0% found this document useful (0 votes)
107 views14 pages

C411 Agile Fiber Shelves 860647710 Jan 19

Uploaded by

Nancy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views14 pages

C411 Agile Fiber Shelves 860647710 Jan 19

Uploaded by

Nancy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

860647710

Issue 1, Jan 2019


www.commscope.com

AGL Panel

General
The AGL panel is designed for use in rack, which has a faceplate. It can be installed with G2 modules and fiber
management trough. The G2 modules and fiber management trough must be purchased separated. These
panels are intended for indoor use, but may be used outdoors in a suitable enclosure.
Ordering information is listed below:

Material ID Part No. Description


760241517 AGL-1U-FX 1U shelf, Open Rear, Fixed
760241518 AGL-1U-ANG-FX 1U shelf, Open Rear, Angle, Fixed
760242453 AGL-1U-SL 1U shelf, Open Rear, Sliding
760242454 AGL-1U-ANG-SL 1U shelf, Open Rear, Angle, Sliding
760242455 AGL-1U-DRW-SL 1U shelf, Drawer, Sliding
760242475 AGL-1U-ENC-FX 1U shelf, Enclosed, Fixed
760242476 AGL-1U-ENC-SL 1U shelf, Enclosed, Sliding

760241517 AGL-1U-FX 760241518 AGL-1U-ANG-FX

760242453 AGL-1U-SL 760242454 AGL-1U-AGL-SL

©2019 CommScope, Inc. All rights reserved Page 1 of 14


www.commscope.com
860456664
Instruction Sheet

760242455 AGL-1U-DRW-SL 760242475 AGL-1U-ENC-FX

760242476 AGL-1U-ENC-SL

How to Contact Us
• To find out more about CommScope® products, visit us on the web at http://www.commscope.com/
• For technical assistance, customer service, or to report any missing/damaged parts, visit us at
http://www.commscope.com/SupportCenter

Tools Required
• Phillips-head screwdriver

Parts List
Verify parts against the parts list below:
Quantity Description
1 Shelf assembly (fixed or sliding)
4 #12-24 x 1/2-inch screws for 19-inch and 23-inch (483mm) rack mounting

! Important Safety Cautions


• Disconnected optical components may emit invisible optical radiation that can damage your eyes.
Never look directly into an optical component that may have a laser coupled to it. Serious and
permanent retinal damage is possible. If accidental exposure to laser radiation is suspected, consult a
physician for an eye examination.
• Wearing safety glasses during installation of this shelf is recommended. Although standard safety
glasses provide no protection from potential optical radiation, they offer protection from accidental
airborne hardware and cleaning solvents.

Page 2 of 14
www.commscope.com 860456664
Instruction Sheet

Installation for 760241517 & 760241518


Rear plate
Rear plate Arm

760241517 760241518
1. Open the package, open arm, and install the rear plate to arm.

Mount Shelf to Rack

12-24 mounting
screw (4 places)

Standoff
(2 places)
Faceplate

1. Determine the rack size and desired mounting location.


• For 19-inch (483mm) rack – Mount shelf to rack using the pre-installed mounting brackets and four #12-
24 x 1/2-inch screws (provided) as shown.
• For 23-inch (584mm) rack – Use G2-23BRKT accessory kit (available separately) and install two
conversion brackets to pre-installed mounting brackets, using four #10-32 x 3/8-inch conversion screws
included in accessory kit. Use one conversion bracket and two screws per side. Mount shelf to rack
using four #12-24 x 1/2-inch screws (provided as part of basic shelf).
• For ETSI rack – Use G2-23BRKT accessory kit (available separately) and install one conversion bracket
to either of the pre-installed mounting brackets, using two of four #10-32 x 3/8-inch conversion screws
included in accessory kit. The shelf will not be centered when mounted in rack. Mount shelf to rack
using four M6 x 12mm screws (not be provided as part of basic shelf).

Page 3 of 14
www.commscope.com
860456664
Instruction Sheet

Install the Modules to the Shelf (For all shelfs)

Module

Install the Front Trough to the shelf (Only for 760241517 / 760242453 / 760242455 /
760242475 / 760242476)

Screw
(8-32X3/8 or M4x8mm)

Front Trough

Note:
1. The Front Trough 760193938 should be purchased separately.
2. For 760242475 / 760242476, using the screw #8-32 x 3/8 inch 2 pcs (provided as part of the Trough).
3. For 760241518 / 760242453 / 760242455, using the screw M4 x 8mm 2 pcs (not provided).

Page 4 of 14
www.commscope.com 860456664
Instruction Sheet

Install the Tray to shelf (Only for 760242455 / 760242475 / 760242476)

Screw M3 x 6mm 2 pcs

Tray Kit

Note:
1. The Tray Kit 760241378 should be purchased separately.
2. Using M3 x 6mm 2 pcs to install the tray shelf (provided as part of the Tray Kit).

Cable Fixed
760241517 & 760241518 Nylon cable tie

Cable

Page 5 of 14
www.commscope.com
860456664
Instruction Sheet

760242453 & 760242454

Cable Nylon cable tie

760242455

Remove the rear plate

Cable
Nylon cable tie

Page 6 of 14
www.commscope.com 860456664
Instruction Sheet

760242475 & 760242476

Cable gland

Fiber cable

Cable gland nut

Cable entry slot

Cable Gland Method (Preferred)

Hose clamps
(install over
outer sheath
of cable only)

Build up cable
diameter using
tape as required
Hose Clamp Method (Alternate)

Page 7 of 14
www.commscope.com
860456664
Instruction Sheet

Note: For smaller diameter cables, the 600-SRF kit (ordered separately) provides two liquid-tight fittings with a
smaller inside diameter. The smaller diameter fittings would be more appropriate for these cables.

Route and Secure Fiber Cable (Fixed Shelf)

Store slack fiber in shelf

Cable
gland

Rear
entry

Rear apron Side entry

Cable tie or
Cable tie or hook-and-loop
hook-and-loop strip strip 3 inch(76mm)
Fiber cables approximately
48 inch(1.2m) length each below shelf

Note: These instructions cover only the cable gland method of securing fiber cables to the shelf.
1. Loosely secure fiber cable to equipment rack upright approximately 3 inches (76mm) above or below shelf,
using cable tie or hook-and-loop strip. Leave approximately 48-inch (2.1m) length of cable to route into
shelf.
2. Fiber cables may enter shelf from either right side, left side or rear apron. Carefully loop fiber cable to rear of
shelf on either side and continue to feed cable over top of rear apron. Loosely secure cable to rear of shelf
as shown above, using a cable tie or hook-and-loop strip.
3. Temporarily store slack fibers in shelf.
4. Remove plug from appropriate size opening in shelf to accommodate cable gland on fiber cable.
Select an opening on rear apron or either right or left side that will be most advantageous for cable entry.
5. Completely loosen gland nut from cable gland.

Page 8 of 14
www.commscope.com 860456664
Instruction Sheet

6. Feed fibers and subunit tubes through opening in shelf and temporarily coil fibers loosely inside shelf.
7. Rotate gland nut as required to allow it to pass through opening and enter shelf.
Note: It may be necessary to temporarily remove a plug from an adjacent opening to provide sufficient
clearance for gland nut to be inserted through opening.
8. Insert threaded body of cable gland into opening and tighten gland nut onto threaded section to secure
cable gland unit to shelf.

Route and Secure Fiber Cable (Sliding Shelf)

Store slack fiber in shelf

Cable tie or
hook-and-loop strip

Sliding shelf
fully extended

Cable gland
Plugs Rear
Method B (typical) apron
Fiber cable Cable tie or
dressed over hook-and-loop
shelf slide strip 3 inch(76mm)
below shelf

Fiber management Method A


Fiber cable looped to shelf slide Cable ties or
bar
on opposite side of panel from hook-and-loop strips installed
entry point into shelf on outside of shelf slide

1. Fiber cables may enter shelf from either right side, left side or rear apron. Carefully loop fiber cable to rear of
shelf on either side and continue to feed cable over top of rear apron. Loosely secure cable to rear of shelf
as shown above, using a cable tie or hook-and-loop strip.
2. Temporarily store slack fibers in shelf.
3. Remove plug from appropriate size opening in shelf to accommodate cable gland on fiber cable. Select an
opening on rear apron that will be most advantageous for cable entry.
4. Completely loosen gland nut from cable gland.
5. Feed fibers and subunit tubes through opening in shelf and temporarily coil fibers loosely inside shelf.
6. Rotate gland nut as required to allow it to pass through the opening and enter shelf.
Note: It may be necessary to temporarily remove a plug from an adjacent opening to provide sufficient
clearance for gland nut to be inserted through opening.
7. Insert threaded body of cable gland into opening and tighten gland nut onto threaded section to secure
cable gland unit to shelf.

Page 9 of 14
www.commscope.com
860456664
Instruction Sheet

Method A
1. Working back from where the fiber cable enters shelf (at a cable gland), carefully loop cable over rear fiber
management bar and then to outside of shelf slide on opposite side of panel from cable entry point as
shown. Maintain cable in as small of a radius as possible while not exceeding minimum bend radius for
cable. Secure fiber cable to shelf slide in at least two places using cable ties or hook-and-loop strips
threaded through slots and punches provided in rails. Do not secure cables to fiber management bar.
2. From shelf slide, route cable to equipment rack and loosely secure cable to rack upright approximately 3
inches (76mm) above or below shelf, using a cable tie or hook-and-loop strip.
Note: Do not exceed minimum bend radius for fiber cable.
3. Verify that shelf retracts and extends fully before proceeding.

Method B
Note: This method reduces the slack loop length at rear of shelf but it requires an open space of at least 1U
above a 1U shelf to work. 2U shelves do not have this restriction.
1. Working back from where the fiber cable enters shelf (at a cable gland), carefully loop cable over rear fiber
management bar and then across shelf slide on opposite side of chassis from cable entry point as shown.
Maintain cable in as small of a radius as possible while not exceeding the minimum bend radius for the
cable. Do not secure cables to fiber management bar or drawer slide.
2. Route cable to equipment rack and loosely secure cable to rack upright approximately 3 inches (76mm)
above or below shelf, using a cable tie or hook-and-loop strip.
3. Verify that shelf retracts and extends fully before proceeding.
4. Figure below shows typical fiber loop when shelf is retracted.

Shelf fully retracted

Method B

Cable ties or
hook-and-loop strips
Method A
Slack loop of fiber
cables with shelf in
retracted position

Page 10 of 14
www.commscope.com 860456664
Instruction Sheet

Splice Tray Kit (760241378, ordered separately)


The stackable splice tray’s L x W x H is 220mm x 102mm x 10.2mm and its capacity is as below:

Cable type Store capacity Splice capacity SMOUV holder type SMOUV layer

0.25mm single fiber 48F 48F SMOUV 1120-1 L=45mm


or Single layer for (Max 24F)
0.9mm single cable 48F 48F SMOUV 1120-2 L=60mm Dual layer for (Max 48F)

The transparent plastic top cover is snapped on to protect the routed fiber and splices while providing optimum
visibility for inspection. Multiple trays could be snapped and stacked directly. Hinged design is also for easily
operation and maintenance.
This product can be used indoor or outdoor in a suitable protective enclosure.
Note: Sample product image is shown as Figure 1.

Figure 1

Tools Required
• Cable Stripper and cutters
• Fusion splice machine and related tools

Verify parts against parts list below:


Quantity Description
1pc
FOSC550A IL TRAY
1pc FOSC550A IL TRAY LID
2pcs SMOUV HOLDER
48pcs SMOUV-1120-01 (Not shown in Figure 2)
4pcs TRAY TABS CH (Not shown in Figure 2)
2pcs SCR,FH,TAP,XRES,M3X6,STL,TRICHRBLU (Not shown in Figure 2)
0.2m FOAM-STRIP-EPDM-ZK-15X1 (Not shown in Figure 2)
0.2m SPIRAL TUBE (Not shown in Figure 2)
8pcs NYLON TIE WRAP 142MM (Not shown in Figure 2)

Page 11 of 14
www.commscope.com
860456664
Instruction Sheet

Step 1 – Prepare tray kits for splicing


1. Remove the cover from the tray kit, also remove the film if there’s film on the cover as shown Figure 3.

Figure 3
2. It is recommended to use same side tray cable entrances for the pigtails entry, the other side for
incoming cables. For example, for the pigtails, we could use the back side two cable entrances, the
back-left side for 24F 0.9mm single cables, back-right side for another 24F. For the incoming cables,
use the front side cable entrance, the front-right side for 48F cables if they are from the left side opening
of shelf, otherwise use the front-left side, as Figure 4.

Figue 4

Step 2 – Prepare the pigtails with LC/SC connectors for splicing


1. Be sure sufficient slack exists for pigtails inside the shelf when the splicing tray used.
2. Twine foam around 24F pigtails after reserving approximately 500mm length of cables for splicing.
Choose the back-right side tray cable entrance for cable entry.
3. Using the provided nylon tie wrap, loop it through the slot in the tray and around foam. Tighten cable tie
for fixture. Make sure the head of the cable tie is on the bottom side of the foam, as Figure 5.

Page 12 of 14
www.commscope.com 860456664
Instruction Sheet

4. Route fibers in the tray, use foam to hold it temporary if needed as Figure 5. While splicing, first batch
12F as the first layer, second batch 12F as the second layer put in the SMOUV holder A.

Figue 5
5. Twine foam around another 24F pigtails after reserving approximately 250mm length of cables
for splicing. Choose the back-left side tray cable entrance for cable entry.
6. Using the provided nylon tie wrap, loop it through the slot in the tray and around foam. Tighten
cable tie for fixture. Make sure the head of the cable tie is on the bottom side of the foam, as
Figure 6.
7. Route fibers in the tray and use foam to hold it temporary if needed as Figure 6. While splicing,
first batch 12F as the first layer, second batch 12F as the second layer put in SMOUV holder B.

Figure 6

Step 3 – Prepare Incoming Cable for Splicing


1. Be sure sufficient slack exists for 900µm incoming cables inside the shelf when the splicing tray used.
2. Twine foam around 48F single cables after reserving approximately 250mm length of cables for splicing.
Choose the back-right side tray cable entrance for cable entry, assumed the cable is from the left side
opening of the shelf as Figure 7; otherwise, choose the back-left side tray cable entrance.
3. Using the provided nylon tie wrap, loop it through the slot in the tray and around foam. Tighten cable tie
for fixture. Make sure the head of the cable tie is on the bottom side of the foam as Figure 7.

Page 13 of 14
www.commscope.com
860456664
Instruction Sheet

Figure 7

Step 4 – Splicing, install the tray tabs, install the cover


1. Splice 48F fibers per related instructions. Route spliced fibers into tray and secure SMOUVs in
SMOUV holders before continuing with splicing. Splicing finished is shown as Figure 8.

Figure 8
2. Install the four tabs and ensure no fibers are snagged, pinched in the tray, then install the cover as
Figure 9.

Figure 9
Note: It is recommended to splice in one layer in the SMOUV holder if no more than total 24F fibers splicing
application in a tray.