Project : 25MW MULTI FUEL FIRED CO .GEN POWER PLANT SAMAL,BATAAN, PHILLIPINES.
Doc. No: 8084 – 001 – 60, Rev-02
Date : 13-07-2018
Document: Generator Protection Relay Settings.
Page 1 of 13
All Setting values are i n secondary values in MICOM P343 relay.
Active Settings Group 1
Page 2 of 13
FFail2 xb2 = KV2 / MVA x 16 = 97.505 Ohm
FFail2 time Delay: 4 Sec
FFail2 DO timer: 2 Sec
FFail Dim Line: Disabled
Under Voltage Element 1 to 86GRA & 86GRB (Trip to Grid Master Trip Relay)
Operate V< Measur’t mode : Phase to Phase
V< Operate mode : Any Phase
V<1 Function : DT
V<1 Voltage set : 1 01 V
V<1 time delay : 1.0 Sec
V<1 Pole Dead Inh : Enabled
Under Voltage Element 2 to 86GA & 86GB (Trip to Generator Master Trip Relay)
V<2 status : Enabled
V<2 Voltage set : 99 V
V<2 time delay : 3 .0 Sec
V<2 Pole Dead Inh: Enabled
Over Voltage Element 1 to 86GRA & 86GRB (Trip to Grid Master Trip
Relays)
V>1 Measurement Mode: Phase to Phase
V> Operate Mode : Any Phase
V>1 Function : DT
V>1 Voltage set : 119.0 V
V>1 time delay : 1.0 Sec
Over Voltage Element 2 to 86GA & 86GB (Trip to Generator Master Trip
Relays)
V>2 status Enabled
V>2 Voltage set : 121.0V
Page 3 of 13
V>2 time delay : 2.0 Sec
NPS over Voltage:
V2>1 Status: Disabled.
Under Frequency Element 1 to 86 GRA & 86 GRB (Trip to Grid Master Trip
Relays)
F<1 status Enabled
F<1 setting : 57.6 Hz
F<1 time delay : 1.0 Sec
Under Frequency Element 2 to 86 GA & 86GB (Trip to Generator Master
Trip Relays)
F<2 status Enabled
F<2 setting : 57 Hz
F<2 time delay : 3.0 Sec
F<3 status Disabled
F<4 status Disabled
F<Function Link: 0000
Over Frequency Element 1 to 86 GRA and 86 GRB (Trip to Grid Master Trip
Relays)
F>1 status Enabled
F>1 setting : 62.4 Hz
F>1 time delay : 1.0 Sec
Over Frequency Element 2 to 86 GA and 86 GB (Trip to Generator Master Trip Relays)
F>2 status Enabled
F>2 setting : 63 Hz
F>2 time delay : 8.0 Sec
Turbine F Protection:
Page 4 of 13
Turbine F Status: Disabled.
7) DF/DT (81R)
NPS Alarm stage 1 trip to 8 6 G RA & 86 GRB (Grid Master Trip Relays)
I2therm>1 Alarm Enabled
I2therm>1 Current set: 70.0 mA
I2therm>1 time delay: 4.0 Sec
NPS Trip stage 2 to 86GA & 86 GB (Trip to Generator Master Trip Relays)
I2therm>2 Trip :Enabled
I2therm>2 Current set : 80.0 mA
I2therm>2 K setting : 6 Sec
I2therm>2 K reset : 2.0 Sec
I2therm>2 t max : 1.000 K Sec
l2therm>2 t min : 60.0 Sec
Backup Function: Voltage Controled o v e r c u r r e n t (51V) to operate 86GA & 86GB (Trip
to Generator Master Trip Relays)
Page 5 of 13
Vector rotation: None
V dep OC Char: IEC S Inverse
V dep OC I> set : 900 mA
V dep OC TM : 0.3
V dep OC t reset : 0.000 Sec
V dep OC V<1 set : 99.0 V
Vdep OC V<2 set : 33.0V
V dep OC K set : 0.250
Z<Function: Enabled
Vector rotation: None
Z<1 status: 2 Sec
Z<1 setting: 6.159 Ohm
Z<1 time delay: 2 Sec
Z<1 Reset: 0 Sec
Z<2 status: Disabled
Reverse power setting is recommended to be set based on the mechanical loss of turbine
and generator + No load electrical losses of generator,
This is approximately 1 %.
Generator capacity in 0.8 PF in MW: 25 MW
At 1% Power level at Primary in MW: 25 x 0.01 = 0.25 MW
At 1% Power level at Sec. in Watts: 0.25x 106 / (CT Ratio x PT Ratio) = 1.245 Watts
Page 6 of 13
11) Low Forward Power (32L)
Comp Angle : 0 Deg
Power 1 function : Under power
Power 1 direction : Forward
Power 1 mode : Active
Power 1 3 Phase watts : 1 watts
P o w e r 1 t i me d el a y : 1 s ec
P1 Pole dead inh : Enabled.
Operate to 86TA & 86 TB (Turbine Master Trip Relays) & 86 GA & 86GB (Generator Master Trip
Relays)
IN> Input: Measured
IN>1 function : IEC S Inverse
IN>1 Current set : 100.0 mA
IN>1 TMS : 0.15
IN>1 t reset : 0.000 Sec
IN>2 Function : DT
IN>2 Current : 100 mA.
IN>2 Time Delay : 750 mSec.
Page 8 of 13
16) Neutral Voltage Displacement protection (59N)
Operate to 86TA & 86 TB (Trip to Turbine Master Trip Relays) & 86GA & 86 GB (Trip to Generator
Master Trip Relays)
VN >3 Status : Enabled.
VN> 3 Input : VN1
VN >3 Function :IDMT
VN>3 Voltage set : 4 volts
VN>3 TMS : 0.5
VN>3 tReset : 0 Secs
VN>4 status : Enabled
VN>4 Input : VN1
VN>4 Function : IDMT
VN>4 Voltage set : 5 Volts
VN>4 TMS : 0.5
VN>4 treset : 0 Secs
17) 100% Stator EF (27TN)
Operate to 86 TA & 86 TB (Trip to Turbine Master Trip Relays) & 86 GA & 86GB (Trip to Generator
Master Trip Relays)
100% St EF status: VN3H > Enabled
100% St EF VN3H > 7 Volts (Note : setting to be assigned after seeing this third harmonic voltage
at full load).
VN3H > Delay: 2.00 S
21) Current operated Backup earth fault relay (CDG11, Alstom Make)
Operate to 86 TA & 86 TB (Trip to Turbine Master Trip Relays) & 86 GA & 86 GB (Trip to Generator
Master Trip Relays)
Current setting: 10 %, (0.10 Amps)
Function: IDMT
CT ratio : 1 00 /1 Amps.
TMS : 0 . 25 .
Rotor Earth Fault: Ist stage (Alarm): 20.0 K Ohms, Time – 2 seconds.
IInd stage (Trip): 8 K Ohms, Time – 3 seconds.
Page 11 of 13
23) Generator Stator Winding Temperature High:
Page 12 of 13
29) Thermal Over load Protection:
ISEF>1 Function:DT
ISEF>1 Direction:Non-directional
ISEF>1 Current:100 mA
ISEF>1 Delay: 1 Sec
Page 13 of 13