the Minimum Wages fixed
by appropriate Government as per provisions of the Act if the employment is a scheduled
employment. Construction of buildings, roads, runways is scheduled employment.
(g) Payment of Wages Act 1936: - It lays down as to by what date the wages are to be paid, when it
will be paid and what deductions can be made from the wages of the workers.
(h) Equal Remuneration Act 1979: - The Act provides for payment of equal wages for work of equal
nature to male and female workers and for not making discrimination against female employees
in the matters of transfers, training and promotions etc.
(i) Payment of Bonus Act 1965: - The Act is applicable to all establishments employing prescribed
minimum (say, 20) or more workmen. The Act provides for payments of annual bonus ‘within
the prescribed range of percentage of wages to employees drawing up to the prescribed amount
of wages, calculated in the prescribed manner. The Act does not apply to certain establishments.
The newly set-up establishments are exempted for five years in certain circumstances. States
may have different number of employment size.
(j) Industrial Disputes Act 1947: - The Act lays down the machinery and procedure for resolution
of industrial disputes, in what situations a strike or lock-out becomes illegal and what are the
requirements for laying off or retrenching the employees or closing down the establishment.
Page 73 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
(k) Industrial Employment (Standing Orders) Act 1946: - It is applicable to all establishments
employing prescribed minimum (say, 100, or 50). The Act provides for laying down rules
governing the conditions of employment by the Employer on matters provided in the Act and
gets these certified by the designated Authority.
(l) Trade Unions Act 1926: - The Act lays down the procedure for registration of trade unions of
workmen and Employers. The Trade Unions registered under the Act have been given certain
immunities from civil and criminal liabilities.
(m) Child Labour (Prohibition & Regulation) Act 1986: - The Act prohibits employment of children
below 14 years of age in certain occupations and processes and provides for regulations o
employment ofchildren in all other occupations and processes. Employment of child labour is
prohibited in building and construction industry.
(n) Inter -State Migrant Workmen's (Regulation of Employment & Conditions of Service) Act 1979:
- The Act is applicable to an establishment which employs prescribed minimum (say, five) or
more inter-state migrant workmen through an intermediary (who has recruited workmen in one
state for employment in the establishment situated in another state). The inter- State migrant
workmen, in an establishment to which this Act becomes applicable, are required to be provided
certain facilities such as Housing, Medical-Aid, Travelling expenses from home up to the
establishment and back etc.
(o) The Building and Other Construction workers (Regulation of Employment and Conditions of
Service) Act 1996 and the Cess Act of 1996: - All the establishments who carry on any building
or other construction work and employs the prescribed minimum (say, 10) or more workers are
covered under this Act. All such establishments are required to pay cess at the rate not exceeding
2% of the cost of construction as. may be modified by the Government., The Employer of the
establishment- is required to provide safety measures at the building or construction work and
other welfare measures, such as canteens, first-aid facilities, ambulance, housing
accommodations for workers near the-work place etc. The Employer to whom the Act applies
has to obtain a registration certificate from the Registering Officer appointed by theGovernment.
(p) Factories Act 1948: - The Act lays down the procedure for approval of plans before setting up a
factory, health and safety provisions, welfare provisions, working hours, annual earned leave
and rendering information regarding accidents or dangerous occurrences to designated
authorities. it is applicable to premises employing the prescribed minimum (say, 10) persons or
more with aid of power or another prescribed minimum (say, 20) or more persons without the
aid of power engaged in manufacturing process.
Page 74 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
1. General
The data and information given in the Contract Document are based on the investigations, planning
and designs carried out so far. The data considered for the project planning have been included in the
bid documents. The data/information provided with the Bid document in the form of detailed project
report is meant for the reference and guidance only to the bidders. The successful bidder shall,
therefore, satisfy himself about the adequacy and accuracy of the said data/information and
interpretation thereof and collect fresh data/additional data/information and carry out/conduct further
investigations and studies and prepare the proposal and get the approval of same from the employer.
The Employer shall not be responsible for the accuracy/adequacy of the data/information provided
and interpretation thereof on the same by the Contractor.
2. Sufficiency of Bid
2.1 The Contractor shall be deemed to have visited and carefully examined the Project Site
and it’s surrounding to have satisfied himself to the nature and conditions of the means
of transport and communications, whether by land or air, as available at present and as to
possible interruptions thereto including the access and regress conditions for the Site. The
Contractor is also deemed to have made enquiries, examined and satisfied himself as to
the sites source for obtaining sand, stones, bricks and other materials, the sites for disposal
of surplus materials and accommodation for depots, colonies, workshops and other
infrastructure facilities as may be necessary for executing and completing the Works, as
also the sub-soil water and variations thereof, storms, prevailing winds, climatic
conditions and all other similar matters affecting the works including law &order.
2.2 Any neglect or omission or failure on the part of the Contractor in obtaining necessary
and reliable information upon the foregoing or any other matter affecting the Contract
shall not relieve him from any risks or liabilities or the entire responsibility for the
completion of the Works in accordance with the Contract.
i. The contractor shall comply with all applicable national, provincial, and local environmental
laws and regulations.
ii. The Contractor shall take all measures and precautions to avoid any nuisance or disturbance
arising from the execution of the Works. This shall wherever possible be achieved by
suppression of the nuisance at source rather than abatement of the nuisance once generated.
iii. The Contractor shall take all the necessary precautions and abide by relevant rules and
regulations of safety which are presently in force and which may come into force during the
currency of the contract.
iv. The Contractor shall also take such other additional precautions and resort to such other
additional safety measures as may be directed from time to time by the Engineer-in-charge.
Violation of any rules, regulations and guidelines contained herein will entail immediate
termination of the contract.
v. In the event of any spoil, debris, waste or any deleterious substance from the Site being
deposited on any adjacent land, the Contractor shall immediately remove all such material and
restore the affected area to its original state to the satisfaction of the Employer.
vi. The Contractor shall prevent any interference with the supply to or abstraction from, and
prevent any pollution of, water resources (including underground percolating water) as a result
Page 75 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Note: - In addition to above contractor shall have to follow the instruction of IS codes for security
and Safety (As per Handbook on construction And Safety Practices: SP 70: 2001)
Page 76 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
The Contractor shall ensure that no trees or shrubs or waterside vegetation are felled or
harmed except for those required to be cleared for execution of the Works. The Contractor
shall protect trees and vegetation from damage to the satisfaction of the Employer. No tree
shall be removed without the prior approval of the Employer and any competent authorities.
Should the Contractor become aware during the period of the Contract that any tree or trees
designated for clearance have cultural or religious significance he shall immediately inform
the Employer and await his instructions before proceeding with clearance. In the event that
trees or other vegetation not designated for clearance are damaged or destroyed, they shall be
repaired or replaced to the satisfaction of the Employer, who shall also impose a penalty of
twice the commercial value of any timber affected, as assessed by the Employer.
Contractor shall keep provision of compensatory plantation in lieu of trees cut down in the
process of development and construction. The contractor shall compensate plantation of 10
trees against felling/cutting of each mature tree. The area for compensatory tree plantation
shall be decided in consultation with the employer. The contractor shall be responsible for
protection, up-keeping, and watch & ward of the said compensatory plantation till 1 years of
Projects defect liability period.
5. Water Supply
The Contractor shall make his own arrangements at his own expense for water supply for
construction, sectional testing if any and other purposes.
6. Relations with Local Communities and Authorities
In setting and operating his plant and facilities and in executing the Works the Contractor
shall at all-time bear in mind and to the extent practicable minimize the impact of his activities
on existing communities. Where communities are likely to be affected by major activities
such as road widening or laying of utility lines or the establishment of a camp, large borrow
pit or haul road, he shall liaise closely with the concerned communities and their
representatives and if so directed, shall attend meetings arranged by the Employer to resolve
issues and minimize impacts on local communities.
7. Fire Prevention
The Contractor shall take all precautions necessary to ensure that no vegetation or property/ies
along the line of the road outside the area of the permanent works is affected by fires arising
from the execution of the Works. The Contractor shall obtain and follow any instructions of
the competent authorities with respect to fire hazard when working in the vicinity of gas
installations. Should a fire occur adjacent to the project road for any reason, the Contractor
shall immediately suppress it. In the event of any other fire emergency in the vicinity of the
Works the Contractor shall render assistance to the civil authorities to the best of his ability.
Any scrub or plantation damaged by fire considered by the Employer to have been initiated
by the Contractor's staff or labour shall be replanted and otherwise restored to the satisfaction
of the Employer at the Contractor's expense.
8. Interference with Traffic and Adjoining Properties
In case any operation connected with the works necessitates diversion, obstruction or closure
of any road, waterway or any other right of way, the approval of respective competent
authorities shall be obtained well in advance by the Contractor. In case the Contractor’s
operations obstruct access to adjacent properties, the Contractor shall be responsible to
provide reasonable temporary access to the affected parties. In case the Contractor fails to
provide adequate temporary facilities, this shall be deemed to be an Uncorrected Defect and
the Employer shall have the right to engage a third party to correct the Defect and the cost of
such correction will be deducted from the Contract Price.
Page 77 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
9.1 General
The Contractor shall at all times, carry out work on the City/Urban road in a manner creating
least interference to the flow of traffic while consistent with the satisfactory execution of the
same. For all works involving improvements to the existing urban road, the Contractor shall,
in accordance with the directives of the Engineer as well as the Traffic Police, provide and
maintain, during execution of the work, a passage for traffic either along a part of the existing
carriageway under improvement or along an alternative diversion route. Before taking up any
construction, the Contractor shall prepare a Traffic Management Plan for each road and submit
it to the Engineer for prior approval. This plan should include inter alia:
A qualified safety officer with support staff to serve as a site safety team with required safety devices.
Provision of traffic safety devises as per IRC: SP 55 with the following specifications:
Signages of retro-reflective sheet of high intensity grade
Delineators in the form of cones/drums made of plastic/rubber having retro-reflective red
and white bands, at a spacing of 5 m along with a reflective tape to be tied in between
the gaps of cones/drums. A bulb preferably using solar energy is to be placed on the top
of the cone/drum for delineation in the dark hours and night.
Barricades using iron sheet with adequate iron railing/frame painted with retro-reflective
paint in the alternate yellow and black & white stripes. Warning lights at 5 m spacing
shall be mounted on the barricades and kept lit in dark hours and night.
Road markings with hot applied thermoplastic paint with glass beads.
Safety measures for the workers engaged including personal protection equipment
First aid and emergency response arrangements
9.2 Passage of Traffic along a Part of the Existing Carriageway under improvement
a. For widening/strengthening existing carriageway where part width of the existing
carriageway is proposed to be used for passage of traffic, treated shoulders shall be
provided on the side on which work is not in progress. The treatment to the shoulder
shall consist of providing at least 300 mm moorum layer properly rolled and
compacted in a width of at least 1.5 m and the surface shall be maintained throughout
the period during which traffic uses the same to the satisfaction of theEngineer.
b. After obtaining permission of the Engineer, the treated shoulder shall be dismantled,
the debris disposed of and the area cleared as per the direction of the Engineer.
The Contractor shall take all necessary measures for the safety of traffic during construction
and provide, erect and maintain such barricades, including signs, marking, flags, lights,
drums, traffic cones, delineators and flagmen as per the traffic management plan submitted
by the Contractor and approved by the Engineer. An agreed phased programme for the
diversion of traffic on the urban road shall be drawn up in prior consultation with the Engineer
and the Traffic Police.
The Contractor shall keep all signs in proper position, clean and legible at all times.
Page 78 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
The barricades erected on either side of the carriageway/portion of the carriageway closed to
traffic, shall be of strong design to resist violation, and painted with alternate black and white
stripes. On each approach, at least two signs shall be put up, one close to the point where
transition of carriageway begins and the other 120 m away. The signs shall be of approved
design and of reflective type, as directed by the Engineer. Two persons with red / green flag
and whistle to be deputed at both ends of the barricades to regulate traffic. Red lanterns or
warning lights of similar type shall be mounted on the barricades at night and kept lit
throughout from sunset to sunrise.
At the points where traffic is to deviate from its normal path (whether on temporary diversion
or part width of the carriageway) the channel for traffic shall be clearly marked with the aid
of pavement markings, painted drums or a similar device to the directions of the Engineer.
At night, the passage shall be delineated with lanterns or other suitable light source.
Where the Contractor intends to use a particular route for the haulage of large quantities of
materials he shall consult well in advance with any affected communities and submit in
advance for the Employer’s approval a plan including but not limited to the proposed route,
the existing condition of the pavement and bridges, the estimated number and type of vehicle
movements per day, a programme for monitoring the condition of the pavement and
structures, and measures for limiting vehicle speeds and dust nuisance in built-up areas. The
Employer reserves the right to disallow certain haul routes should these in his opinion cause
or be likely to cause unreasonable nuisance or hazards to the public. The Employer's approval
will not remove the Contractor's obligations under this Sub-Clause to prevent and repair
damage to roads or his liability for compensation for any accidents caused by his vehicles.
11. Work in Monsoon and Dewatering
The execution of the work may entail working in the monsoon also. The contractor must
maintain labour force as may be required for the job and plan and execute the construction
and erection according to the prescribed schedule. No special/ extra rate will be considered
for such work in monsoon. The contractor’s rate shall be considered inclusive of cost of
dewatering required if any and no extra rate shall be payable on this account.
12. Site Clearance
Before handing over the work to the Authority, the contractor shall remove all temporary
structure like the site offices, cement godown, stores, labour hutments etc., scaffolding
rubbish, left over materials tools and plants, equipments etc., clean and grade the site to the
entire satisfaction of the Engineer-In-Charge. If this is not done the same will be got done by
USCL at his risk and cost.
Page 79 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
The following site documents shall mainly be maintained by the contractor at site:
Copy of contract documents and drawings.
Computerized bill format.
Site Order Book.
Material testing registers / Quality Inspection Reports.
Measurement books on computerized format.
Progress bar chart.
Sample approval register.
Hindrance Register.
Work Diary.
Deviation/variation order registers.
Cement consumption register.
Reinforcement registers.
Concrete cube test register.
Slump test register.
Silt content and sand bulkage register.
A. CIVIL WORKS
i. During excavation, the excavated earth must be dumped at a safe distance from the edge
of excavation. In no case, this shall be less than 1.5 meters from the top edge of the
excavation.
ii. Safe cross walkways are to be provided at distances not more than 30 meters along a
continuous trenching for pipelines etc.
iii. Hard hats (safety helmets), rubber boots, safety shoes, and hand gloves, etc. are required
to be provided for supervising as well as other working personnel by the contractor.
iv. Keep a watch on buried cables and underground systems. Ladders, gangways are to be
provided at convenient places for carrying out required works. Ladders shall be firmly
secured to ground, and rungs of the ladders shall be properly secured andsafe.
v. Install Barricading as per IS code with the marking “Ujjain Smart City Works”.
Page 80 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
B. ELECTRICAL WORKS
i. All temporary electrical connections should be got done to conform to statutory regulations and a
certificate obtained from the authorities. The connection and the wiring to be maintained by
competent and licensed supervisors and wiremen. As far as possible, the cables are to be safely
buried to ensure free access to equipment and machineries movements.
ii. Hard hats (safety helmets) made out of insulating material to be used by personnel working in 'live'
areas like substations, etc.
iii. Safety boots, necessary hand-gloves as required, shall be used.
iv. ‘Earthing’ of machineries and equipment shall be ensured. No open/ bare connections allowed. The
arrangements should be checked periodically for damages to insulation and loose connections, etc
and rectified so that the wiring becomes non-hazardous.
v. The areas of working during nights shall be properly illuminated with floodlights and hand- Hard
hats (safety helmets), safety belts, eye goggles, face shields, safety boots, hand- gloves, respirators,
etc as required/ directed shall be used.
vi. Proper, correct and safe lifting methods shall be adopted
vii. All lifting tools tackle and wires ropes etc shall be of tested quality for safe working loads. Wire
ropes shall be of sound construction without any splaying.
viii. Checks to be exercised for broken wires and core proportion in the main body of the wire ropes to
be rejected. Manufacturer’s guidelines/ standards instructions are to be followed for using wire ropes
and slings with broken wires. Experience and common sense is of immense help.
ix. Usage of hoisting belts/ safety belts is must for personnel working at higher elevations.
x. Only safe gangways / walkways shall be used for movement of personnel. Short cuts shall be
avoided.
xi. Check connections to headman anchors before hoisting.
xii. All live wires to be crossed during hoisting shall be made dead near the vicinity of the area during
hoisting/ rigging.
xiii. Avoid keeping the loads supported by hoisting equipments for an unreasonable length of time.
xiv. Ropes, cables, and slings must be protected with pads or wooden blocks at sharp edges.
xv.lamps as per the demand of the job.
xv. Danger signals and safety tags in the live areas shall be demonstrated properly. All connections to
be switched off after the working hours.
xvi. Isolation switches and main switches shall be accessible easily. Necessary precautions should be
taken while excavating earthing pits.
xvii. All works shall be carried out in strict accordance to the norms, procedure and specifications issued
and enforced by BIS in Relevant Indian Standard specifications and code of Practices with up to date
amendments and revisions, latest edition of National building code and National electric code. In
addition, the installation shall comply in all respects with the requirements of Indian. Electricity Act
2003 and Indian Electricity Rule 1956 with up to date amendments and revisions and special
requirements if any of the M.P. State Electricity Board or Chief Electrical Advisor to Government
of Madhya Pradesh cum Chief Electrical Inspector and his subordinate office.
xviii. The contractor shall make his own arrangements for supply of water and electricity at his expense
required for execution of work. The USCL shall neither make any such arrangements nor shall make
any payments in this regard.
Page 81 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
xix. The contractor has to construct at his own cost his site office and store at site on a suitable place and
location as permitted by USCL. The USCL shall not provide any place for storage of equipments
required for work. No amount shall be paid to the contractor in this regard.
xx. Proper upkeep and maintenance and safety of store and stocks of materials brought at site shall be
the sole responsibility of the contractor. The materials got damaged due to negligence of its up
keeping at site or due to mishandling shall have to be replaced by the contractor at his own cost. On
discovery of such damages the USCL shall recover the amount paid through the running bills to the
contractor and shall only be reimbursed after the replacement of the same. The USCL shall also not
be responsible for theft of materials from site and the contractor has to replace all such materials at
his own cost. No compensation whatsoever shall be payable to the contractor on above grounds.
xxi. The contractor shall not be entitled to any compensation for any loss suffered by him on account of
delay in commencement or execution for work whatever the cause of delay may be including delay
arising out of other materials, supply of materials, transportation for any matter related with
MPPKVV Co. Ltd. & Electrical Safety Department or any other reasons whatsoever, the USCL shall
not be liable for any claim in respect thereof.
xxii. The contractor shall finalize the layout of work, physically at site, and get approved by MPPKVV
Co. Ltd. Before placing orders for material. Approval of above layout by MPPKVV Co. Ltd. shall
be general and shall not absolve the contractor with responsibility of its correctness.
xxiii. The contractor shall within specified period from the date of issue of work order shall prepare all
relevant drawings to be submitted to the applicable office of Electrical Inspector MP Govt or any
other competent office for approval. All required sanctions and approvals form the above offices
shall have to be obtained by the contractor within the above stipulated period at his own cost.
xxiv. Rate quoted shall be applicable for works at all height unless otherwise specified in the schedule of
quantities.
xxv. The contractor shall submit the drawing in three sets to USCL for this work duly approved by the
Office of the electrical Inspector MP govt. and MPPKVV Co. Ltd. Within specified days from the
date of work order. The approval of these drawing will be general and will not absolve the contractor
of the Responsibility of the correctness of those drawings.
xxvi. The contractor shall submit test reports of the equipment to be supplied and drawings for approval
of the Engineer in Charge before supplying the equipment. The successful tenderer shall also submit
the purchase bill of all items as required and directed at no cost.
xxvii. (A) The contractor shall have to arrange all free of cost facilities for the inspection, such as employ
or material labour etc. and any fees payable to Government or any competent authority at his own
cost. The contractor shall arrange to obtain all sanctions from the concerning office of MPPKVV
Co. Ltd. and from the elect. inspector Govt. of M.P. at his own cost. Any fees in respect of above
work paid by the contractor shall not be reimbursed or refunded by the USCL and no claim for
compensation shall be entertained in this regard. Copy of all such sanctions have to be submitted to
Engineer In charge USCL.
xxviii. (B) The contractor has to arrange factory inspection of all major items as required by Engineer in
Charge at the manufacturer’s works before dispatch of material. Date of inspection should be
informed 15 days in advance to USCL. The contractor has to get any equipment or complete
installation checked and tested by any Government/ Semi Government/ Private authority such as
CPRI, BHEL, NABL laboratory, Testing department of MPPKVV Co. Ltd. etc. at his own cost. He
shall also provide free of cost all labour, material, equipments etc. for the purpose of above testing.
The contractor shall not be entitled for any compensation on this ground. If required by Engineer in
Charge contractor will have to arrange for third party inspection of entire installation done by him and
he will have to rectify / repair / replace any defects pointed out by inspection agency.
Page 82 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
xl. Successful Tenderer should have A-Class Electrical license issued by M.P. Licensing Board. The
license must be submitted at the time of agreement.
Page 83 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
C. GENERAL
i. Safety starts from the individual on the job. Experience and common sense shall be
generously used. In case of any doubt regarding safety, Engineer–in-Charge can be
consulted.
ii. Proper communication and alertness on the job is to beensured.
iii. Manholes and openings for ducts etc shall be kept properly covered.
iv. Correct tools and tackles should be used for every work. Make shift tools and tackles will
result in accidents.
v. Fire-fighting equipment shall be placed at designated locations and kept unobstructed.
vi. Do not use loose clothing, neckties, and etc. while on the job.
vii. Safety precautions recommended by the manufacturers/ vendors shall be strictly adhered
to.
viii. All machinery, tools and tackles shall be maintained properly, and clearly.
The Contractor shall, at his own cost, arrange to take colour photographs at various stages /
facets of the work including interesting and novel features of the work as directed by the
USCL officials and supply two copies of colour record photographs mounted in the albums
including negatives with specification and these shall be kept by Employer.
Page 84 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
The Contractor shall, at his own cost, arrange to provide, erect and maintain necessary display
boards/ banners etc as directed by USCL officials at selected points of project site giving such
information as considered necessary for public awareness/ information.
The contractor is required to submit the completion drawings (As built Drawings) for the work
done by him. However, the completion drawings for works done and covered underground, it
is essential to prepare the completion drawing as soon as the work is done and before backfilling.
The completion drawing should provide adequate data to enable finding the exact location of the
system in ground at a later date by any other new person. It should also provide the data related
to material, class and size of the line, its depth in ground, Invert Levels and levels in the manholes.
The details will be provided from Chainage-wise and the plan layout of the roads along with
Cross section and L-section on the reference map should be updated and submitted along with
the bill. Two hard copies of the drawings will also be submitted along with the soft copy.
i. The Bidder shall include in his bid, a detailed construction programme of executing the project,
describing broadly the technology and construction methodology major components of the
project including traffic diversion plan, deployment of machinery, submission of drawings and
design. The programme shall be supplemented with Master Control Network. The employer
reserves the right to request for change in Master Control Network after discussions with the
successful bidder. Mutually agreed Master Control Network shall form part of theContract.
ii. The Contractor has to start construction works in the fronts available at particular road site. This
shall be planned in close consultation with the Engineer-In-Charge and in coordination with the
concerned authorities / departments / local groups.
iii. The Works shall be executed and performed in accordance with the Master Control Network
(Work Programme) which shall clearly indicate the interlinking / interdependencies of all the
works of the Contract.
iv. The Programme shall be reviewed jointly by the Employer/ Engineer and the Contractor, at least
once in a month where-in the hold ups/delays, if any, in the progress of Works, with reference to
the agreed Schedule shall be given Special Attention. Necessary modifications (updating /
Revisions) of the Programme, within the overall Time for Completion, shall be carried out by
mutual agreement between the Employer/ Engineer and the Contractor.
The Contractor shall be required to adopt a Working Procedure based on the following:
i. Protection of properties along the project roads and their activities / operations such that these
suffer minimum (if any) adverse effects as a result of construction activities.
ii. Observe all local requirements related to work and traffic restrictions (for example,
transportation of material during particular times of a day or week, use of manual labour / smaller
vehicles for carriage of material to / from narrow lanes) as may be specified by USCL from time
Page 85 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
to time.
iii. Avoid disruption of any public utility network and promptly restore the same in case of any
unavoidable disruption at his own cost and time without causing any discomfort to people as
well as businesses.
iv. Provide for all temporary arrangements essential to allow normal operations / living conditions
for people as well as businesses.
Page 86 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Section 4
Bill of Quantities
This section contains the following tables:
1. General abstract of all components of the project and given in Table 4.1
consisting the corresponding cost and percentage with respect to the total project
cost.
Page 87 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Page 88 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
UADD
S.No SOR Description Unit Rate Quantity Total Amount
2012
1 2 3 4 5 6 7
EARTH WORK
Earth work in Excavation by Mechenical
Means (Haydrulic Excavator) / Manual
means over area (exceeding 300mm
depth,1.5 m in width or 10 Sqm on plan)
1 2.6 including dressing of sides and ramming of
bottoms lift upto 1.5 m, including getting out
the excavated soil and disposal of surplus
excavated soils as directed, within a lead of
50m.
2.6.1 all kind of soil Cum ₹ 114.30 1787.26 ₹ 2,04,283.76
Filling available excavated earth (excluding
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20cm in depth,
4 2.25 Cum ₹ 53.10 442.68 ₹ 23,506.31
consolidating each deposited layer by ramming
and watering, lead up to 50 m and lift upto 1.5
mtr and more
Dry stone pitching 20 to 22.5cm thick including
11.43 supply of stones and preparing surface Sqm ₹ 704.70 1338.35 ₹ 9,43,132.14
complete.
2.27 Supplying and filling in plinth under floors
5 including, watering,
ramming consolidating and dressing complete
2.27.3 Moorum/Hard copra Cum ₹ 513.00 267.67 ₹ 1,37,314.26
CONCRETE WORK
4.1 Providing and laying in position cement
concrete of specified grade excluding the cost
7
of centering and shuttering. All work up to
plinth level.
4.1.4 Cement Concrete grade M-10 (Nominal
Mix) with 20 mm Cum ₹ 3,235.50 136.85 ₹ 4,42,765.36
maximum size of stone aggregate.
Page 89 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
UADD
S.No SOR Description Unit Rate Quantity Total Amount
2012
1 2 3 4 5 6 7
FORM WORK
20.1 Centering and shuttering including strutting,
10 propping etc. and
removal of form for :
20.1.1 Foundations, footings, bases of columns,
etc. for mass Sqm ₹ 124.20 92.52 ₹ 11,490.98
concrete up to plinth level.
20.1.2 Walls (any thickness) including attached
pilasters butteresses, Sqm ₹ 194.40 639.32 ₹ 1,24,283.81
plinth beams and string courses etc.
MASONRY WORK
Brick work with modular fly ash lime
bricks (FALG Bricks) conforming to
11 6.27 IS:12894-2002, class designation 100
average compressive strength including the cost
of scaffolding :
6.27.2 Cement mortar 1:6 (1 cement : 6 coarse
sand) for 200mm Cum ₹ 3,546.90 33.96 ₹ 1,20,468.90
thick wall
FINISHING
12 13.1 12 mm cement plaster of mix :
13.1.1 1:4 (1 cement: 4 fine sand) Sqm ₹ 97.20 290.47 ₹ 28,233.30
13 13.18 Neat cement punning Sqm ₹ 22.50 290.47 ₹ 6,535.49
FLOORING
Page 90 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
UADD
S.No SOR Description Unit Rate Quantity Total Amount
2012
1 2 3 4 5 6 7
Page 91 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
UADD
S.No SOR Description Unit Rate Quantity Total Amount
2012
1 2 3 4 5 6 7
Providing and laying integral cement based
treatment for water proofing on horizontal
surface at all depth below ground level for
under ground structures as directed by
Engineer-in-Charge and consisting of :
(i) Ist layer of 22mm to 25mm thick approved
and specified rough stone slab over a 25mm
thick base of cement mortar 1:3 (1 cement : 3
coarse sand) mixed with water proofing
compound conforming to IS:2645 in the
18.10 recommended proportion over the leveling
course (leveling course to be paid separately).
Joints sealed and grouted with cement slurry
mixed with water proofing compound.
(ii) 2nd layer of 25mm thick cement mortar 1:3
(1 cement: 3 coarse sand) mixed with water
proofing compound in ecommended
proportions. (iii) Finishing top
with stone aggregate of 10mm to 12mm
nominal size spreading @ 8 cudm/sqm
thoroughly embedded in the 2nd layer.
18.1.1 Using rough kota stone. Sqm ₹ 677.70 1377.26 ₹ 9,33,366.12
Providing and laying integral cement based
treatment for water proofing on the vertical
surface by fixing specified stone slab
22 mm to 25mm thick with cement slurry
mixed with water proofing compound
conforming to IS:2645 in recommended
proportions with a gap of 20mm (minimum)
between stone slabs and the receiving surfaces
18 18.2 and filling the gaps with neat cement slurry
mixed with water proofing compound
and finishing the exterior of stone slab with
cement mortar 1:3 (1 cement : 3 coarse sand)
20mm thick with neat cement punning mixed
with water proofing compound in
recommended proportion complete at all levels
and as directed by Engineer-
in-charge :
18.2.1 Using Kota Stone Sqm ₹ 791.10 358.28 ₹ 2,83,432.14
Fixing glazed/ Ceramic/ Vitrified floor tiles
with cement based high polymer modified
quick-set tile adhesive (Water based)
11.4 Sqm ₹ 241.20 1470.00 ₹ 3,54,564.00
conforming to IS: 15477 , using 5kg. adhesive
per sqm of tile area, in average 3mm thickness
with fixing material.
Providing and fixing M.S. grills of required
9.48 pattern in frames of windows etc. with M.S.
flats, square or round bars etc. all complete.
Fixed to openings /wooden frames with rawl
9.48.2 Kg ₹ 78.30 2373.70 ₹ 1,85,860.40
plugs screws etc.
Providing and Supplying lane ropes with
Non- SOR Each ₹ 1,680.00 9.00 ₹ 15,120.00
anchor brackets
TOTAL (INR) ₹ 1,03,32,680.68
Page 92 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
CONCRETE WORK
7 4.1 Providing and laying in position cement
concrete of specified grade excluding the cost
of centering and shuttering. All work up to
plinth level.
4.1.4 Cement Concrete grade M-10 (Nominal Mix)
with 20 mm Cum ₹ 3,235.50 26.71 ₹ 86,405.26
maximum size of stone aggregate.
Providing and laying in position machine
batched, machine mixed and machine
vibrated design mix cement concrete of
specified grade for reinforced cement concrete
work including pumping of concrete to site of
laying but excluding the cost of centering,
shuttering, finishing and reinforcement.
including Admixtures in recommended
8 5.31 proportions as per IS 9103 to accelerate, Cum ₹ 4,720.50 89.29 ₹ 4,21,482.59
retard setting of concrete, improve
workability without impairing strength and
durability as per direction of Engineer-in-
charge. M-25 grade reinforced cement
concrete by using 410 kg. of cement per cum of
concrete. All work up to floor 2 level.
FORM WORK
Page 93 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
MASONRY WORK
Brick work with modular fly ash lime bricks
(FALG Bricks) conforming to IS:12894-2002,
11 6.27 class designation 100 average compressive
strength including the cost of scaffolding :
6.27.2 Cement mortar 1:6 (1 cement : 6 coarse
sand) for 200mm Cum ₹ 3,546.90 17.05 ₹ 60,473.23
thick wall
FINISHING
12 13.1 12 mm cement plaster of mix :
13.1.1 1:4 (1 cement: 4 fine sand) Sqm ₹ 97.20 170.50 ₹ 16,572.21
13 13.18 Neat cement punning Sqm ₹ 22.50 170.50 ₹ 3,836.16
FLOORING
Providing and fixing Ist quality ceramic
glazed wall tiles conforming to IS : 15622 (6-
7mm thickness) of approved make in all colours,
shades except burgundy, bottle green, black of
any size as approved by Engineer-in-Charge in
skirting, risers of steps and dados over 12 mm
16 11.34 thick bed of cement Mortar 1:3 (1 cement : 3 Sqm ₹ 617.40 68.47 ₹ 42,270.91
sand) and jointing with grey cement slurry
@ 3.3kg per Sqm including pointing in white
cement mixed with pigment of matching shade
complete
Page 94 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Page 95 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
Page 96 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
CONCRETE WORK
4.1 Providing and laying in position cement
concrete of specified grade excluding the cost
3 of centering and shuttering. All work up to
plinth level.
4.1.4 Cement Concrete grade M-10 (Nominal Mix)
with 20 mm
a maximum size of stone aggregate. Cum ₹ 3,235.50 4.82 ₹ 15,589.04
Page 97 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
MASONRY WORK
6.24 Brick work with machine moulded modular
bricks of class designation 40 in exposed brick
work including making horizontal and vertical
7 grooves 10 mm wide 12mm deep complete from Cum ₹ 3,618.90 220.06 ₹ 7,96,384.62
ground level up to plinth level in ement mortar
1:6 (1 cement : 6 coarse sand).
a 13.65.1 Two or more coats on new work. Sqm ₹ 31.50 2378.448 ₹ 74,921.11
Page 98 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
FORM WORK
Page 99 of 149
Request for Proposal for Ist Phase of Construction of Swimming Pool cum Commercial Complex in Ujjain Smart
City including Operation and Maintenance for 5 Years
CONCRETE WORK
7 4.1 Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering. All work
up to plinth level.
4.1.4 Cement Concrete grade M-10 (Nominal
Mix) with 20 mm Cum ₹ 3,235.50 38.68 ₹ 1,25,149.50
maximum size of stone aggregate.
Providing and laying in position
machine batched, machine mixed and
machine vibrated design mix cement
concrete of specified grade for reinforced
cement concrete work including pumping
of concrete to site of laying but excluding
the cost of centering, shuttering, finishing
and reinforcement. including Admixtures
in recommended proportions as per IS
8 5.31 9103 to accelerate, retard setting of Cum ₹ 4,720.50 87.68 ₹ 4,13,905.12
concrete, improve workability without
impairing strength and durability as per
direction of Engineer-in-charge. M-25
grade reinforced cement concrete by
using 410 kg. of cement per cum of
concrete. All work up to floor 2 level.
6.9.1 Single row for one utility service meter ₹ 1,107.00 36.000 ₹ 39,852.00
Providing and Laying Reinforced cement concrete pipe
NP4/prestressed concrete pipe for culverts on first class
bedding of granular material in single row including fixing
collar with cement mortar 1:2 but excluding excavation,
20 14.14
protection works, backfilling, concrete and masonry works in
head walls and parapets and as per relevant clauses of section-
2900.
Site Area
COST ABSTRACT FOR PLUMBING AND SANITARY WORKS OF SWIMMIMMG POOL
1 Dimensions: Main Pool 50 M (Length) , 25 M (Width) x 1.20 M - Avg.Depth
1.60 M,
2 Surface Area:1250 M2
3 Volume: 2000 M3 + 95 M3 =2095 M3
4 Filtration turn over: 7 Hours ( 6 Hrs - 8 Hrs Recommended )
5 Filtration flow rate: 281 M3/hr ( 93.6 M3 / Hr Per Filter X 3 No. )
6 Filtration velocity: 30 M3/Hr/M2
7 Pool type : Overflow
No Description Unit Unit Rate Qty Total
WATER TREATMENT In Rs. In Rs.
1 FILTRATION PLANT nos. ₹ 6,85,000.00 3 ₹ 20,55,000.00
Totally anticorrossive bobbin wound sand filter 2000 mm dia manufactured with
fibre glass and polyester resin, fitted with collector arms and diffuser made from
unplasticised PVC and Polypropelene. Filter media height -1000mm and capable
of accomodating flow rate of 93.6 M³/hr @ 30m³/hr/m² Complete with lid in
polyester resin and fibre glass for media charging, 2 No. pressure Gauges &
associated tubing, manual air release valve, purge cap for sand discharge and
140 PVC flanged connection for inlet and outlet.
Make: Astral, Spain Code:00706
3 FILTER MEDIA
Quartz Filter Media mesh size 16 /32 kg ₹ 12.00 21000 ₹ 2,52,000.00
Quartz Filter Media mesh size 8 / 16 kg ₹ 12.00 800 ₹ 9,600.00
Make : Feathertuff / Eq.
Site Area
COST ABSTRACT FOR PLUMBING AND SANITARY WORKS OF SWIMMIMMG POOL
1 Dimensions: Main Pool 50 M (Length) , 25 M (Width) x 1.20 M - Avg.Depth
1.60 M,
2 Surface Area:1250 M2
3 Volume: 2000 M3 + 95 M3 =2095 M3
4 Filtration turn over: 7 Hours ( 6 Hrs - 8 Hrs Recommended )
5 Filtration flow rate: 281 M3/hr ( 93.6 M3 / Hr Per Filter X 3 No. )
6 Filtration velocity: 30 M3/Hr/M2
7 Pool type : Overflow
No Description Unit Unit Rate Qty Total
The Optima series, featuring all-new power supply technology available from 90
V ac up to 265 V ac and 50-60Hz, guarantees unprecedented dosing precision and
adaptability.
- Set point deviation alarm, programmable for the entire measurement interval
- O.F.A. time (Over Feed Alarm) to prevent the dosing pump from infecting
product if the sensor malfunctions.
Site Area
COST ABSTRACT FOR PLUMBING AND SANITARY WORKS OF SWIMMIMMG POOL
1 Dimensions: Main Pool 50 M (Length) , 25 M (Width) x 1.20 M - Avg.Depth
1.60 M,
2 Surface Area:1250 M2
3 Volume: 2000 M3 + 95 M3 =2095 M3
4 Filtration turn over: 7 Hours ( 6 Hrs - 8 Hrs Recommended )
5 Filtration flow rate: 281 M3/hr ( 93.6 M3 / Hr Per Filter X 3 No. )
6 Filtration velocity: 30 M3/Hr/M2
7 Pool type : Overflow
No Description Unit Unit Rate Qty Total
12 MOTRISED STIRRING SYSTEM nos. ₹ 12,500.00 02 ₹ 25,000.00
Agitator for easy installation with MS powder coated base stand over solution
Preparation tank, provided with SS 316 rod and propellor arms inSS 316 , length of
stirring rod 900mm. Agitator should be directly driven by 0.5 HP single phase air
cooled motor , body in CI ,driven at 1500 rpm,IP 55 protection & heavy duty
anti friction deep grooved shielded ball bearings
Make : Feathertuff / Eq.
All valves shall be in UPVC with PN10 rating and EPDM seat.
19 CI Butterfly Valves with SS wettable parts Dia -160mm nos. ₹ 16,150.00 10 ₹ 1,61,500.00
Make: GF / Astral / Eq
20 Valve Assembly Kit for Dia -160mm Butterfly Valve / NRV in Powder Coated MS nos. 16
Slipon Flanges, GI Nut Bolts with washers, Rubber Gasket etc. complete ₹ 6,500.00 ₹ 1,04,000.00
Make: GF / Astral / Eq
Site Area
COST ABSTRACT FOR PLUMBING AND SANITARY WORKS OF SWIMMIMMG POOL
1 Dimensions: Main Pool 50 M (Length) , 25 M (Width) x 1.20 M - Avg.Depth
1.60 M,
2 Surface Area:1250 M2
3 Volume: 2000 M3 + 95 M3 =2095 M3
4 Filtration turn over: 7 Hours ( 6 Hrs - 8 Hrs Recommended )
5 Filtration flow rate: 281 M3/hr ( 93.6 M3 / Hr Per Filter X 3 No. )
6 Filtration velocity: 30 M3/Hr/M2
7 Pool type : Overflow
No Description Unit Unit Rate Qty Total
21 CI Foot Valves Dia -110 nos. ₹ 6,500.00 4 ₹ 26,000.00
Make: VTM / Kirloskar
22 CI Sluice Valves Dia -160 mm with GI Operating Key assambly nos. ₹ 37,500.00 2 ₹ 75,000.00
Make: VTM / Kirloskar
INTERCONNECTING PIPING
23 Connecting Header Nos. ₹ 47,500.00 2 ₹ 95,000.00
Connection Header in SS provided with 1 No. 25 mm threaded nipple for doser
connection & Required no. of connection 160 mm end Nozzles & MS powder
coated 160 mm slipon flange to be connected with filtration plumbing
ACCESSORIES
29 Junction Boxes
Junction Boxes, made in ABS, composed of 3 entries nos. ₹ 2,250.00 36 ₹ 81,000.00
3/4" or PG-16 coupling
Site Area
COST ABSTRACT FOR PLUMBING AND SANITARY WORKS OF SWIMMIMMG POOL
1 Dimensions: Main Pool 50 M (Length) , 25 M (Width) x 1.20 M - Avg.Depth
1.60 M,
2 Surface Area:1250 M2
3 Volume: 2000 M3 + 95 M3 =2095 M3
4 Filtration turn over: 7 Hours ( 6 Hrs - 8 Hrs Recommended )
5 Filtration flow rate: 281 M3/hr ( 93.6 M3 / Hr Per Filter X 3 No. )
6 Filtration velocity: 30 M3/Hr/M2
7 Pool type : Overflow
No Description Unit Unit Rate Qty Total
Make: Astral, Spain Code : 30825 / Hensel
32 Transformers Panel -
Cubical powder coated Transformer Panel in CRCA sheet with incomming 2 pole
MCB capable for mounting 10 no. transformers, complete in all respect nos. ₹ 23,000.00 4 ₹ 92,000.00
34 SS LEADER
SS 316 SS Leader in 43 mm / 14 G Pipe with Flat Step Trades
4 Step Ladder No. ₹ 21,500.00 2 ₹ 43,000.00
5 Step Ladder No. ₹ 24,500.00 2 ₹ 49,000.00
6 Step Ladder No. ₹ 26,500.00 2 ₹ 53,000.00
Make: Astral / Feathertuff/Eq.
35 VACCUM HEAD
SS 304 Metalic vacuum head , 900 mm long , PP wheel mounted,spring mounted no. 01
brush at bottom of head, toeabe with nylon rope , 2" connection for hose ₹ 31,500.00 ₹ 31,500.00
Make: Astral / Feathertuff/Eq.
Site Area
COST ABSTRACT FOR PLUMBING AND SANITARY WORKS OF SWIMMIMMG POOL
1 Dimensions: Main Pool 50 M (Length) , 25 M (Width) x 1.20 M - Avg.Depth
1.60 M,
2 Surface Area:1250 M2
3 Volume: 2000 M3 + 95 M3 =2095 M3
4 Filtration turn over: 7 Hours ( 6 Hrs - 8 Hrs Recommended )
5 Filtration flow rate: 281 M3/hr ( 93.6 M3 / Hr Per Filter X 3 No. )
6 Filtration velocity: 30 M3/Hr/M2
7 Pool type : Overflow
No Description Unit Unit Rate Qty Total
Deep bag net made in polypropelene and white polyester netting with wishbone
connection
Make: Astral, Spain Code: 01397
43 Cabling for the Underwater Lights considering the voltage drop from
TOTAL ₹ 65,54,254.00
Site Area
COST ABSTRACT FOR PLUMBING AND SANITARY WORKS OF SWIMMIMMG POOL
1 Dimensions: Main Pool 50 M (Length) , 25 M (Width) x 1.20 M - Avg.Depth
1.60 M,
2 Surface Area:1250 M2
3 Volume: 2000 M3 + 95 M3 =2095 M3
4 Filtration turn over: 7 Hours ( 6 Hrs - 8 Hrs Recommended )
5 Filtration flow rate: 281 M3/hr ( 93.6 M3 / Hr Per Filter X 3 No. )
6 Filtration velocity: 30 M3/Hr/M2
7 Pool type : Overflow
No Description Unit Unit Rate Qty Total
COMPETITION ACCESSORIES
25.60.1.2 Sand Cast Iron S&S as per IS: 1729. Each ₹ 465.30 70 ₹ 32,571.00
Constructing one brick masonry chamber 60x60x75
cm inside, with 25 class designation modular brick
work in cement mortar 1:4 (1 cement : 4 coarse sand)
for sluilce valve, with C.I. surface box 100 mm. top
diameter, 160 mm bottom diameter and 180 mm
deep (inside) with chained lid. RCC top slab of
Cement concrete grade M-20 (Nominal Mix with
30 23.51 20mm maximum size of stone aggregate) along with Each ₹ 5,008.50 1 ₹ 5,009.00
necessary excavation, 100 mm thick foundation
concrete grade M-7.5 (Nominal Mix with 40mm
maximum size of stone aggregate) & inside
plastering with cement mortar 1:3 (1 cement : 3
coarse sand) 12 mm thick finished with a floating
coat of neat cement complete as per standard design.
:
UADD SOR
Sl.No. VOL-II Item Description Unit Quantity Rate Amount
Earth work in Excavation by
Mechenical Means (Haydrulic
Excavator) / Manual means over
area (exceeding 300mm depth,1.5
m in width or 10 Sqm on plan)
2.6 including dressing of sides and
ramming of bottoms lift upto 1.5
m, including getting out the
excavated soil and disposal of
surplus excavated soils as directed,
within a lead of 50m.
2.6.1 all kind of soil Cum 475.56 ₹ 114.30 ₹ 54,356.51
UADD SOR
Sl.No. VOL-II Item Description Unit Quantity Rate Amount
4.1.4 Cement Concrete grade M-10
(Nominal Mix) with 20 mm Cum 17.248 ₹ 3,235.50 ₹ 55,805.90
maximum size of stone aggregate.
UADD SOR
Sl.No. VOL-II Item Description Unit Quantity Rate Amount
Supplying and stacking at site
dump manure from approved
source, including carriage up to 1
19.4
km (manure measured in stacks
will be reduced by 8% for
payment)
Screened through sieve of I.S.
19.4.1 Cum 515 ₹ 94.50 ₹ 48,667.50
designation 20mm
Screened through sieve of I.S.
19.4.2 Cum 415 ₹ 103.50 ₹ 42,952.50
designation 16mm
Screened through sieve of I.S.
19.4.3 Cum 400 ₹ 110.70 ₹ 44,280.00
designation 4.75mm
UADD SOR
Sl.No. VOL-II Item Description Unit Quantity Rate Amount
UADD SOR
Sl.No. VOL-II Item Description Unit Quantity Rate Amount
Providing and laying 60 mm thick
factory made cement concrete
interlocking paver block of M -30
grade made by block making
machine ith strong vibratory
compaction and of approved size
11.46 and design/shape laid in required Sqm 1603.312 ₹ 408.60 ₹ 6,55,113.28
colour and pattern over and
including 50 mm thick compacted
bed of course sand, filling the
joints with coarse sand etc. all
complete as per the direction of
Engineer-in-charge.
UADD SOR
Sl.No. VOL-II Item Description Unit Quantity Rate Amount
Digging holes in ordinary soil and
refilling the same with the
excavated earth mixed with manure
or sludge in the ratio of 2:1 by
volume (2 parts of stacked volume
of earth after reduction by 20% : 1
part of stacked volume of manure
19.14
after reduction by 8%) flooding
with water, dressing including
removal of rubbish and surplus
earth, if any with all leads and lifts
(cost of manure, sludge or extra
good earth if needed to be paid for
separately) :
19.14.1 Holes 1.2 m dia and 1.2 m deep. Each 124 ₹ 163.80 ₹ 20,311.20
19.14.2 Holes 60 cm dia, and 60 cm deep. Each 800 ₹ 21.60 ₹ 17,280.00
TREES
DSR 2016 Wodyetia Difurcata Each 20 ₹ 1,100.00 ₹ 22,000.00
UADD SOR
Sl.No. VOL-II Item Description Unit Quantity Rate Amount
DSR 2016 Callistemon Each 5.00 ₹ 60.00 ₹ 300.00
SHRUBS
Non SOR Thuja Occidentalis Each 10.00 ₹ 100.00 ₹ 1,000.00
Creepers /CLIMBERS
Ground
Cover
REST OF
THEM
(450mm
water
depth)
22 Non SOR (papyrus sedge) Sqm ₹ 45.00 20 ₹ 900.00
23 Non SOR Reed Sqm ₹ 60.00 10 ₹ 600.00
24 Non SOR bur reed (Sparganium) Sqm ₹ 55.00 20 ₹ 1,100.00
common club-rush (Schoeneoplectus
25 Non SOR Sqm ₹ 110.00 10 ₹ 1,100.00
lacustris)
26 Non SOR Water Soldier (Stratiotes) Sqm ₹ 75.00 10 ₹ 750.00
FIBROUS
ROOTED
(some
inches
below
water
surface)
27 Non SOR Sweet flag (Acorus calamus) Sqm ₹ 125.00 30 ₹ 3,750.00
28 Non SOR VETIVER (Chrysopogon zizanioides) Sqm ₹ 120.00 30 ₹ 3,600.00
29 Non SOR Thlaspi Sqm ₹ 60.00 20 ₹ 1,200.00
Dewatering of water caused by springs, tides
30 2.13 or river seepage, broken water mains or KL ₹ 45.90 500 ₹ 22,950.00
drains or well or the like.
TOTAL (INR) ₹ 4,25,767.00
1 Current Rating -125 Amps & 70% -100% adjustable Each ₹ 13,940.00 2 ₹ 27,880.00
1 For stone slab roof "J" Type hook Each ₹ 78.00 35 ₹ 2,730.00
2 For R.C.C. Slabs / Beams Each ₹ 26.00 10 ₹ 260.00
Supplying and fixing fan clamps with hook on existing
34 10.7 T.W. beam/ trusses with required size flat iron etc.as Each ₹ 65.00 35 ₹ 2,275.00
per specification complete :-
Section 5
FORM OF AGREEMENT
Whereas the Employer is desirous that the Contractor execute (name and identification number of
Contract) (hereinafter called "the Works") and the Employer has accepted the Bid by the Contractor
for the execution and completion of such Works and the remedying of any defects therein, at a cost
of Rs.
1. In this Agreement, words and expression shall have the same meanings as are respectively assigned
to them in the conditions of contract hereinafter referred' to and they shall be deemed to form and be
ready and construed as part of this Agreement.
3. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying the defects wherein Contract Price or such other sum as
may become payable under the provisions of the Contract at the times and in the manner prescribed
by the Contract.
4. The following documents shall be deemed to form and be ready and construed as part of this
Agreement viz.
i. Letter of Acceptance
ii. Contractor's Bid
iii. Condition of Contract: General and Special
iv. Contract Data
v. Bid Data
vi. Drawings
vii. Bill of Quantities
viii. Employer’s requirements and
ix. Any other documents listed in the Contract Data as forming part of the Contract.
In witnessed whereof the parties there to have caused this Agreement to be executed the day and year
first before written. The Common Seal of was hereunto affixed in the presence of:
Section 6
FITTINGS
Automatic pH / Redox Controller Astral, Spain Code: 57140/Eq.
Chemical Solution Preparation Tank Feather tuff/ Eq.
Motorised Stirring System Feather tuff/ Eq.
Main Drains Grill Feather tuff / Eq.
Bottom Inlets Astral, Spain Code: 00303 / Eq.
Plumbing Wall Connectors/Pipes Supreme / eq.