0% found this document useful (0 votes)
73 views1 page

Thermax Melange Spinning Mills LTD.: Generator Section

The document is a maintenance schedule for a generator at Thermax Melange Spinning Mills Ltd. It lists work done on the G-3508 engine including checking the turbocharger and air filter, measuring air gaps, inspecting cylinders and pistons, cleaning and replacing spark plugs, adjusting valves and bearings, greasing alternator bearings, checking electrical cables, and running tests with the generator set. It notes that two tapped screws and a jam nut need replacing for the next maintenance scheduled at 26208 hours of operation.

Uploaded by

Abstruse Ron
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views1 page

Thermax Melange Spinning Mills LTD.: Generator Section

The document is a maintenance schedule for a generator at Thermax Melange Spinning Mills Ltd. It lists work done on the G-3508 engine including checking the turbocharger and air filter, measuring air gaps, inspecting cylinders and pistons, cleaning and replacing spark plugs, adjusting valves and bearings, greasing alternator bearings, checking electrical cables, and running tests with the generator set. It notes that two tapped screws and a jam nut need replacing for the next maintenance scheduled at 26208 hours of operation.

Uploaded by

Abstruse Ron
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Thermax Melange Spinning Mills Ltd.

Generator Section
Karardi, Shibpur, Narsingdi
Date: 13/02/2019

Schedule Maintenance work:


Engine Model G-3508 Serial No. CPJ-00500 Arr. No. 260-3676 Oil Brand CAT Adv. 40

SMU 25208 Load(KW) 300 KW Manifold Temp. N/A J/W Temp. 185 °F
RPM 1500 Freq. 50.00Hz Voltage 405 Oil Pressure 58Psi

We have done the following work:


 Check Turbo Charger & found ok.
 Check Air Filter & Clean it.
 Air Gap measure between PMG & Exciter.

0.028”

0.034” 0.048”

0.044”

 Check Cylinder head Piston, Rotocoil, Lock, Spring found ok.


 Spark Plug clean & Gasket change by new one.
 Adjusted Engine Valve Lash & Bridge.
 Greasing Bearing of alternator.
 Check all Harness of gen-set & Electrical Cables found ok.

N.B. Need to arrange next maintenance 2pcs Tapped Screw & Jam Nut.

After completed the maintenance work run the Gen-Set with above load. From observation all
parameter reading found ok. Next Maintenance will be carried out at 26208R/H.