0% found this document useful (0 votes)
61 views

Project Name:Geotechnical Investigation Work Under Jurdiction of Govt. Assam, PWD Roads Dept

Uploaded by

Hoque joynul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
61 views

Project Name:Geotechnical Investigation Work Under Jurdiction of Govt. Assam, PWD Roads Dept

Uploaded by

Hoque joynul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 1

Date:

Depth(m) 1.0M

Surcharges
Weight(Kg) 5

Diameter of
Condition of test: Soaked Plunger(mm) 50

Initial Dial Area Of


Gauge Reading(mm) 2.00 Client:-Govt. Of Assam, PWD Roads Dept. Plunger(sq.cm) 19.625

Final Dial 3.5 Road Name:-Nagaon Morikolong Nonoi Road to NH 37 via Morikolong Type Of Heavy
Gauge Reading(mm) Borghat Compaction Compaction

Least count of
Initial Height 120.00 DETERMINATION OF CALIFORNIA BEARING RATIO gauge 0.002
of Sample(mm)
(mm/div.)

Proving ring
Expansion Ratio(%) 1.250 IS:2720(Part16)-1987 constant 7.06
(kg/div.)

Project Name:Geotechnical investigation Work under Jurdiction of Govt.


Assam,PWD Roads Dept. Test Pit No. 1

TEST Results

Design CBR CBR


Proving CBR
Penetration Ring Dial Load on Correced Standard Max.Dry Opt. Value For Value as per Value Based on
Dial Gauge Gauge Plunger Load Load CBR density moisture 2.5 & 5.0mm IS:2720(part16) Dry density.
Reading Reading (Kg/sq.c (Kg/sq.cm (Kg/sq.cm Value (γd) Content Penetration -1987,cls 7.3. CBR=0.32(yd)^4
(%) (%) .54
(mm) (Division m) ) ) gm/cc (%) respectively
s) (%) (%)

0.0 0.0 0.00 - 0.00 -


0.5 2.5 0.90 - 11.00 -
1.0 4.6 1.65 - 26.00 -
4.94
1.5 6.8 2.45 - 40.00 -
2.0 8.5 3.06 - 55.00 -
2.5 10.5 3.78 3.46 70.00 4.94
- - 4.94 -
3.0 13.4 4.82 - 82.00 -
4.0 16.7 6.01 - 95.00 -
5.0 18.3 6.58 5.10 105.00 4.86
4.86
7.5 19.5 7.02 - 134.00 -
10.0 20.0 7.19 - 162.00 -
12.5 20.1 7.23 - 183.00 -

15.00
L 14.00
o
13.00
a
d 12.00
o 11.00
n 10.00
Pl 9.00
u
8.00
n
7.00
g
6.00
e
r 5.00
(K 4.00
g 3.00
/ 2.00
s 1.00
q.
0.00
c 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 11.0 11.5 12.0 12.5 13.0 13.5 14.0
m
)
Penetration Of Plunger(mm)

You might also like