0% found this document useful (0 votes)
295 views

Electronics Permit (Back)

This document outlines the process for obtaining permits for electronics works. It includes: 1. Receiving five sets of electronics documents including plans, specifications, cost estimates and bills of materials. 2. Tracking the progress of the permit application with dates and times the documents are received and processed. 3. Assessing applicable fees which are paid prior to permit issuance. 4. Stipulating permit conditions including conforming with electronics codes and standards, submitting as-built documents after completion, and requiring a building permit.

Uploaded by

The Matrix
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
295 views

Electronics Permit (Back)

This document outlines the process for obtaining permits for electronics works. It includes: 1. Receiving five sets of electronics documents including plans, specifications, cost estimates and bills of materials. 2. Tracking the progress of the permit application with dates and times the documents are received and processed. 3. Assessing applicable fees which are paid prior to permit issuance. 4. Stipulating permit conditions including conforming with electronics codes and standards, submitting as-built documents after completion, and requiring a building permit.

Uploaded by

The Matrix
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION

BOX 7
RECEIVED BY: DATE:

FIVE (5) SETS OF ELECTRONICS DOCUMENTS

ELECTRONICS PLANS AND SPECIFICATIONS COST ESTIMATES

BILL OF MATERIALS OTHERS (Specify) ____________________________________

BOX 8

PROGRESS FLOW
IN OUT
PROCESSED BY:
DATE TIME DATE TIME

ELECTRONICS
OTHERS (Specify)

BOX 9 (TO BE ACCOMPLISHED BY THE ELECTROICS SECTION OF THE OFFICE OF THE BUILDING OFFICIAL)
ASSESSED FEES

AMOUNT DUE ASSESSED BY O.R. NUMBER DATE PAID REVIEWED BY:


ELECTRONICS

OTHERS (Specify)
CHIEF, PROCESSING AND EVALUATION DIVISION

BOX 10

ACTION TAKEN:
PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:

1. That the proposed electronics works shall be in accordance with the electronics plans filed with this Office and in
conformity with the latest Electronics Code of the Philippines, the National Building Code and its IRR.
2. That upon completion of the electronic works, the licensed supervisor/in-charge shall submit the entry to the logbook
duly signed and sealed to the building official including as-built plans and other documents and shall also accomplish the
Certificate of Completion stating that the electronic works conform to the provision of the Electronics Code of the
Philippines, the National Building Code and its IRR.
3. That this permit is null and void unless accompanied by the building permit.

PERMIT ISSUED BY:

AUREA M. PASCUAL, DM, MBA, CE, GE, ENP, REB

CITY BUILDING OFFICIAL


(Signature Over Printed Name)
Date ____________________

You might also like