0% found this document useful (0 votes)
70 views1 page

Genwec Approval EMP-31-TR-192-VOL-PLU-MAT-0022 (00) B (Dubai, UAE)

The document discusses the delivery and installation of materials for a project. It states that the proposed materials are accepted pending final quantities from drawings, and original documentation must be provided at delivery. Shop drawings must also use the actual design and dimensions of the provided items. Storage, installation, protection and operation of the items must follow the manufacturer's requirements.

Uploaded by

Armağan Demirel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views1 page

Genwec Approval EMP-31-TR-192-VOL-PLU-MAT-0022 (00) B (Dubai, UAE)

The document discusses the delivery and installation of materials for a project. It states that the proposed materials are accepted pending final quantities from drawings, and original documentation must be provided at delivery. Shop drawings must also use the actual design and dimensions of the provided items. Storage, installation, protection and operation of the items must follow the manufacturer's requirements.

Uploaded by

Armağan Demirel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1- Proposed material is accepted and subject to final quantities as per drawings

2- Provide original bill of landing, country of origin, certificates,..... at the time of delivery
3- provided items to be used with their actual design/dimensions in the shop drawings.
4- Storage, installation, protection and operation to be as per manufacturer requirements