This document outlines method statements for various construction projects related to the expansion of the Shaybah Residential and Industrial Complex. It lists 19 method statements submitted from May 2011 to March 2012 related to tasks such as relocating security fences, excavation, concrete pouring, pipe installation, and brazing control. The document tracks each method statement submission with a reference number, date, and notes on its status and any required revisions or approvals.

Uploaded by

Ziaul Haq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
393 views

3) Method of Statement

This document outlines method statements for various construction projects related to the expansion of the Shaybah Residential and Industrial Complex. It lists 19 method statements submitted from May 2011 to March 2012 related to tasks such as relocating security fences, excavation, concrete pouring, pipe installation, and brazing control. The document tracks each method statement submission with a reference number, date, and notes on its status and any required revisions or approvals.

Uploaded by

Ziaul Haq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

SHAYBAH RESIDENTIAL AND INDUSTRIAL COMPLEX EXPANSION PROJECT

Contract No.6600026594 BI No. 10-00774-001

METHOD STATEMENT
DATE UPDATED : Friday, April 01, 2016
RESPONSE OPEN TO
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

1 Method statement for relocation of security fence NO. 01 EW&ID/RIC/L-062/11 30-May-11 CLOSED CLOSED APPROVED
May 29, 2011 023-RIC-005/11
Method of Statement of New Majles Foundation, Excavation,
2
June 28, 2011 023-RIC-033/11 Backfilling & Compaction NO. 02

3 Method of Statement for Dewatering Excavation NO. 03 EW&ID/RIC/L-0133/11 11-Jul-11 CLOSED CLOSED APPROVED
July 5, 2011 023-RIC-049/11

4 METHOD STATEMENT NO.03 REV.01 - FOR DEWATERING OF EW&ID/RIC/T-0820/12 19-Jun-12 CLOSED CLOSED APPROVED
JUNE 16.2012 023-RIC-T-612/12 AN EXCAVATION
Method of Statement / Contingency Plan for Chilled Water Line N0.
5 EW&ID/RIC/L-0169/11 26-Jul-11 CLOSED CLOSED APPROVED
July 25, 2011 023-RIC-077/11 04
Method of Statement for Con. Pouring, Conc. Defects & Conc. Curing
6 EW&ID/RIC/L-0190/11 21-Aug-11 CLOSED CLOSED APPROVED
August 14, 2011 023-RIC-0116/11 NO. 05

CONTRACTOR SUBMITTED REV.


7 EW&ID/RIC/T-0406/11 16-Oct-11 CLOSED CLOSED
DATED OCTOBER 24
October 3, 2011 023-RIC-0206/11 Method Statement - Concrete Defects NO. 06

8 22-Apr-12 CLOSED CLOSED


October 12, 2011 023-RIC-0229/11 Method of Statement - Main feeder of temporary majles
9 CLOSED CLOSED REVISED
October 24, 2011 023-RIC-0255/11 Method of Statement - Concrete Defects NO. 06 EW&ID/RIC/T-512/11 14-Nov-11

COMPLY WITH THE ATTACHED


10 Method Statement - Concrete Defects - Response NO. 06 EW&ID/RIC/T-0162/12 4-Feb-12 CLOSED CLOSED
PID COMMENTS
January 22.2012 023-RIC-0255A/12

11 Method statement of adhesive Bonded joint (final approval for all EW&ID/RIC/T-766/11 1-Jan-12 CLOSED CLOSED APPROVED WITH COMMENTS
December 23,2011 023-RIC-0432/11 RTR)
Method of Statement for Concrete Chipping( Grade Beam Rebar ) OTHERS SPECIFY/
12 CLOSED CLOSED
January 01.2012 023-RIC-0452/12 NO. 07 WCOMMENTS
Method of Statement for Preparation for Sand Bedding & backfilling
13 EW&ID/RIC/T-0215/12 9-Feb-12 CLOSED CLOSED APPROVED WITH COMMENTS
January 03.2012 023-RIC-0464/12 at Dune Sand Area NO. 08
PLESE FIND THE ATTACHED
14 EW&ID/RIC/T-057/12 15-Jan-12 CLOSED CLOSED
January 10.2012 023-RIC-0479/12 Method of Statement - Shaded Car Parking for Airport Terminal REFERENCE DOCUMENT
Method Statement for Hydro statistic test of 6'' RTR Portable Water
15 EW&ID/RIC/T-0109/12 24-Jan-12 CLOSED CLOSED APPROVED WITH COMMENTS
January 16.2012 023-RIC-0497/12 line NO. 09
16 EW&ID/RIC/T-0288/12 20-Feb-12 CLOSED CLOSED APPROVED AS NOTED
January 19.2012 023-RIC-0501/12 Method Statement 0f Pipe Trench Excavation NO. 010

Prepared by: Jailo A. Bantiyan


Page 1 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

CONTRACTOR HAS TO PROVIDE


THE PROCEE APPLICATION &
17 EW&ID/RIC/L-0126/12 13-Feb-12 CLOSED CLOSED
APPLICATION SCOPE OF
January 31.2012 023-RIC-529/12 Method Statement of Brazing Control NO.011 WORKS

REJECTED CONTRACTOR TO
18 EW&ID/RIC/T-0346/12 4-Mar-12 CLOSED CLOSED COMPLY W/ SAPMT COMMENTS
PER EW & ID/RIC/L-126/12
Mar.01.2012 023-RIC-T-244/12 Method Statement of Brazing Control - NO. 011 REV.1

AS PER SIGNED GENERAL


19 Method Statement of Brazing Control - NO. 011 REV.2 CLOSED CLOSED
APPROVAL DATED ON 7/14/12
Mar.21.2012 023-RIC-T-308/12 FROM (PMT-ARAMCO)

20 Method Statement - Road crossing Installation of' 6'' RTR Pipe NO. EW&ID/RIC/T-0181/12 5-Feb-12 CLOSED CLOSED REVISED
January 31.2012 023-RIC-532/12 012
21 REVISED - Method Statement - Road crossing Installation of' 6'' RTR EW&ID/RIC/L-0117/12 13-Feb-12 CLOSED CLOSED APPROVED AS NOTED
February 09.2012 023-RIC-532A/12 Pipe NO. 012
22 EW&ID/RIC/T-0180/12 5-Feb-12 CLOSED CLOSED REVISED
January 31.2012 023-RIC-533/12 Method Statement - Relocation Fire Hydrant NO. 014
23 EW&ID/RIC/T-0269/12 19-Feb-12 CLOSED CLOSED APPROVED AS NOTED
February 08.2012 023-RIC-533A/12 Method Statement - Relocation Fire Hydrant NO. 014
24 EW&ID/RIC/T-0182/12 5-Feb-12 CLOSED CLOSED REVISED
February 02.2012 023-RIC-536/12 Method Statement of Electrical Cable Duct Bank
25 EW&ID/RIC/T-0211/12 8-Feb-12 CLOSED CLOSED APPROVED AS NOTED
February 06.2012 023-RIC-536A/12 Method Statement of Electrical Cable Duct Bank - REVISED
26 EW&ID/RIC/T-0268/12 19-Feb-12 CLOSED CLOSED APPROVED AS NOTED
February 02.2012 023-RIC-539/12 Method Statement of Pipe Layout Along Hills NO. 015
27 EW&ID/RIC/T-0284/12 20-Feb-12 CLOSED CLOSED APPROVED AS NOTED
February 20.2012 023-RIC-575/12 Method Statement - Relocation Of Lighting Pole

EW&ID/RIC/T-319/12 2/27/2012
28 Method Statement - MECH'L Works Dining & Kitchen Commissary EW&ID/RIC/L-136-12 CLOSED CLOSED REVISE AND RESUBMIT
FEB-29-12
February 20.2012 023-RIC-576/12
EW&ID/RIC/T-0282/12 2/21/2012
29 EW&ID/RIC/L-135-12 CLOSED CLOSED REVISED
29-FEB-12
February 21.2012 023-RIC-579/12 Method Statement - ELEct'L. Works Dining & Kitchen Commissary

30 METHOD STATEMENT-DINING HALL EXPANSION - ( RESPONSE EW&ID/RIC/T-0369/12 10-Mar-12 CLOSED CLOSED APPROVED AS NOTED
Mar.06.2012 023-RIC-255/12 TO REF.EW&ID/RIC/L-135-12)
Method Statement - Form Stripping & Re- Shoring of concreted
31 EW&ID/RIC/T-0313/12 28-Feb-12 OPEN REVISE AND RESUBMIT
Elevated Girder / Beams/ Slabs NO. 016
February 23.2012 023-RIC-T-206/12
MS-SDMEP-17 - Method Statement - Shoring & Dewatering of
32 EW&ID/RIC/T-0314/12 27-Feb-12 REVISED
February 23.2012 023-RIC-T-211/12 Manhole Excavation & Installation for MEP Services CLOSED CLOSED
MS-SDMEP-17 ( REV.01 ) Method Statement - Shoring &
33 EW&ID/RIC/T-0359/12 6-Mar-12 CLOSED CLOSED APPROVED AS NOTED
Mar.01.2012 023-RIC-T-245/12 Dewatering of Manhole Excavation & Installation for MEP Services
34 EW&ID/RIC/T-0318/12 27-Feb-12 CLOSED CLOSED 023-RIC-L-700/12
February 24.2012 023-RIC-T-214/12 MS - PO - 018 - Method Statement - Piling Operation
35 EW&ID/RIC/T-0364/12 10-Mar-12 CLOSED CLOSED 023-RIC-L-700/12
Mar.05.2012 023-RIC-T-250/12 MS - PO - 017 rev.1 - Method Statement - Piling Operation
36 EW&ID/RIC/T-0471/12 2-Apr-12 CLOSED CLOSED 023-RIC-L-700/12
Mar.31.2012 023-RIC-T-337/12 MS - PO - 017 rev.2 - Method Statement - Piling Operation
37 EW&ID/RIC/T-0566/12 23-Apr-12 CLOSED CLOSED APPROVED AS NOTED
APRIL 17 2012 023-RIC-T-700 /12 Piling Operation - Response rev.03

Prepared by: Jailo A. Bantiyan


Page 2 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

38 EW&ID/RIC/T-0383/12 14-Mar-12 CLOSED CLOSED REVISED


Mar.05.2012 023-RIC-T-265/12 MS-RCD-018 - Method Statement - Repairing of Concrete Voids
MS-RCD-018 REV.1 - Method Statement - Repairing of Concrete
39 EW&ID/RIC/T-0462/12 9-Apr-12 CLOSED CLOSED APPROVED
Mar.28.2012 023-RIC-T-330/12 Voids
APPROVED AS NOTED FOR
40 EW&ID/RIC/T-0431/12 27-Mar-12 CLOSED CLOSED
Mar.21.2012 023-RIC-T-305/12 METHOD STATEMENT - TERMINAL BLDG EXPANSION PHASE 1 & 2 ONLY
METHOD STATEMENT - Repair of Damaged Pre-Stressed precast
41 EW&ID/RIC/T-0480/12 8-Apr-12 CLOSED CLOSED APPROVED AS SUBMITTED
APRIL 1.2012 023-RIC-T-335/12 Hollow Core Slab ( Ranco & Zamil )
42 EW&ID/RIC/T-0531/12 18-Apr-12 CLOSED CLOSED ACCEPTED W/ COMMENTS
APRIL 9.2012 023-RIC-T-370/12 METHOD STATEMENT - Tank for Cathodic Protection System
43 EW&ID/RIC/T-696/12 23-May-12 CLOSED CLOSED NO OBJECTION AS NOTED
MAY 05.2012 023-RIC-T-465/12 LCC SIPOREX ERECTION PROCEDURE AT RESD'L BLDG.

EW&ID/RIC/T-619/13 PROVIDE JOB SAFETY


44 METHOD STATEMENT NO. 019 STRUCTURAL & EW&ID/RIC/T-914/13 23-Jul-13 CLOSED CLOSED
ANALYSIS
MAY 12.2012 023-RIC-T-496/12 MISCELLANEOUS STEEL ERECTION
METHOD STATEMENT NO. 019 STRUCTURAL &
45 MISCELLANEOUS STEEL ERECTION (ATTACHED JSA PRIOR TO CLOSED CLOSED FOR INFO
NOVEMBER 17 2013 023-RIC-T-496A/12 CLOSED)

46 MOS-CONCRETE CHIPPING FOR THE CASTED CORBEL EW&ID/RIC/T-0677/12 19-May-12 CLOSED CLOSED APPROVED AS NOTED
MAY 17.2012 023-RIC-T-512/12

47 METHOD STATEMENT NO. 019 - CONCRETE CORING FOR EW&ID/RIC/T-0693/12 21-May-12 CLOSED CLOSED APPROVED AS NOTED
MAY 19.2012 023-RIC-T-517/12 MECHANICAL AND ELECTRICAL

48 METHOD STATEMENT NO. 020 - CONCRETE CORING FOR EW&ID/RIC/T-0744/12 12-Jun-12 CLOSED CLOSED APPROVED AS NOTED
MAY 30.2012 023-RIC-T-552/12 TELECOM

49 METHOD STATEMENT NO. 021 - HYDROSTATIC TEST FOR EW&ID/RIC/T-0808/12 18-Jun-12 CLOSED CLOSED REJECTED
JUNE 9.2012 023-RIC-T-590/12 UNDERGROUND UTILITIES

50 METHOD STATEMENT NO. 021 REV.01 - HYDROSTATIC EW&ID/RIC/T-0817/12 18-Jun-12 CLOSED CLOSED APPROVED WITH COMMENTS
JUNE 18.2012 023-RIC-T-625/12 (HYDROTEST RTR) FOR UNDERGROUND UTILITIES

51 JUNE 10.2012 023-RIC-T-593/12 plastering using vetinit premix plaster ms-pp-c-022 EW&ID/RIC/T-0831/12 20-Jun-12 CLOSED CLOSED REVIEWED WITH COMMENTS

52 METHOD STATEMENT WORK FOR TANK CONSTRUCTION (AL- EW&ID/RIC/T-0832/12 23-Jun-12 CLOSED CLOSED REVIEWED WITH COMMENTS
JUNE 11.2012 023-RIC-T-596/12 KHODARI HEAVY EQUIPMENT)

53 REVISED METHOD STATEMENT WORK FOR TANK EW&ID/RIC/T-0927/12 17-Jul-12 CLOSED CLOSED APPROVED AS NOTED
JULY 5.2012 023-RIC-T-596A/12 CONSTRUCTION (AL-KHODARI HEAVY EQUIPMENT)
METHOD STATEMENT NO. 023 - UNDERGROUND UTILITIES REVISED BY REF. 023-RIC-SITE-
54 EW&ID/RIC/T-0866/12 1-Jul-12 CLOSED CLOSED
JUNE 23.2012 023-RIC-T-637/12 PIPE JACKETING-CASING 905-12

55 REVISED METHOD STATEMENT NO. 023 - UNDERGROUND EW&ID/RIC/T-0894/12 11-Jul-12 CLOSED CLOSED APPROVED AS NOTED
JULY 5.2012 023-RIC-L-905/12 UTILITIES PIPE JACKETING-CASING

METHOD STATEMENT NO. 024 - CHIPPING AND EDGING OF


56 ESTABLISHED CMU WALLS FOR CIVIL,MECHANICAL AND EW&ID/RIC/T-0925/12 17-Jul-12 CLOSED CLOSED APPROVED AS SUBMITTED
JULY 10.2012 023-RIC-T-673/12 ELECTRICAL WALL OPENINGS
REJECTED / RESPONSE
57 METHOD STATEMENT NO.025 - CHIPPING OF ESTABLISHED EW&ID/RIC/T-0926/12 17-Jul-12 OPEN
REQUIRED
JULY 11.2012 023-RIC-T-677/12 CONCRETE FOR ANCHOR BOLT POCKETS
CONFIRMED FROM PMT
58 METHOD STATEMENT FOR THE CATHODIC PROTECTION EW&ID/RIC/T-0994/12 9-Aug-12 CLOSED CLOSED
DOC/CON DEC.08, 2013
AUGUST 01.2012 023-RIC-L-969/12 INSTALLATION FOR THE WATER TANK

Prepared by: Jailo A. Bantiyan


Page 3 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

59 METHOD STATEMENT NO.26 CUTTING & CHIPPING OF EW&ID/RIC/T-1012/12 14-Aug-12 CLOSED CLOSED APPROVED AS NOTED
AUGUST 09.2012 023-RIC-T-756/12 EXISTING LINTEL BEAMS & DECORATIVE PANELS

60 EW&ID/RIC/T-1099/12 10-Sep-12 CLOSED CLOSED REJECTED


AUGUST 12.2012 023-RIC-T-763/12 METHOD STATEMENT NO.027 HVAC LIGHT TEST PROCEDURE

61 METHOD STATEMENT NO.027 REV.01 HVAC LIGHT TEST EW&ID/RIC/T-1221/12 3-Oct-12 CLOSED CLOSED APPROVED WITH COMMENTS
SEPT 12.2012 023-RIC-T-838/12 PROCEDURE
METHOD STATEMENT NO.028 COATING APPLICATION
62 PROCEDURE FOR COPPER AND CARBON STEEL PIPING EW&ID/RIC/T-1236/12 7-Oct-12 CLOSED CLOSED APPROVED AS NOTED
AUGUST 29.2012 023-RIC-T-800/12 (UNDERGROUND PIPING) APCS 113A

CONFIRMED FROM PMT


63 WQMM ITEM # 3.5.68 METHOD STATEMENT OF HOLLOW CORE EW&ID/RIC/T-1174/12 25-Sep-12 CLOSED CLOSED
DOC/CON DEC.27, 2012
SEPT 12.2012 023-RIC-T-837/12 CUTTING AT SITE

PLEASE FIND REF.DOCUMENT


64 METHOD STATEMENT NO.029 FOR INSTALLATION OF PRECAST EW&ID/RIC/T-1159/12 19-Sep-12 CLOSED CLOSED
REVIEWED WITH COMMENTS
SEPT 15.2012 023-RIC-T-844/12 FIBERGLASS MANHOLE WITH REINFORCED CONCRETE BASE
METHOD STATEMENT NO.029rev.01 FOR INSTALLATION OF
65 PRECAST FIBERGLASS MANHOLE WITH REINFORCED EW&ID/RIC/T-1222/12 3-Oct-12 CLOSED CLOSED APPROVED WITH COMMENTS
SEPT 27.2012 023-RIC-T-888/12 CONCRETE BASE

66 METHOD STATEMENT NO.030 HYDROTEST FOR COPPER EW&ID/RIC/T-1255/12 9-Oct-12 CLOSED CLOSED APPROVED WITH COMMENTS
SEPT 15.2012 023-RIC-T-845/12 PIPING (AG/UG PIPING)

67 METHOD STATEMENT NO.031 FLUSHING/CLEANING OF EW&ID/RIC/T-1232/12 6-Oct-12 CLOSED CLOSED APPROVED AS NOTED
SEPT 16.2012 023-RIC-T-849/12 UNDERGROUND UTILITIES PIPE WORK

68 METHOD STATEMENT NO.032 EXCAVATION OF SUMP PIT AT EW&ID/RIC/T-1196/12 30-Sep-12 OPEN COMMENTS FOR YOUR ACTION
SEPT 17.2012 023-RIC-T-854/12 SUB-STATION

69 METHOD STATEMENT NO.033 REPAIRING OF CRACKS ON EW&ID/RIC/T-1230/12 6-Oct-12 CLOSED CLOSED APPROVED AS NOTED
SEPT 18.2012 023-RIC-T-856/12 FLOOR SCREED AT RESD'L BLDGS

70 METHOD STATEMENT NO.034 HVAC AND UTILITY PIPING EW&ID/RIC/T-1216/12 3-Oct-12 OPEN REVISE AND RESUBMIT
SEPT 27.2012 023-RIC-T-887/12 HANGERS AND SUPPORTS

71 EW&ID/RIC/T-1359/12 8-Nov-12 CLOSED CLOSED APPROVED AS NOTED


METHOD STATEMENT NO.035 RELOCATION OF WALL
NOV 06.2012 023-RIC-T-982/12 OPENINGS@MECHANICAL ROOM WALL

72 EW&ID/RIC/T-1419/12 21-Nov-12 CLOSED CLOSED APPROVED AS NOTED


METHOD STATEMENT NO.036 INSTALLATION OF REBAR FOR
NOV 20.2012 023-RIC-T-1039/12 THE EXTENDED PORTION OF FIRE WALL@RESD'L BLDGS.

73 EW&ID/RIC/T-1458/12 2-Dec-12 CLOSED CLOSED REVISED


METHOD STATEMENT NO.037 INSTALLATION OF HOLLOW
NOV 27.2012 023-RIC-T-1056/12 CORE SLAB BEARING PAD@GRID 7 AND 11

74 METHOD STATEMENT NO.037 REV.01 INSTALLATION OF EW&ID/RIC/T-003/13 2-Jan-13 CLOSED CLOSED ACCEPTED WITH COMMENTS
DEC 27.2012 023-RIC-T-1127/12 HOLLOW CORE SLAB BEARING PAD@GRID 7 AND 11
AS PER ENGR. JONEL
75 REFER TO TSQ C- METHOD STATEMENT NO.038 - GROUTING,CHIPPING OF MANUEL JAN.02,2013 REFER TO TSQ C-129B
10:00 A.M
129B ESTABLISHED CONCRETE FOR ANCHOR BOLT POCKETS

Prepared by: Jailo A. Bantiyan


Page 4 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

76 METHOD STATEMENT NO.039 EXCAVATION CABLE PULLING EW&ID/RIC/T-016/13 12-Jan-13 CLOSED CLOSED REVISED
JAN 02.2013 023-RIC-T-1147/13 UNDER EXISTING SUBSTATION # 40
CONTRACTOR TO COMBINED
THIS MOS TO MOS NO.041 BOTH
77 EW&ID/RIC/T-095/13 27-Jan-13 CLOSED CLOSED
METHOD STATEMENT NO.039 REV.01 EXCAVATION CABLE SHOULD BE PART OF THE
JAN 21.2013 023-RIC-T-1224/13 PULLING UNDER EXISTING SUBSTATION # 40 PROCEDURE

78 EW&ID/RIC/T-078/13 22-Jan-13 CLOSED CLOSED APPROVED AS NOTED


JAN 14.2013 023-RIC-T-1180/13 METHOD STATEMENT NO.040 ASPHALT CONCRETE PAVING

79 METHOD STATEMENT NO.041 CUT-OVER AND SWITCH-OVER EW&ID/RIC/T-094/13 27-Jan-13 CLOSED CLOSED REVISED
JAN 21.2013 023-RIC-T-1225/13 PLAN/PROCEDURE FOR EXISTING SUBSTATION # 40
METHOD STATEMENT NO.041 REV.01 - CUT-OVER AND
80 SWITCH-OVER PLAN/PROCEDURE FOR EXISTING SWITCH EW&ID/RIC/T-686/14 27-Jan-13 CLOSED CLOSED APPROVED
SEPTEMBER 30 2013 023-RIC-T-2438/13 GEAR S-301 AT SUBSTATION # 40

81 METHOD STATEMENT NO.042 - DEWATERING EXCAVATED EW&ID/RIC/T-119/13 30-Jan-13 CLOSED CLOSED REVISED
JAN 27.2013 023-RIC-T-1254/13 AREAS AROUND RESD'L BLDG. PREMISES

82 METHOD STATEMENT NO.042 REV.01 - DEWATERING EW&ID/RIC/T-164/13 10-Feb-13 CLOSED CLOSED APPROVED AS NOTED
FEB 7.2013 023-RIC-T-1318/13 EXCAVATED AREAS AROUND RESD'L BLDG. PREMISES

83 METHOD STATEMENT NO.043 - REPAIRING OF PLASTERED EW&ID/RIC/T-201/13 17-Feb-13 CLOSED CLOSED APPROVED AS NOTED
FEB 14.2013 023-RIC-T-1356/13 WALLS WITH VOIDS AND CRACKS

84 METHOD STATEMENT FOR INSTALLATION OF HOLLOW CORE EW&ID/RIC/T-322/13 10-Mar-13 CLOSED CLOSED REVISED
FEB 27.2013 023-RIC-T-1444/13 STEEL HANGER (L.B.E. 6704)

85 METHOD STATEMENT FOR INSTALLATION OF HOLLOW CORE EW&ID/RIC/T-382/13 24-Mar-13 CLOSED CLOSED APPROVED AS NOTED
MAR 17.2013 023-RIC-T-1538/13 STEEL HANGER REV.01 (L.B.E. 6704)
METHOD STATEMENT NO.044 - PROCEDURE AND PLAN FOR
86 REPAIRING NON UNIFORMITY OF COLUMNS AND BEAMS IN EW&ID/RIC/T-324/13 11-Mar-13 CLOSED CLOSED REVISED
MAR 09.2013 023-RIC-T-1497/13 LINE AND PLUMBNESS
METHOD STATEMENT NO.044 REV.01 - PROCEDURE AND PLAN
87 FOR REPAIRING NON UNIFORMITY OF COLUMNS AND BEAMS EW&ID/RIC/T-383/13 24-Mar-13 CLOSED CLOSED REVISED
MAR 20.2013 023-RIC-T-1557/13 IN LINE AND PLUMBNESS
METHOD STATEMENT NO.044 REV.02 - PROCEDURE AND PLAN
88 FOR REPAIRING NON UNIFORMITY OF COLUMNS AND BEAMS EW&ID/RIC/T-409/13 27-Mar-13 CLOSED CLOSED APPROVED AS SUBMITTED
MAR 26.2013 023-RIC-T-1587/13 IN LINE AND PLUMBNESS

89 METHOD STATEMENT NO.045 - INSTALLATION AND EW&ID/RIC/T-413/13 16-Apr-13 CLOSED CLOSED BY REF.023-RIC-T-1766/13
MAR 17.2013 023-RIC-T-1541/13 CONNECTION OF FLANGES AND BOLT TIGHTENING

90 METHOD STATEMENT NO.046 - NEOPRENE WRAPPING FOR EW&ID/RIC/T-414/13 31-Mar-13 CLOSED CLOSED APPROVED AS NOTED
MAR 20.2013 023-RIC-T-1559/13 RTR PIPE LINE
METHOD STATEMENT NO.047 - EXCAVATION AND SHORING
91 INSTALLATION FOR THE SANITARY SEWER LINE AT EW&ID/RIC/T-431/13 2-Apr-13 CLOSED CLOSED REVISED
APRIL 01.2013 023-RIC-T-1610/13 NORTH,SOUTH AND WEST SIDE OF BLDG.221

Prepared by: Jailo A. Bantiyan


Page 5 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

METHOD STATEMENT NO.047 REV.01 - EXCAVATION AND


92 SHORING INSTALLATION FOR THE SANITARY SEWER LINE AT EW&ID/RIC/T-454/13 13-Apr-13 CLOSED CLOSED APPROVED AS NOTED
APRIL 08.2013 023-RIC-T-1632/13 NORTH,SOUTH AND WEST SIDE OF BLDG.221

93 METHOD STATEMENT NO.048 - APPLICATION OF WATER EW&ID/RIC/T-453/13 13-Apr-13 CLOSED CLOSED REVISED
APRIL 06.2013 023-RIC-T-1624/13 PROOFING ON WET AREAS

94 METHOD STATEMENT NO.048 REV.01 - APPLICATION OF EW&ID/RIC/T-572/13 6-May-13 CLOSED CLOSED REVISED
APRIL 30.2013 023-RIC-T-1724/13 WATER PROOFING ON WET AREAS

CONFIRMED FROM PMT


95 METHOD STATEMENT NO.048 REV.02 - APPLICATION OF EW&ID/RIC/T-654/13 26-May-13 CLOSED CLOSED
DOC/CON AUG.06 2013
MAY 21 2013 023-RIC-T-1835/13 WATER PROOFING ON WET AREAS

96 METHOD STATEMENT NO.049 - AIR HANDLING UNIT FOR EW&ID/RIC/T-457/13 15-Apr-13 CLOSED CLOSED NO OBJECTION AS NOTED
APRIL 06.2013 023-RIC-T-1628/13 RESIDENTIAL BUILDING

EW&ID/RIC/T-576/13 5/6/2013
97 METHOD STATEMENT NO.050 - TEMPORARY CHILLED WATER EW&ID/RIC/T-566/13 CLOSED CLOSED APPROVED AS NOTED
5/5/2013
MAY 4.2013 023-RIC-T-1760/13 LINE PIPE SUPPORT PUMP HOUSE

EW&ID/RIC/T-620/13
98 METHOD STATEMENT NO.051 - REPAIRING OF CRACKS ON EW&ID/RIC/T-658/13 19-May-13 CLOSED CLOSED APPROVED AS NOTED
MAY 12.2013 023-RIC-T-1782/13 REINFORCED CONCRETE SLAB AT SUBSTATION
METHOD STATEMENT NO.052 - FIELD CHECKING OF METAL
99 CURTAIN WALL,WINDOWS AND SKYLIGHT FOR WATER EW&ID/RIC/T-763/13 19-Jun-13 CLOSED CLOSED APPROVED AS NOTED
JUNE 15 2013 023-RIC-T-1940/13 LEAKAGE

100 METHOD STATEMENT NO.053 - THIS MOS ATTACHED TO


JUNE 23 2013 023-RIC-L-1511/13 REF.023-RIC-L-1511/13 NO OFFICIAL TRANSMITTAL FOR MOS

101 METHOD STATEMENT NO.054 - FOR THREADED ENGAGEMENT EW&ID/RIC/T-890/13 21-Jul-13 CLOSED CLOSED CONDITIONALLY APPROVED
JUNE 25 2013 023-RIC-T-1995/13 PROCEDURE

102 METHOD STATEMENT NO.055 - RELOCATION OF FLOOR EW&ID/RIC/T-903/13 22-Jul-13 CLOSED CLOSED APPROVED AS NOTED
JULY 14 2013 023-RIC-T-2088/13 OPENINGS @ MECH'L ROOM

103 METHOD STATEMENT NO.056 - METALLIC PIPING EW&ID/RIC/T-902/13 22-Jul-13 CLOSED CLOSED REVISED
JULY 15 2013 023-RIC-T-2091/13 FABRICATION,ERECTION,INSPECTION AND TESTING

104 METHOD STATEMENT NO.056 REV.01 - METALLIC PIPING EW&ID/RIC/T-995/13 14-Aug-13 CLOSED CLOSED APPROVED AS NOTED
AUG. 04 2013 023-RIC-T-2169/13 FABRICATION,ERECTION,INSPECTION AND TESTING

105 METHOD STATEMENT NO.057 - DEMOLITION AND EW&ID/RIC/T-1027/13 21-Aug-13 OPEN REVISE AND RESUBMIT
AUG. 13 2013 023-RIC-T-2211/13 RECONSTRUCTION OF T-7 VALVE CHAMBER WALL

106 METHOD STATEMENT NO.058 - UNDERGROUND FW LINE TIE-IN EW&ID/RIC/T-1041/13 22-Aug-13 CLOSED CLOSED REVISED
AUG. 13 2013 023-RIC-T-2212/13 CONNECTIONS

107 METHOD STATEMENT NO.058 REV.01 - UNDERGROUND FW EW&ID/RIC/T-1127/13 11-Sep-13 CLOSED CLOSED APPROVED AS NOTED
SEPTEMBER 09 2013 023-RIC-T-2329/13 LINE TIE-IN CONNECTIONS

108 METHOD STATEMENT NO.059 - INSTALLATION OF PUMPS EW&ID/RIC/T-1502/13 23-Nov-13 CLOSED CLOSED REJECTED
OCT. 23 2013 023-RIC-T-2553/13 (SPECIAL PROCESS PER SCHEDULE)

109 METHOD STATEMENT NO.060 - NEW SEWER LINE TIE-IN TO EW&ID/RIC/T-1430/13 18-Nov-13 CLOSED CLOSED REVISED
NOV. 05 2013 023-RIC-T-2637/13 EXISTING LIFT STATION # 05

Prepared by: Jailo A. Bantiyan


Page 6 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

110 METHOD STATEMENT NO.060 REV.01 - NEW SEWER LINE TIE- EW&ID/RIC/T-1651/13 9-Dec-13 CLOSED CLOSED APPROVED
NOV. 26 2013 023-RIC-T-2777/13 IN TO EXISTING LIFT STATION # 05
METHOD STATEMENT NO.061 -
111 FLUSHING/CLEANING,HYDROTESTING AND LAY-UP OF ABOVE EW&ID/RIC/T-1628/13 4-Dec-13 CLOSED CLOSED REVISED
NOV. 12 2013 023-RIC-T-2671/13 GROUND,UTILITIES PIPE WORK
METHOD STATEMENT NO.061 REV.01 -
112 FLUSHING/CLEANING,HYDROTESTING AND LAY-UP OF ABOVE EW&ID/RIC/T-1753/13 24-Dec-13 CLOSED CLOSED APPROVED WITH COMMENTS
DEC. 15 2013 023-RIC-T-2894/13 GROUND,UTILITIES PIPE WORK

113 METHOD STATEMENT NO.062 - LEAK TESTING FOR EPDM @ EW&ID/RIC/T-017/14 5-Jan-14 CLOSED CLOSED ACCEPTED
JAN. 01 2014 023-RIC-T-2996/13 ROOF SLABS WATER PROOFING MEMBRANE FOR ALL BLDGS.
METHOD STATEMENT NO.063 - REPAIR WORK OF OPEN
114 TEXTURE FOR LAID ASPHALT PAVEMENT AROUND EW&ID/RIC/T-501/14 26-Mar-14 CLOSED CLOSED APPROVED AS NOTED
MARCH 04 2014 023-RIC-T-3400/14 TRANSFORMER FOUNDATION

METHOD STATEMENT NO.064 - INSTALLATION OF HOLLOW BY REF.023-RIC-T-3492/14


115 EW&ID/RIC/T-426/14 13-Mar-14 CLOSED CLOSED
MARCH 09 2014 023-RIC-T-3428/14 CORE CONNECTING BRIDGE FOR RESD'L BLDGS. TSQ-C-300 EW&ID/RIC/T-473/14

116 METHOD STATEMENT NO.065 - TIE-IN EXIT MANHOLE (MH-12) EW&ID/RIC/T-655/14 22-Apr-14 OPEN RESPONSE REQUIRED
APRIL 02 2014 023-RIC-T-3563/13 FROM NEW MANHOLE (MH-12A) OF NEW WAREHOUSE
METHOD STATEMENT NO.066 - REPAIR OF RUSTED STEEL
117 ANGLE FRAMES OF CHILLED WATER PUMPS IN PUMPHOUSE EW&ID/RIC/T-780/14 13-May-14 CLOSED CLOSED REVISED
MAY 05.2014 023-RIC-T-3749/14 AND RESD'L BLDGS.
METHOD STATEMENT NO.066 REV.01 - REPAIR OF RUSTED
118 STEEL ANGLE FRAMES OF CHILLED WATER PUMPS IN EW&ID/RIC/T-853/14 25-May-14 CLOSED CLOSED ACCEPTED
MAY 13.2014 023-RIC-T-3786/14 PUMPHOUSE AND RESD'L BLDGS.

119 METHOD STATEMENT NO.067 - UNDERGROUND LINE REPAIR EW&ID/RIC/T-845/14 22-May-14 CLOSED CLOSED ACCEPTED WITH COMMENTS
MAY 19.2014 023-RIC-T-3819/14 IN BATTERY ROOM
METHOD STATEMENT NO.068 - FABRICATION,INSTALLATION
120 OF TEMPORARY WYE STRAINERS AT BLDG.222 AND 221 FOR EW&ID/RIC/T-930/14 11-Jun-14 CLOSED CLOSED REFER TO SAPMT COMMENT
JUNE 02 2014 023-RIC-T-3869/14 CHILLED WATER LINES
METHOD STATEMENT NO.069 - WATER FLUSHING AND
121 CHEMICAL TREATMENT OF CHILLED WATER LINE FOR EW&ID/RIC/T-908/14 10-Jun-14 CLOSED CLOSED APPROVED
JUNE 03 2014 023-RIC-T-3877/14 BLDG.222 AND 221
METHOD STATEMENT NO.070 - PRIMER COATING OF RUSTED
122 WELDED JOINT OF Z STEEL DOOR FRAMES AT NEW CLOSED CLOSED BY REF.023-RIC-T-3905/14
JUNE 08 2014 023-RIC-T-3894/14 WAREHOUSE BUILDING (PURLINS)

123 METHOD STATEMENT NO.070 REV.01 - PRIMER COATING OF EW&ID/RIC/T-947/14 17-Jun-14 CLOSED CLOSED APPROVED AS NOTED
RUSTED WELDED JOINT OF Z STEEL DOOR FRAMES AT NEW
JUNE 10 2014 023-RIC-T-3905/14 WAREHOUSE BUILDING (PURLINS) HEMPEL GALVOCOAT
METHOD STATEMENT NO.071 - REPLACEMENT OF DAMAGED
124 CHILLED WATER PIPE INSULATION AND DUCTWORK EW&ID/RIC/T-961/14 28-Jun-14 CLOSED CLOSED APPROVED AS NOTED
JUNE 17 2014 023-RIC-T-3934/14 INSULATION

125 METHOD STATEMENT NO.072 - BORING OF HOLES FOR DINING EW&ID/RIC/T-1128/14 7-Sep-14 CLOSED CLOSED APPROVED AS NOTED
AUGUST 12 2014 023-RIC-T-4077/14 STEEL COLUMNS C1052 AND C1053

126 METHOD STATEMENT NO.073 - FLUSHING AND CHLORINATION EW&ID/RIC/T-1204/14 16-Oct-14 CLOSED CLOSED APPROVED WITH COMMENTS
OCTOBER 06 2014 023-RIC-T-4214/14 OF FIRE WATER SPRINKLER SYSTEM AT BLDG.222 AND 221

Prepared by: Jailo A. Bantiyan


Page 7 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT
METHOD STATEMENT NO.074 - CUTTING AND CHIPPING OF
127 EXISTING LINTEL BEAM AND FOOTING AT DINING EXPANSION EW&ID/RIC/T-1208/14 20-Oct-14 CLOSED CLOSED APPROVED AS NOTED
OCTOBER 11 2014 023-RIC-T-4226/14 BLDG.

128 METHOD STATEMENT NO.075 - REPAIRING OF ELEVATOR PIT EW&ID/RIC/T-1332/14 1-Dec-14 CLOSED CLOSED REVISED
NOVEMBER 26 2014 023-RIC-T-4368/14 FOR WATER TIGHTNESS (RENDEROC PLUG)

129 METHOD STATEMENT NO.075 REV.01 - REPAIRING OF EW&ID/RIC/T-1411/14 18-Dec-14 CLOSED CLOSED APPROVED WITH COMMENTS
DECEMBER 16 2014 023-RIC-T-4454/14 ELEVATOR PIT FOR WATER TIGHTNESS (ABSAR)

130 METHOD STATEMENT NO.076 - INSTALLATION OF PRE-CASTED EW&ID/RIC/T-1355/14 8-Dec-14 CLOSED CLOSED APPROVED AS NOTED
DECEMBER 01 2014 023-RIC-T-4391/14 CAR PARKING SHED CONCRETE FOUNDATION

131 METHOD STATEMENT NO.077 - EXCAVATION FOR TANKS EW&ID/RIC/T-0006/15 5-Jan-15 CLOSED CLOSED APPROVED WITH COMMENTS
DECEMBER 31 2014 023-RIC-T-4519/14 FOUNDATIONAT MBR PLANTS

132 METHOD STATEMENT NO.078 - FIRE POTABLE WATER EW&ID/RIC/T-257/15 14-Apr-15 CLOSED CLOSED APPROVED AS NOTED
APRIL 12,2015 023-RIC-T-4820/15 STORAGE TANK CHLORINATION

133 METHOD STATEMENT NO.079 - CUT AND SPLICE FOR MV EW&ID/RIC/T-353/15 24-May-15 CLOSED CLOSED APPROVED
APRIL 21,2015 023-RIC-T-4849/15 CABLE AT MBR
METHOD STATEMENT NO.080 - REPAIRING OF CRACKS ON
134 REINFORCED CONCRETE GRADE SLAB AT TAXIWAY (SHRINK EW&ID/RIC/T-768/15 18-Nov-15 CLOSED CLOSED REJECTED
NOVEMBER 15 2015 023-RIC-T-5494/15 GROUT)

135 METHOD STATEMENT NO.081 - REPAIRING OF CRACKS ON EW&ID/RIC/T-789/15 1-Dec-15 CLOSED CLOSED APPROVED
NOVEMBER 16 2015 023-RIC-T-5504/15 REINFORCED CONCRETE GRADE SLAB AT TAXIWAY (EPOXY)

METHOD STATEMENT NO.082 - RECTIFICATION OF INSTALLED


136 1 NO.STATIC GROUNDING WELL ON CONCRETE GRADE SLAB EW&ID/RIC/T-775/15 25-Nov-15 CLOSED CLOSED APPROVED
NOVEMBER 23 2015 023-RIC-T-5513/15 AT TAXIWAY

137 METHOD STATEMENT NO.083 - EXISTING AERATION TANK EW&ID/RIC/T-804/15 8-Dec-15 CLOSED CLOSED APPROVED AS NOTED
NOVEMBER 23 2015 023-RIC-T-5514/15 CONNECTIONS FOR MBR REQUIREMENTS

138 METHOD STATEMENT NO.084 - WATER LEAK REPAIR ON MBR EW&ID/RIC/T-774/15 24-Nov-15 CLOSED CLOSED APPROVED AS NOTED
NOVEMBER 23 2015 023-RIC-T-5520/15 TANK (RENDEROC PLUG)
METHOD STATEMENT FOR FIRE STOP APPLICATION (MEP
139 PENETRATION AND CONSTRUCTION JOINTS) HILTI (RISE AND EW&ID/RIC/T-601/13 12-May-13 CLOSED CLOSED APPROVED AS NOTED
MAY 05.2013 023-RIC-T-1768/13 SHINE)

REVOKED BY REF.023-RIC-L-
140 ADDITIONAL FIRE STOPPING ASSEMBLY FROM HILTI (IN CLOSED CLOSED
1496/13
JUNE 04 2013 023-RIC-T-1891/13 ADDITION TO MOS REF.023-RIC-T-1768/13)

141 METHOD STATEMENT OF DISINFECTION OF WATER EW&ID/RIC/T-885/13 17-Jul-13 CLOSED CLOSED REVISED
JULY 02 2013 023-RIC-T-2025/13 DISTRIBUTION SYSTEM FOR NGL PIPING (WATER PROJECT)

142 REVISED METHOD STATEMENT OF DISINFECTION OF WATER EW&ID/RIC/T-1026/13 19-Aug-13 CLOSED CLOSED APPROVED WITH COMMENTS
AUG. 15 2013 023-RIC-T-2223/13 DISTRIBUTION SYSTEM FOR NGL PIPING (WATER PROJECT)

143 METHOD STATEMENT OF FIELD LAMINATION OVER THE EW&ID/RIC/T-998/13 14-Aug-13 CLOSED CLOSED APPROVED AS NOTED
AUG. 04 2013 023-RIC-T-2180/13 ADHESIVE JOINT (FPI)

144 METHOD STATEMENT SCHUCO STICK CURTAIN WALL EW&D/RIC/T-1224/13 3-Oct-13 CLOSED CLOSED APPROVED AS NOTED
SEPTEMBER 04 2013 023-RIC-T-2314/13 DETAILED INSTALLATION

Prepared by: Jailo A. Bantiyan


Page 8 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

145 ELECTRICAL METHOD STATEMENT (MV CABLE SPLICING AND EW&ID/RIC/T-1252/13 9-Oct-13 CLOSED CLOSED REVISED
OCTOBER 02 2013 023-RIC-T-2452/13 TERMINATION,MEGGER)

146 REVISED 01 ELECTRICAL METHOD STATEMENT (MV CABLE EW&ID/RIC/T-1397/13 5-Nov-13 CLOSED CLOSED ACCEPTED WITH COMMENTS
OCTOBER 22 2013 023-RIC-T-2545/13 SPLICING AND TERMINATION,MEGGER)

147 METHOD STATEMENT TIE-IN PACKAGE NO.01 NEW RESD'L EW&ID/RIC/T-1307/13 23-Oct-13 CLOSED CLOSED APPROVED AS NOTED
OCTOBER 13 2013 023-RIC-T-2474/13 BLDG.

METHOD STATEMENT TIE-IN PACKAGE NO.01 REV.01 NEW EW&ID/RIC/T-1555/13


148 EW&ID/RIC/T-1618/13 4-Dec-13 OPEN REVISE AND RESUBMIT
NOVEMBER 19 2013 023-RIC-T-2474A/13 RESD'L BLDG.

149 METHOD STATEMENT TIE-IN PACKAGE NO.02 NEW RESD'L EW&ID/RIC/T-1556/13 28-Nov-13 OPEN REVISE AND RESUBMIT
NOVEMBER 20 2013 023-RIC-T-2737/13 BLDG.

150 METHOD STATEMENT TIE-IN PACKAGE NO.03 SUBSTATION EW&ID/RIC/T-1558/13 28-Nov-13 OPEN REVISE AND RESUBMIT
NOVEMBER 20 2013 023-RIC-T-2738/13 AND CHILLYARD

151 METHOD STATEMENT TIE-IN PACKAGE NO.04 SUBSTATION EW&ID/RIC/T-1560/13 28-Nov-13 OPEN REVISE AND RESUBMIT
NOVEMBER 20 2013 023-RIC-T-2739/13 AND CHILLYARD

152 EW&ID/RIC/T-1562/13 28-Nov-13 OPEN REVISE AND RESUBMIT


NOVEMBER 20 2013 023-RIC-T-2740/13 METHOD STATEMENT TIE-IN PACKAGE NO.05 NEW CHILLERS

153 METHOD STATEMENT APPLICATION OF INTERNAL CEMENT EW&ID/RIC/T-357/14 27-Feb-14 CLOSED CLOSED APPROVED WITH COMMENTS
FEBRUARY 23 2014 023-RIC-T-3338/14 MORTAR FOR FIRE HYDRANT RISER (PAN GULF)

154 METHOD STATEMENT FOR CHEMICAL CLEANING OF CHILLED EW&ID/RIC/T-679/14 27-Apr-14 CLOSED CLOSED APPROVED
FEBRUARY 24 2014 023-RIC-L-1716/14 WATER PIPING
METHOD STATEMENT OF WORK SCHEDULE FOR
155 RECTIFICATION OF WRONGLY TERMINATED CABLES AT MV EW&ID/RIC/T-495/14 27-Mar-14 CLOSED CLOSED ACCEPTED
MARCH 09 2014 023-RIC-T-3459/14 SWITCHGEAR

156 AL-MARAE METHOD STATEMENT FOR FIBER OPTIC CABLE 276 EW&ID/RIC/T-1065/14 14-Aug-14 CLOSED CLOSED APPROVED AS NOTED
AUGUST 11 2014 023-RIC-T-4070/14 37-60 SPLICING/TERMINATION AND TESTING (CUT-OVER)
CONFIRMED FROM PMT
157 METHOD STATEMENT FOR LOAD TESTING PROCEDURE OF CLOSED CLOSED DOC/CON APRIL 26,2015 AS PER
DECEMBER 24 2014 023-RIC-T-4494/14 ELEVATORS AT RESIDENTIAL BUILDING 221,222,223 MR. BHANDER
METHOD STATEMENT FOR ROAD MARKING (DASCO DAFER
158 OPEN UNDER REVIEW
NOVEMBER 08 2015 023-RIC-T-5477/15 SUPPLY AND CONTRACTING)

Prepared by: Jailo A. Bantiyan


Page 9 of 10
Document Controller
SR No. DATE TRANSMITTED REFERENCE N0. SUBJECT REMARKS
TRANSMITTAL DATE MMG PMT

Prepared by: Jailo A. Bantiyan


Page 10 of 10
Document Controller

You might also like