Project Planner: Start Date Today Date

This document shows a project plan and actual progress for a project with a start date of August 21st and planned completion by September 28th. The plan shows expected progress in each period from August 21st to September 28th, while actual shows progress achieved on specific dates, with the project currently behind schedule as of September 14th.

Uploaded by

Biswajet Routh
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
124 views

Project Planner: Start Date Today Date

This document shows a project plan and actual progress for a project with a start date of August 21st and planned completion by September 28th. The plan shows expected progress in each period from August 21st to September 28th, while actual shows progress achieved on specific dates, with the project currently behind schedule as of September 14th.

Uploaded by

Biswajet Routh
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Project Planner Plan Actual

TODAY
START DATE 21-Aug-18 15-Sep-18
DATE

PERIODS
21-Aug-18
22-Aug-18
23-Aug-18
24-Aug-18
27-Aug-18
28-Aug-18
29-Aug-18
30-Aug-18
31-Aug-18

10-Sep-18
11-Sep-18
12-Sep-18
13-Sep-18
14-Sep-18
17-Sep-18
18-Sep-18
19-Sep-18
20-Sep-18
21-Sep-18
24-Sep-18
25-Sep-18
26-Sep-18
27-Sep-18
28-Sep-18
3-Sep-18
4-Sep-18
5-Sep-18
6-Sep-18
7-Sep-18

1-Oct-18
2-Oct-18
3-Oct-18
4-Oct-18
5-Oct-18
PROJECT FINISH ACTUAL ACTUAL
ACTIVITY OWNER NAME START DATE DATE START DATE FINISH DATE
Enter Task 1 Enter Name 2-Sep-18 12-Sep-18 3-Sep-18 13-Sep-18

Task 2 22-Sep-18 29-Sep-18 23-Sep-18 3-Sep-18

Task 3 27-Aug-18 5-Sep-18 28-Aug-18 7-Sep-18

Task 4 17-Sep-18 26-Sep-18 19-Sep-18 30-Sep-18

Task 5 23-Aug-18 29-Aug-18 31-Aug-18 4-Sep-18

Task 6 25-Aug-18 29-Aug-18 26-Aug-18 29-Aug-18

Task 7 24-Aug-18 29-Aug-18 27-Aug-18 30-Aug-18

Task 8 5-Sep-18 19-Sep-18 6-Sep-18 5-Oct-18

Task 9 28-Sep-18 5-Oct-18 29-Sep-18 4-Oct-18

Make beautiful timelines in PowerPoint for important meetings. Instantly turn Excel data into PowerPoint slides with the Office Timeline add-in for PowerPoint.

www.officetimeline.com
3 Easy steps to instantly turn Excel data into a PowerPoint slide
1. Download the Free Office Timeline plug-in for PowerPoint - 14-day Free Trial.

2. Open PowerPoint and click on NEW Timeline from the Office Timeline tab inside of PowerPoint.
Copy your Excel Project Planner table and paste it into Office Timeline with the PASTE button.

3. Click the green SAVE button to instantly produce your Project Plan slide.