Concrete Pour Card: 1 General
Concrete Pour Card: 1 General
1 GENERAL
1.1 Date of Inspection
1.2 Name of work Construction of various 683 Family Qtrs
1.3 Name of agency Kamal & Associates Pvt Ltd
1.4 Location Type-2 Block- Raft Foundation
1.5 Architectural Drawing No. N/A
1.6 Structural Drawing No. 022020SSSPL/CRPFQTR/CHANDAULI/K&A/TYPE-2/ST-01
1.7 Approximate quantity and grade of concrete 160.791 Cum M-25
1.8 Expected Start Time
1.9 Expected Finish Time
1.10 Name of Contractor's Engineer
2 Centering Type Yes No N/A
2.1 Adequate vertical supports Ply
2.2 Adequate lateral supports Ply
2.3 O.k Ply
3 SHUTTERING Type Yes No N/A
3.1 Cleaned Ply
3.2 Oiled Ply
3.3 Levelled Ply
3.4 Hole Plugged Ply
3.5 O.K Ply
4 REINFORCEMENT Type Yes No N/A
4.1 Cover Blocks CC
4.2 Conforms to drawings Structural
4.3 Tied Properly Structural
4.4 Space Bars/Chairs Structural
4.5 Pre-stressing oprations completed Structural
5 CONCRETE Type Yes No N/A
5.1 Plant information about mix Design Mix
5.2 Transit mixer ready
5.3 Tower crane ready
5.4 Concrete pump ready Hydrolic
5.5 Vibrators (Electrical & Diesel ready) Electrical
5.6 Predetermind Holes left wherevernrequired
5.7 Boards for construction joints
5.8 Conduits placed in position
5.9 Fan clamps placed in position
5.10 Steel templates
5.11 Cement slurry
5.12 Slump Test IS 1199
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)
SIGNATURE
The above information filled by me after proper verification (SITE ENGINEER OF FIRM)